Closing Step Analysis in Cable-Stayed Bridges to Produce Initial Equilibrium Condition

초기평형상태 구현을 위한 사장교의 폐합단계 해석

  • Received : 2006.12.15
  • Accepted : 2007.02.06
  • Published : 2007.04.27

Abstract

This paper presents a closing method for a cable-stayed bridge erected by the free cantilever method to produce the initial equilibrium configuration at the final construction stage. To realize the initial equilibrium condition in cable-stayed bridge by the cantilever method, compatibility conditions for vertical displacements, rotational angles, and axial displacements at the closing section of both side girders should be satisfied. In this paper, it was shown that it can be accomplished by using some applicable loads during construction such as the pull-up force of the derrick crane, some cable tension forces, and jacking force at the pylon. The proposed method was applied to a construction stage analysis of a sample bridge to demonstrate its validity, and it was acknowledged that the tower was considerably affected by the compatibility condition for axial displacement in the closing step.

본 연구에서는 캔틸레버 공법으로 가설되는 사장교의 최종단계에서 초기평형상태를 구현하기 위한 폐합 방법을 제안하였다. 캔티레버식 가설에 의한 사장교에서 초기평형상태의 구현을 위해서는 거더 폐합단계에서 폐합단면 양측의 연직 처짐, 회전각 및 축방향 변위에 대한 적합조건을 만족시켜야 하는데, 본 연구에서는 실제 시공시 적용 가능한 데릭 크레인의 인양력과 케이블의 장력, 그리고 주탑부에 설치된 유압잭을 이용하여 적절한 폐합이 가능함을 제시하였다. 제안된 방법을 예제 교량의 시공단계 해석에 적용하여 그 타당성을 검증하였으며, 폐합시 축방향 변위에 관한 적합조건의 고려 여부가 주탑의 결과에 큰 영향을 끼치는 것으로 나타났다.

Keywords

References

  1. 김제춘, 장승필 (1999) 초기부재력을 이용한 사장교의 초기형상 및 캠버량 결정, 대한토목학회 논문집, 제19권 제1-3호, pp.377-386
  2. 김제춘, 장승필 (2000) 시공단계를 고려한 사장교의 케이블 긴장 력 결정, 대한토목학회논문집, 제20권, 제3-A호, pp.385 -393
  3. 박용명, 조현준 (2005) 최소자승법을 이용한 사장교의 적정 케이 블 장력 결정, 한국강구조학회논문집, 제17권, 제6호, pp. 727-736
  4. 이민권, 이해성 (2006) 대칭형 강 사장교의 폐합해석과 시공오차 의 예측, 대한토목학회논문집, 제26권, 제1-A호, pp.55-65
  5. 부산광역시 건설본부 (2005), 화명대교 구조계산서
  6. Fleming, J.F. (1979) Nonlinear Static Analysis of Cable- Stayed Bridge Structures, Computers & Structures, Vol.10, No.4, pp.621-635 https://doi.org/10.1016/0045-7949(79)90006-3
  7. Gimsing, N.J. (1997) Cable Supported Bridges, concept and design, second ed., John Wiley
  8. Kim, Ki-Seok, and Lee, Hae-Sung (2001) Analysis of target configurations under dead load for cablesupported bridges, Computer & Structures, Vol.79, No.29, 2001, pp.2681-2692 https://doi.org/10.1016/S0045-7949(01)00120-1
  9. Nazmy, A.S., and Abdel-Ghaffar, M.A. (1990) Three- Dimensional Nonlinear Static Analysis of Cable- Stayed Bridges, Computers & Structures, Vol.34, No.2, pp.257-271 https://doi.org/10.1016/0045-7949(90)90369-D
  10. TDV(2004) RM2004 User Guide
  11. Wang, P.H., Tang, T.Y., and Zheng, H.N. (2003) Analysis of Cable-Stayed Bridges during Construction by Cantilever Methods, Computers & Structures, Vol.82, No.4, pp.329-346 https://doi.org/10.1016/j.compstruc.2003.11.003
  12. Wang, P.H., Tseng, T.C., and Yang, C.G. (1993) Initial Shape of Cable-stayed Bridges, Computers & Structures, Vol.46, No.6, pp.1095-1106 https://doi.org/10.1016/0045-7949(93)90095-U