DOI QR코드

DOI QR Code

Switching Surge Analysis and Evaluation in Combined Transmission System with 345kV GIL

345kV급 가공송전선로와 GIL이 연계된 혼합송전계통에서 개폐과전압 해석 및 검토

  • 장화윤 (원광대 대학원 전기공학과) ;
  • 이종범 (원광대 공대 전기정보통신공학부) ;
  • 김용갑 (원광대 공대 전기정보통신공학부) ;
  • 장태인 (한국전력공사 전력연구원)
  • Received : 2011.06.15
  • Accepted : 2011.09.29
  • Published : 2011.10.01

Abstract

This paper describes switching surge analysis for reclosing decision in 345kV combined transmission line with GIL. Reclosing operation should be decided based on the detailed technical analysis in combined transmission line because this line includes power cable section which is week on insulation. Insulation of power cable can be breakdown at the week point in case of reclosing moment. Therefore the detailed analysis has to be carried out by considering several conditions such as charging rate, inserting resistance, arrester, length ratio of power cable section, grounding resistance, etc. Analysis is performed by EMTP/ATP.

Keywords

References

  1. CIGRE Brochure 218, "Gas Insulated Transmission Lines", 2002
  2. 한국전력공사, "가스절연송전선로(GIL) 시스템", 2002. 2
  3. 한국전력공사, "초고압 대용량송전선로(GIL) 실계통적용을 위한 연구", 1차년도 연구진도보고서, 2008
  4. 정시환, 김철수, "GIL에 관한 신기술 동향 및 특징", 2006. 11
  5. 정채균, 박흥석, "가스절연송전선로의 서지특성 분석에 관한 연구", 2009 대한전기학회, 2009. 07
  6. SINTEF "ATPDraw Users' Manual 3.5, 5", 2007
  7. Canadian/American EMTP user group, "ATP Rule book", 1998
  8. 한국전력공사. "345kV 및 154kV급 Gapless피뢰기 정격 규격 및 기준 정립", 2002. 2
  9. Chae-Kyun Jung, "Effects of Reclosing for Insulation Coordination in 345kV combined Transmission Lines", KIEE, 2010. 3
  10. 한국전력공사, "변전 설계기준-2511, 교류차단기 선정 기준"
  11. 한국전력공사, "송전 설계기준-1031, 직접 접지 방식 송변전 설비 절연협조 기준"