References
- 김봉진, '단일설비 생산체제에서 부품의 일정 계획에 관한 발견적 기법', 대한산업공학회지, 제20권, 제2호(1994), pp.31-38
- 윤상흠, '공통 및 고유부품으로 구성되는 제품의 부품공급을 위한 단일설비 일정계획', 한국경영과학회지, 제28권, 제4호(2003), pp.105- 114
- Ahmadi, J.H., R.H. Ahmadi, S. Dasu, and C.S. Tang, 'Batching and Scheduling Jobs on Batch and Discrete Processors,' Operations Research, Vol.39(1992), pp.750-763
- Chandru, V., C.Y. Lee, and R. Uzsoy, 'Minimizing Total Completion Time on a Batch Processing Machine with Job Families,' Operations Research Letters, Vol.13(1993a), pp.61-65 https://doi.org/10.1016/0167-6377(93)90030-K
- Chandru, V., C.Y. Lee, and R. Uzsoy, 'Minimizing Total Completion Time on Batch Processing Machines,' International Journal of Production Research, Vol.31 (1993b), pp.2097-2121 https://doi.org/10.1080/00207549308956847
- Chang, Y.C. and C.Y. Lee, 'Machine Scheduling with Job Delivery Coordination,' European Journal of Operational Research, V ol.158(2004), pp.470-487 https://doi.org/10.1016/S0377-2217(03)00364-3
- Chen, Z.L., 'Scheduling and Common Due Date Assignment with Earliness-tardiness Penalities and Batch Delivery Costs,' European Journal of Operational Research, Vol. 93(1996), pp.49-60 https://doi.org/10.1016/0377-2217(95)00133-6
- Cheng, T.C.E., V.S. Gordon, and M.Y. Kovalyov, 'Single Machine Scheduling with Batch Deliveries,' European Journal of Operational Research, Vol.94(1996), pp.277-283 https://doi.org/10.1016/0377-2217(96)00127-0
- Chopra, S. and P. Meindl, Supply Chain Management, Prentice Hall, New Jersey, 2004
- Hall, N.G., M.A. Lesaoana, and C.N. Potts, 'Scheduling with Fixed Delivery Dates,' Operations Research, Vol.49(2001), pp.134-144 https://doi.org/10.1287/opre.49.1.134.11192
- Hall, N.G. and C.N. Potts, 'Supply Chain Scheduling: Batching and Delivery,' Operations Research, Vol.51(2003), pp.566-584 https://doi.org/10.1287/opre.51.4.566.16106
- Hall, N.G. and C.N. Potts, 'The Coordination of Scheduling and Batch Deliveries,' Annals of Operations Research, Vol.135(2005), pp. 41-64 https://doi.org/10.1007/s10479-005-6234-8
- Hochbaum, D.S. and D. Landy, 'Scheduling Semiconductor Bum -in Operations to Minimize Total Flowtime,' Operations Research, Vol.45(1997), pp.874 -885 https://doi.org/10.1287/opre.45.6.874
- Lee, C.Y. and Z.L. Chen, 'Machine Scheduling with Transportation Considerations,' Journal of Scheduling, Vol.4(2001), pp.3-24 https://doi.org/10.1002/1099-1425(200101/02)4:1<3::AID-JOS57>3.0.CO;2-D
- Li, C.L., V. George, and C.Y. Lee, 'Machine Scheduling with Deliveries to Multiple Customer Locations,' European Journal of Operational Research, Vol.164(2005), pp.39-51 https://doi.org/10.1016/j.ejor.2003.11.022
- Pundoor, G. and Z.L. Chen, 'Scheduling a Production-distribution System to Optimize the Tradeoff between Delivery Tardiness and Distribution Cost,' Naval Research Logistics, Vol.52(2005), pp.571-589 https://doi.org/10.1002/nav.20100
- Selvarajah, E. and S. George, 'Batch Scheduling in an Two-level Supply Chain-a Focus on the Supplier,' European Journal of Operational Research, Vol.158(2005), pp. 470-487 https://doi.org/10.1016/S0377-2217(03)00364-3
- Sung, C.S., Y.H. Kim, and S.H. Yoon, 'A Problem Reduction and Decomposition Approach for Scheduling for a Flowshop of Batch Processing Machines,' European Journal of Operational Research, Vol.121 (2000), pp.179-192 https://doi.org/10.1016/S0377-2217(99)00031-4
- Yang, X.,'Scheduling with Generalized Batch Delivery Dates and Earliness Penalties,' IIE Transactions, Vol.32(2000), pp. 735-741