A Study for Drainage Pipe Construction Method using a Boring Machine

천공장치를 이용한 배수설비 연결관 시공 기술에 관한 연구

  • 장재구 (광운대학교 환경공학과) ;
  • 강선홍 (광운대학교 환경공학과) ;
  • 김동은 (한국환경산업기술원 인증평가본부) ;
  • 정태호 ((주)일성엔지니어링)
  • Published : 2011.12.15

Abstract

Ministry of Environment has been promoting BTL business of the sewer rehabilitation which continues from 2005 up to now. Sewer rehabilitation is classified into three parts : wastewater pipe rehabilitation, rainwater pipe rehabilitation and drainage equipment rehabilitation. Drainage equipment rehabilitation is that drainage pipe connects wastewater pipe directly without water-purifier. In the drainage equipment construction, it is inevitable to have the damage of ground structures(wall, gate and U drain, etc) when an open excavation method is used. Therefore it is necessary to develop non-excavation method to connect drainage pipe and wastewater pipe like jacking method to avoid the damage of ground structure. This paper has conducted an analysis of the non-excavation method using a boring machine attached to backhoe, which is issued the verification certificate of environmental technology according to the Development of and Support for Environmental Technology Act, article.7. The index set in this analysis was sectionalized to the condition of construction, the grade of drainage pipe, the size of excavated hole, the amount of waste cement concrete and asphalt concrete and the benefit effect compared to open excavation method.

Keywords

References

  1. 송호면 외 (2010) 하수관거정비 BTL사업의 효과분석 및 방안 수립 연구, 상하수도학회지, 24(6), pp.743-751.
  2. 장대환 외 (2008) BTL 하수관거 정비공사의 민원유형분석 및 저감 방안에 관한 연구, 대한상하수도학회.한국물환경학회 2008공동 추계학술발표회 논문집, pp.362-363.
  3. 장효주 외 (2010) 개인하수처리시설의 제도개선에 관한 연구, 상하수도학회지, 24(1), pp.33-40.
  4. 조진규 외 (2003) 김포시민의 하수도사업에 대한 인식, 환경관리학회지, 9(2), pp.237-242.
  5. 환경부 (2002) 하수관거정비 종합계획.
  6. 환경부 (2005) 하수도시설기준, pp.198-201, 한국상하수도협회.
  7. 환경부 (2011) 2009 하수도통계 자료집.