A Method for Schedule Simulation Considering Rework and Uncertainty

재작업과 불확실성을 고려한 일정 시뮬레이션 방법론

  • 김찬묵 (아주대학교 시스템공학과) ;
  • 박영원 (아주대학교 시스템공학과)
  • Published : 2009.02.28

Abstract

The majority of development projects fail to meet their target schedule and cost, with the overrun typically between 40 and 200 percent. These overruns happen because the planners underestimate the work or do not consider the need to rework at project planning. Representative schedule planning/management techniques such as Gantt Chart, PERT/CPM etc. that are used in domestic project planning are unable to reflect rework. This paper proposes a method to consider rework to provide more realistic estimates at schedule planning. Additionally, to prevent the underestimation of the work this paper proposes a simulation method that calculates a probabilistic estimated schedule and the associated variance based on the random variable modeling of individual task completion dates.

대부분의 개발 프로젝트는 목표 비용과 일정을 $40{\sim}200%$ 초과한다. 이러한 초과 현상은 계획시 업무를 과소 평가하거나 재작업을 고려하지 않음으로써 발생한다. 현재 국내에서 사용되는 대표적인 일정 계획/관리 기법(Gantt Chart, PERT/CPM 등)들은 재작업을 반영할 수 없다. 이 논문은 일정 계획시 보다 현실적인 일정 계획 값을 예측하기 위해서 재작업을 고려하는 방법을 고안하구 또한 과업의 과소평가를 방지하기 위해 수행시간의 불확실성을 확률변수로 나타내어 다루기 위해서 시뮬레이션을 수행하여 최종 완료 날짜의 예상치와 분산도를 계산하는 방법을 제안한다.

Keywords

References

  1. Oliver de Weck(2003), "System & Project Management", MIT lecture material
  2. PMBOK 지침서 2004 개정 프로젝트 팀(2004), "프로젝트 관리 지식체계 지침서" , pp. 147, Project Management Institute
  3. Peter Morris and George Hough(1987), "The anatomy of major projects: A study of the reality of project management", John Wiley and Sons
  4. Edward B. Roberts(1992), "Management of Technology: Global Benchmarking", Massachusetts Institute of Technology, December 10
  5. Yonas Nebiyeloul-Kifle(2005), "Application of the design structure matrix to integrated product develpment process", MIT, pp.13
  6. Tyson R. Browning(2001). "Applying the design structure matrix to system decomposition and integration problems: a review and new directions", IEEE Transactions on Engineering Management, Vol. 48, No. 48, August, pp. 299-304
  7. 도시형 자기부상열차 실용화 사업단(2007). "인터페이스 조정회의"