A Study on the Installation Time and Method of Soundproofing Facilities According to Tunnel Blasting Work

터널발파작업에 따른 방음시설의 설치시기와 방법에 대한 고찰

  • Published : 2007.06.30

Abstract

A blasting noise generated by blasting work, which is a kind of shock-noise, influences the human body. A civil appeal due to blasting noise causes work discontinuance and downsizing of a blasting scale. Most of soundproof facilities for reducing a blasting noise is installed at each working spot by itself and the degree of a noise reduction is very low. The aim of this study is to recommend a technology on noise reduction considering the method and material of soundproof facilities. As the first study step to acquire basic data, investigations on the installation time, installation method, and material of the soundproof facilities have been done at about 20 tunnel work spots such as railroad tunnel, road tunnel, tunnel for electric power.

발파작업에 따라 필연적으로 발생되는 발파소음은 충격성소음으로 인체에 영향을 미친다. 이로 인한 민원 발생은 공사 중지, 발파규모의 축소 등을 유발시킨다. 발파소음저감을 위한 방음시설은 대부분 민원의 정토에 따리 설치시기나 설치방법 등이 각 현장마다 자체적으로 이루어지고 있으나 소음 저감도는 매우 낮은 실정이다. 본 연구의 최종적인 목표는 방음시설의 방법과 재질에 따른 소음저감 기술연구이다. 1단계 기포자료 확보를 위한 연구단계로서 철도, 도로, 전력구 등의 약 20여개의 터널 현장을 대강으로 방음시설의 설치시기와 설치방법, 재질에 대한 조사를 수행하였다.

Keywords

References

  1. 기경철, 김일중, 2002, 산학인을 위한 발파공학, 동화기술, pp. 253, 259
  2. 김재극, 1999, 산업화약과 발파공학, 서울대학교출판부, pp. 395
  3. 원앤비기술사사무소, 2001-2006, 시험발파결과보고서, 원앤비기술사사무소
  4. 양형식, 1995, 발파진동학, 구미서관, pp. 117
  5. 정일록, 1999, 소음.진동학, 신광출판사, pp. 227
  6. 한국고속철도공단, 1997, 경부고속철도 서울 사업소구간 소음.진동 피해진단
  7. 한국토지개발공사, 1993, 암발파 설계기법에 관한 연구, 한국토지개발공사, pp.372
  8. 환경부, 2005, 생활소음.진동 규제법, 제29조
  9. Dowding, C.H., 1996, Construction Vibrations, pp. 220-221, 372
  10. Altas Powder Company, 1987, Explosive and Rock Blasting, Altas Powder Company
  11. Siskind, D.E., V.J. Stachura, M.S. Stagg and J.W. Kopp, 1976, Noise and Vibrations in Residential Structures from Quarry Production Blasting, U.S. Bureau of Mines, RI 8485