The Analysis on the Impact Factors of Delivery Method for Multi-Family Housing Projects

공동주택 건설공사의 발주방식 영향요인 분석

  • Published : 2008.06.30

Abstract

Recently, construction industry demands have been changed by domestic construction circumstances such as high-technology, mega-projects, and the complexity of construction. In order to deal with the change of such a domestic construction circumstances, the Ministry of Construction and Transportation (MOCT) has introduced advanced delivery methods. However, the advantages and disadvantages of the advanced delivery methods have not been effectively applied for previous projects. The reason for this is that the "Reviewing Standard for the Large-scale Construction Bidding Method" has not reflected enough prcject characteristics when the delivery method is selected in the project planning phase. Therefore, this paper proposes the Analysis on the Impact Factors of Delivery Method for Multi-Family Housing Projects.

오늘날 건설수요는 고도화, 프로젝트의 대형화, 공사여건의 복잡화와 같은 외부환경에 의해 변하고 있다. 이에 정부에서는 외부환경의 변화에 적절히 대응하고자 선진화된 발주방식을 도입하였다. 그러나 이러한 의도와는 달리, 기 발주된 프로젝트에서는 발주방식별 장 단점 등이 효과적으로 나타나지 못하고 있다. 이러한 원인은 사업의 기획단계에서 발주방식을 선정할 때 사업의 특성을 충분히 반영하지 못하는 현재의 "대형공사 입찰방법 심의기준"에서 그 원인을 찾을 수 있다. 따라서 본 연구는 프로젝트의 특성에 따른 적절한 발주방식을 적용하기 위하여 공동주택 건설공사의 발주방식에 영향을 주는 영향요인을 분석하고자 한다.

Keywords

References

  1. 김광인 (2000). 국내 대형 공공 건축물공사의 발주방식 선정기준에 관한 연구, 서울시립대학교 석사학위논문
  2. 박성현, 조신섭, 김성수 (2006). Ver. SPSS 12K 한글SPSS, 한나래
  3. 서용칠 (2003). 대형 공공건설사업의 발주방식 선정모델 개발, 서울시립대학교박사학위논문
  4. 서울시립대학교 (2003). 사업발주방식, 한국엔지니어링진흥협회
  5. 서울시립대학교 (2006). 턴키공사방식의 성과평가에 관한 연구, 건설교통부
  6. 이상호 (2006). "건설산업의 최고가치 구현수단으로서의 CM", 제2회 CM서울포럼, 한국건설관리학회
  7. 한국건설산업연구원 (2005). 최근 외국의 입.낙찰제도 운영현황 및 우리나라 입.낙찰제도 개선방안 연구, 재정경제부
  8. 현창택, 김성일, 조규만 (2005). 대형공공공사 입찰방법 선정기준 개발 연구, 국토연구원
  9. AASHTO (American Association of State Highway and Transportation Officials) (2005). Recommended AASHTO Design-Build Procurement Guide, AASHTO, Washington, DC
  10. Alhazmi, T. and McCaffer, R. (2000). "Project Procurement System Selection Model", Journal of Construction Engineering and Management, ASCE, 126(3), pp. 176-184 https://doi.org/10.1061/(ASCE)0733-9364(2000)126:3(176)
  11. Al-Khalil, M. (2002). "Selecting the appropriate project delivery method using AHP", International Journal of Project Management, 20(6), pp.469-474 https://doi.org/10.1016/S0263-7863(01)00032-1
  12. Al-Sinan, F. M. (1986). "Evaluation of construction management contracts in development countries", Ph.D thesis, Purdue University
  13. Chan, A., Yung, E., Lam, P., Tam, C., and Cheung, S. (2001)." Application of Delphi method in selection of procurement system for construction projects", Construction Management and Economics, 19(7), pp.699-718 https://doi.org/10.1080/01446190110066128
  14. Cheung, S., Lam, T., Wan, Y., and Lam, K. (2001). "Improving Objectivity in procurement selection", Journal of Management in Engineering, ASCE, 17(3), pp.132-139 https://doi.org/10.1061/(ASCE)0742-597X(2001)17:3(132)
  15. Flad & Associates (1994). Delivery System Selection Matrix : Purpose and Definition, Flad & Associates
  16. Florida Department of Transportation (FLDOT) (2003)." Design Build Program", Florida Department of Transportation Project management, Research & Development Office, Tallahassee, Florida
  17. Gorden, C. M. (1994). "Choosing Appropriate Construction Contracting Method", Journal of Construction Engineering and Management, ASCE, 120(1), pp. 196-210 https://doi.org/10.1061/(ASCE)0733-9364(1994)120:1(196)
  18. Ireland, V. (1982). Virtually Meaningless Distintions Between Nominally Different Procurement Methods
  19. Love, P., Skitmore, M., and Earl, G. (1998). "Selecting a suitable procurement method for a building project", Construction Management and Economics, pp.221-233
  20. Luu, D., Ng, S., and Chen, S. (2005)." Formulating procurement selection criteria through case-based reasoning approach", Journal of Computing in Civil Engineering, ASCE, 19(3), pp.169-276
  21. Mahdi, I. and Alreshaid, K. (2005). "Decision support system for selecting the proper project delivery method using analytical hierarchy process", International Journal of Project Management, 23(7), pp.564-572 https://doi.org/10.1016/j.ijproman.2005.05.007
  22. Masterman, J. (1992). An Introduction to Building Procurements Systems, E & FN SPON
  23. Nahapiet, H. and Nahapiet, J. (1985)." A comparison of contractual arrangements for building projects", Construction Management and Economics, 3(3), pp. 219-219
  24. Reverio, F. L. (2001). "Project Delivery system selecting : a cased-based reasoning framework", Logistics Information Management, 14(5/6), pp. 367-375 https://doi.org/10.1108/EUM0000000006248
  25. Sanvido, V. E. and Konchar, M. D. (1998). Project Delivery Systems : CM at Risk, Design-Build, Design-Bid-Build, Pennsylvania State University, p. 12
  26. Sanvido, V. and Konchar, M., 1999, Selecting Project Delivery Systems, Project Delivery Institute
  27. States of Geogia (SOG) (2003). "Project Delevery Option - Understanding Your Options", Georgia State Financing and Investment Commission, Atlanta, Geogia
  28. US Army Corps of Engineers (USACE) (1994). Design-Build Insruction(DBI) For Military Construction, US Army Corps of Engineers
  29. Washington State Department of Transportation (WSDOT) (2004). Guidebook for Design-Build Highway Project Development, Washington State Department of Transportation, Seattle, Washington