This study was conducted to investigate the effect of hydropower factors (watershed, gross head), operation ratio and unit electricity cost on the benefit-cost ratio (B/C ratio) of small hydropower using agricultural reservoirs. The equation of B/C ratio was expressed as a function of watershed area, gross head, operation ratio and unit electricity cost. The benefit increased with watershed area, gross head and unit electricity cost, while the cost increased with watershed area and gross head but decreased with operation ratio. The B/C ratio increased with watershed area, gross head, operation ratio and unit electricity cost. While the effect of gross head on the B/C ratio decreased with watershed area, the effect of operation ratio and unit electricity cost on the B/C ratio increased with watershed area. The operation ratio is an important factor to affect the B/C ratio and therefore we need to develop hydropower for the heightened dams to expect high operation ratio due to continuous water release. The unit electricity cost is also an important factor to affect the B/C ratio and the B/C ratio was always below 1 unless unit electricity cost is over 60 Won/kWh under given conditions. The reservoirs with economic feasibility for small hydropower development were three in 21 when the equation of B/C ratio was appled to the study reservoirs. The results can be used to choose the appropriate reservoir with economic feasibility for development of small hydropower.

Keywords

References

  1. Ahn, T. J., H. H. Lyu, and J. E. Park, 1999. Optimization technique for estimation of potential hydroelectric energy at existing agricultural reservoir. J. of Korea Water Resources Association 32(3): 281-289 (in Korean).
  2. Hosseini, S. M. H., F. Forouzbakhsh, and M. Rahimpoor, 2005. Determination of the optimal installation capacity of small hydro-power plants through the use of technical, economic and reliability indices. Energy Policy 33(15): 1948-1956. https://doi.org/10.1016/j.enpol.2004.03.007
  3. Kadellis, J. K., D. S. Vlachou, and G. Korbakis 2005. Techno-economic evaluation of small hydro power in Greece: A complete sensitivity analysis. Energy Policy 33(15): 1969-1985. https://doi.org/10.1016/j.enpol.2004.03.018
  4. Kim, K. H., C. S. Yi, J. H. Lee, and M. P. Shim, 2007. Framework for optimum scale determination for small hydro power development using economic analysis. J. of Korea Water Resources Association 40(12): 995-1007 (in Korean). https://doi.org/10.3741/JKWRA.2007.40.12.995
  5. Kim, K. H., C. S. Yi, K. D. Yeo, and M. P. Shim, 2009. Priority decision of small hydro power development using spatial multi-criteria decision making. J. of Korea Water Resources Association 42(12): 1029-1038 (in Korean). https://doi.org/10.3741/JKWRA.2009.42.12.1029
  6. Korea Agricultural & Rural Infrastructure Corporation (KARICO), 2001. Hydrological operation model for water resources system (in Korean).
  7. Korea Rural Community & Agricultural Corporation (KRC), 2006. Manual of private project for duty promotion (in Korean).
  8. Korea Rural Community Corporation (KRC), 2010. Comprehensive report of investment project for feasibility analysis (in Korean).
  9. Ministry of Commerce, Industry and Energy (MCIE), 2006. Improvement of feed in tariff for new & renewable energy and connection of RPS system (in Korean).
  10. Moon, Y. K., 2002. Potential presence of small hydro development using agricultural reservoirs. Rural Community & Environment 12(2): 7-13 (in Korean).
  11. Park, W. S., C. H. Lee, and M. P. Shim, 1997. Feasibility assessment for small hydro power sites in korea. Korea Society of Civil Engineers 197-205 (in Korean).
  12. Ueda, T., M. Kobayashi, and M. Fuchigami, 2004. Introduction to Regression Analysis Using Excel. Tokyo: Ohmsha (in Japanese).
  13. Woo, J. Y., and J. S. Kim, 2010. Estimation of annual capacity of small hydro power using agricultural reservoirs. The Korea Society of Agricultural Engineers 52(6): 1-7 (in Korean). https://doi.org/10.5389/KSAE.2010.52.6.001