DOI QR코드

DOI QR Code

A Study on Reclosing Decision on 154kV Combined Transmission Lines

154kV 혼합송전선로 재폐로 결정에 관한 연구

  • Received : 2010.07.29
  • Accepted : 2010.09.27
  • Published : 2010.10.01

Abstract

This paper describes switching surge analysis on reclosing decision in 154kV combined transmission line with power cables. Reclosing should be operated in combined transmission line based on the technical evaluation because of insulation problem of power cable section. If the surge strikes on power cable, the breakdown can occur at week point of cable insulation. Therefore the detailed analysis is required by considering several conditions such as length ratio of power cable, arrester, fault resistance, charging rate and grounding resistance, etc.. In addition, sheath voltage on IJ(Insulated Joint) is analyzed to confirm the protective level. Simulation is performed by EMTP/ATP. Analysis results show that reclosing can be operated without any special problem by the single line-to-ground fault with fault resistance of $1\Omega$ to $50\Omega$ occurred at the overhead transmission section in 154kV combined transmission lines and trap charge of 100% and 110%.

Keywords

References

  1. KEPCO, "지중송전케이블 시스템", 2002. 12.
  2. KEPRI, "지중케이블 설비체계 분석 및 케이블보호대책 수립에 관한 연구(최종보고서)" 2004. 12.
  3. 보호계전기 정정 세부사항(부록 1)
  4. A.I.Ibrahim, H.W.Dommel, "Knowledge Base for Switching Surge Transients" IPST05-050, 2005. 6.
  5. 한국전력공사 기술연구원, "지중송전 케이블의 써어지 보호 대책에 관한 연구(최종보고서)", 1993. 6.
  6. J.B.Kim, W.B.Shim, J.W.Shim, "Swithing Overvoltage Analysis and Air Clearance Design on the KEPCO 765kV Double Circuit Transmission System" IEEE Trans. on PWD, Vol. 15, No. 1, 2001. 1.
  7. Laszlo Prikler, "Lightning Performance and Switching Overvoltage Studies of an Uprated Transmission Line" IPST 2003.
  8. 심응보, "345kV 산청-의령간 송전선로 개폐과전압 검토", KEPRI Report
  9. 일본 동경전력, "계통조작 규칙(2007. 10. 31 개정)"
  10. 일본 중부전력, "이상시 계통운영 지침(2005. 4. 1. 개정)"
  11. 일본전기학회 기술보고서, "케이블계통에서의 서지현상과 대책", 제366권, 1991. 4.
  12. C.K.Jung, J.W.Kang, K.S.Lim and J.B.Lee, "A Calculation of Switching overvoltage on Combined Transmission Systems", 2009 International Symposium on High Voltage Engineering", 2009. 8
  13. 정채균 외 5인, "피뢰기 설치에 따른 154kV 혼합송전선로 스위칭서지 저감효과 분석", 대한전기학회 대전지부 학술대회 논문지, 2008. 10
  14. 임광식 외 4인, "혼합송전계통에서 재폐로 시행시 개폐과전압 해석", 대한전기학회 추계학술대회 논문지, 2008. 11
  15. 임광식 외 3인, "혼합송전계통에서 재폐로 해석을 위한 모델수립 및 개폐과전압 해석", 대한전기학회 하계학술대회 논문지, 2008. 7
  16. 송전 설계기준-1031, "직접접지방식 송변전설비 절연 협조 기준"
  17. KERPI, "송전 설계기준 재개정 및 보완 연구 (최종보고서)", 2001. 8.
  18. KERPRI, "345kV 및 154kV급 Gapless 피뢰기 정격규격 및 기준정립(최종보고서)", 2000. 2.
  19. 변전 설계기준-2511, "교류차단기 선정 기준"
  20. 변전 설계기준-2531, "피뢰기 선정"
  21. KEPRI, "직접접지계통 송전선로 고저항 지락보호대책 연구 (최종보고서)", 1997. 7