DOI QR코드

DOI QR Code

Design of Excavator Boom Structure Based on Fatigue Strength of Weldment(I)

용접부 피로강도를 고려한 굴삭기 붐 구조물 설계(I)

  • Received : 2010.02.01
  • Accepted : 2010.07.08
  • Published : 2010.10.31

Abstract

The purpose of this study is to develop improved boom structures with reliable fatigue strength of weldment and lower production cost. For that purpose, multibody dynamic analysis was performed to evaluate forces acting on arm & boom cylinders and joints of boom structure during operation of an excavator for three working postures, then stress analysis was made to investigate stress distribution around diaphragms at the bottom plate of boom structures which was known to be susceptible to fatigue failures of welded joints, and finally boom structure with optimum arrangement of diaphragms was proposed. This work basically consists of the following two parts: part 1 focuses on multibody dynamic analysis of excavators during operation and part 2 includes evaluations of fatigue strength of welded joints for modified boom structures.

Keywords

References

  1. Nikravesh, P. E. : Computer Aided Analysis of Mechanical Systems, Prentice Hall, 1988
  2. Soon Ki Kwon, Hyung Jin Park, Min Suk Suh and Hyung Gun Kim : Development of Simulation System for Front Attachment of Excavator, Journal of KSME, 20-5 (1996), 1401-1410 (in Korean)
  3. Wan-Suk, Oe-Jo Kim, Byung-Hoon Lee, Man-Hyung Lee and Kyeong-Hwa Yoon : Dynamic Analysis of an Excavator Using Experimental Data, Journal of KSME, 18-5 (1994), 1150-1157 (in Korean)
  4. Oe-Jo Kim, W. S. Yoo, K. H. Yoon and H. G. Kang : Evaluation of Joint Reaction Forces for a Hydraulic Excavator Subjected to a Critical Load, Journal of KSME, 20-4 (1996), 1154-1163 (in Korean)
  5. Unpublished Internal Project Report, HMRI-2002-12-S320, 2002 (in Korean)