Improvement of Procedures on Design Deliberation System for Turnkey and Alternative-Design Contracts

턴키.대안입찰 설계심의 및 평가제도의 개선방안

  • 박홍태 (공주대학교 건설환경공학부 토목환경공학과) ;
  • 이양규 (대림대학 토목환경과)
  • Received : 2010.09.15
  • Accepted : 2010.12.09
  • Published : 2011.02.26

Abstract

Turnkey and alternative-design contracts was introduced operation in the country from january 2004 to February 2010. this was introduced operation. The selecting method of contractor for turnkey projects has being operated by an open forum type that consists of technical committee and appraisal committee in an integrated design approach deliberations. But to improve the operation of the problems, the government is operating design review committee consisting of the central, local and special design advisory committee in march 2010. But this system has also been suggested as still problems, too many contracts by large companies, increasing of design cost and excessive competition. This study is intended to contribute that turnkey and alternative-design contracts can be well operated in domestic construction markets. In this paper suggests some improvement methods and operational problems caused from application of an open forum type for selecting contractor of turnkey project.

2004년 1월부터 2009년 12월까지 국내 턴키 대안입찰의 적격자 선정방식은 통합설계심의방식에서 기술위원회와 평가위원회를 이원화한 공개토론방식을 도입 운영하여 왔으나, 제도 운영상에서 나타난 문제점을 개선하기 위하여 정부는 2010년 현재 설계심의분과위원회를 크게 중앙, 지방, 특별 설계자문위원회의 분과위원으로 구성하여 운영하고 있다. 그러나 평가과정의 객관성 및 적정성 확보, 대형건설업체의 수주편중현상 그리고 과다경쟁 등이 여전히 문제점으로 제시되고 있다. 이에 이 연구는 일괄 대안입찰공사 설계심의 및 평가에 대한 투명성과 공정성을 제고하고 업무담당자의 심의 평가업무를 효율적으로 운영할 수 있도록 하였다. 또한 기존 공개토론방식의 턴키 대안입찰제도가 건설산업에 미치는 영향, 심의 운영제도, 설계심의 개선사항 및 운영상의 문제점을 분석하여 개선 보완하여 제시하였다.

Keywords

References

  1. Adrian, James J. (1981) The Construction Management Process, Reston Publihing Co. Inc.
  2. K.R. Molenaar (1999) Public-Sector Design/Build Evolution and Performance, Journal of Management in Engineering, Vol. 15, No. 2, pp. 54-62. https://doi.org/10.1061/(ASCE)0742-597X(1999)15:2(54)
  3. S.H. Kim (2004) Performance Analysis of Turnkey and Alternative- Design Construction through Survey, Korea Institute of Construction Engineering and Management Regular Conference Journal, pp. 462-467.
  4. Y.K. Lee, L.S. Kang, S.C. Jeon, J.H. Park (2005) Improvement of Turn-key Contract System through the Analysis of Present Ordering Condition in Civil Engineering Projects, Journal of the Korean Society for Railway, Vol. 8, No. 5, pp. 460-469.
  5. Y.K. Lee, L.S. Kang, C.H. Kim (2007) Improvement of Bidding Procedure and Design Review System of Turnkey and Alternative-design Contracts, Journal of the Korea Society of Civil Engineers, pp. 491-497.
  6. S.H. Lee (2004) Correlation relationship of public construction bid rate and Profitability, The Ministry of Land, Transport and Maritime Affairs, pp. 50-57.
  7. The Ministry of Land, Transport and Maritime Affairs(2009.12 revision) Construction technology development and management regarding operating rules.
  8. The Ministry of Land, Transport and Maritime Affairs(2010. revision) Eligible to bid review and evaluation plan designed batch, Technical Safety Officer.
  9. The Ministry of Land, Bid Method Review Criteria of Ministry of Land Notice No. 2009-1237 Large Construction etc.
  10. The Ministry of Land, Transport and Maritime Affairs(2010. revision) Eligible to bid review and evaluation plan designed batch, Technical Safety Officer.
  11. The Ministry of Land, Transport and Maritime Affairs(2010. revision) Business Tips of urnkey and Alternative-Design Contracts. Technical Safety Officer.
  12. Public Procurement Service (1997) Construction Eligible Audit Guideline.
  13. A.L Sinan, Fouad Mansoor (1986) valuation of Construction Management Contracts in Developing Contries, Ph.D Purdue Univ.
  14. cheon Lyeong (2010) Construction Economics, Public Procurement Service.

Cited by

  1. Orders Status Analysis on the Successful Bidder Decision Method of Turnkey Alternative Tendering Construction vol.33, pp.2, 2013, https://doi.org/10.12652/Ksce.2013.33.2.771
  2. Deduction on The Problems and Improve The Way of The Successful Bidder Determination Method for Turnkey · Alternative Bid Construction vol.34, pp.6, 2014, https://doi.org/10.12652/Ksce.2014.34.6.1881
  3. Building information modelling based energy performance assessment system vol.12, pp.3, 2012, https://doi.org/10.1108/14714171211244587