A Study on Improvement of a Production System in Small and Medium Sized Shoes Companies using Simulation

시뮬레이션을 이용한 중소 신발생산기업의 생산시스템 개선방안 연구

  • Received : 2004.07.02
  • Accepted : 2005.01.20
  • Published : 2005.03.31

Abstract

A production system in domestic shoes companies has difficulty in achieving automation and information because of insufficiency of flexibility and standardization. Particularly small and medium sized shoes companies producing by OEM have tendency to chase the given production schedule blindly without considering major factors that may affect the production. Therefore, the production schedules or the process conditions can not be optimally set and are extemporized by the experience in the past. These behaviors cause low productivity and financial loss. To maximize efficiency and productivity of the shoe-making process, we develop a simulation model based on a production system in small and medium sized shoes companies. The model has been developed using ARENA which has been demonstrated to be a powerful tool to simulate various manufacturing systems. Using the simulation model, we find out several problems for the production process, and then suggest several alternatives to improve the system.

Keywords

References

  1. Moon, D-H., Sung, J-H., and Cho, H-I.(2003a), A Case Study on the Verification of the Initial layout of Engine Block Machining line Using Simularion, Journal of the Korea Society for Simulation, 12, 41- 53
  2. Moon, D-H., Kim, H-S., Song, C, and Kim, K-W.(2003b), A Simularion Analysis on the Validiry of Color Rescheduling Storage in an Automobile Painting Shop, IE Interfaces, 16, 211-221
  3. Moon, I-K., Yun, W-Y., Cho, K-K., and Choi, W-J.(2004), Simulation with ARENA, 3rd edition, Kyobo Book Centre
  4. Shin, H-P., Park, S-Y., and Lee, H-K(1992), Material Handling System Improvement Analysis Applying Simulation Technique, IE Interfaces, 5, 35-46
  5. Lim, J-M., Kim, K-S., and Sung, K-S.(1998), Determination of the Optimal Configuration of Operating Polices in an IntegratedAutomated Manufacturing System Using the Taguchi Method and Simulation Experiments, IE lnterfaces, 11, 23-40
  6. Lim, S-J., Kim, K-S., Park, M-W., and Kim, S-K(2002), Mixed Model Assembly Line-Balancing Using Simulation, Journal of the Korea Society for Simulation, 11,69-79
  7. Cho, K-K, Moon, I-K., Yun, W-Y, and Kim, Y-K.(1999), A Simulation Study to Analyze Production and Material Flow of a Microwave Oven Assembly ling, IE Interfaces, 12,121-131