Development and Case Study of 4D CAD System for Visualizing Schedule Data of Construction Project

건설시설물 공정정보 시각화를 위한 4D CAD시스템의 개발 및 적용사례 분석

  • Published : 2007.08.31

Abstract

Recently, various 4D CAD systems for visualizing construction schedule data are being developed. Specially, in case of railway project, the numerical information of progress data should be changed with visualized data by long construction section because the railway project consists of long length in construction site. This study suggests a case study of development of 4D CAD system for visualizing schedule information and the major functions of developed system are verified by railway project. The detailed application procedure of 4D CAD system including input data for a railway project is described in the study. The practical application of 4D CAD system can be improved in railway project by these demonstration researches.

Keywords

References

  1. 건설교통부(2004), 멀티미디어 기술을 연계한 건설관리 정보화용 4D시스템 개발 연구보고서. pp.171-178
  2. 이재철(2004), '4D 시뮬레이션 및 일정별 물량정보검색을 위한 3D 모델 정보 활용.'건설관리, 제5권제4호, 한국건설관리학회
  3. 권오성(2001), '초고층 복합시설물의 4D CAD 모델링 사례연구.' 한국건설관리학회 학술지, 2001
  4. 강인석(2006), '건설공사 4D CAD시스템의 일정 및 진도관리 기능 개발사례'대한건축학회 논문집, 22권8호
  5. 강인석(2006), '토목시설물 공사관리 시각화를 위한 4D 시스템적용방안', 대한토목학회논문집, 26권
  6. DDRSoft Co. http://www.ddrsoft.co.kr. 2007
  7. 엘콘CIC. http://www.elconsystem.com. 2007
  8. Common Point Inc. http://www.commonpointinc.com/. 2006
  9. D-Studio. http://www.domos.be. 2007
  10. J, Gao and M, Fischer (2005) 'Experiences with 3D and 4D CAD on Building construction Projects; Benefits for Project success and Controllable Implementation Factors', International Conference on Information Technology in Construction, CIB W78's 22nd
  11. L.S.Kang (2007), Improvement of Basic Functions for Visualizing Schedule and 3D Objects in 4D CAD System, 2007 CIB Conference Proceeding, South Africa
  12. Yuan.Fu LIAO. (2007) 'Development and Application of 4D Construction Simulation Tools', 2007 Civil Engineering Conference in the Asian Region, Taipei