The Development of Methodology in order to consider Combined Heat and Power in the Basic Plan of Long Term Electricity Supply & Demand

전력수급기본계획에 열병합발전 설비 반영 방법론의 개발

  • Published : 2006.12.01

Abstract

This paper develops methodology in order to consider CHP(Combined Heat and Power) capacity in the Basic Plan of Long Term Electricity Supply & Demand. We develop generating cost of CHP considering electric and heat. Also we develop mixed load duration curve which includes the electric load and heat load and then apply CHP capacity to SCM(Screening Curve Method) considering CHP feature. Accordingly, it decide the optimal CHP capacity in the Basic Plan of Long Term Electricity Supply & Demand. Also, We perform the sensitivity analysis according to cost variation.

Keywords

References

  1. '열병합발전기술세미나(환경분야)', 한국열병합발전협회, 2005
  2. 심상렬, '에너지산업 구조개편에 따른 열병합 발전의 경제성 평가', 에너지경제연구원, 2002
  3. '투자사업을 위한 경제성평가', 한국전력공사, 1994
  4. '제 2차 전력수급기본계획', 산업자원부, 2004
  5. '집단에너지사업 운영실적 및 효과분석', 에너지관리공단, 2004
  6. '제 1차 전력수급기본계획', 산업자원부, 2002
  7. 노동석, '전력수급계획의 에너지원별 적정비중 검토', 에너지경제연구원, 2004
  8. 김동우 외, 2000, '에너지원별 냉난방방식에 따른 부하 특성 및 경제성 조사연구' 에너지관리공단, 2004
  9. 김남일, '전력산업에 대한 규제 및 경쟁 정책의 방향', 에너지경제연구원, 2004
  10. 김창수, '전력분야 경쟁도입에 따른 열병하바 발전소 지원정책 고찰', 2003