DOI QR코드

DOI QR Code

154kV Main TR. Bay IED Based On IEC 61850

IEC 61850 기반의 154kV M.Tr Bay IED 적용 사례

  • Received : 2011.09.19
  • Accepted : 2011.10.19
  • Published : 2011.11.01

Abstract

Substation Automation System (SAS) based on IEC 61850 is becoming more and more reality in applying power systems. As well, the development of various engineering tools and the convergence with diagnostic systems are underway. To reflect recent advancements in SAS technology, the Korea Electric Power Corporation initiated a 154kV SAS pilot project and a smart power grid business in 2010. In this paper, the authors will summarize the overview and the lessons learned in applying the IEC 61850-based 154kV Main transformer bay IED solutions to these two project.

Keywords

References

  1. 고윤석, "변전소 자동화를 위한 지능형 솔루션 개발에 대한 연구", 2005년도 대한전기학회 하계학술대회 논문집, 2005.7
  2. 김해누리, 김명회, 김일동, 장병태, 정길조, "IEC61850을 적용한 변전소 IED반 기술규격에 관한 연구", 2006년도 대한전기학회 하계학술대회 논문집, 2006.7
  3. 한전 일반규격 GS-158-465-6, "154kV 변압기 보호배 전반", 2008.12
  4. 한전 일반규격 GS-5945-1001, "IEC6180기반 SA용 154kV M.Tr IED", 2009.11
  5. 한정열, 김용학, 안용호, 장병태, 이남호, 심응보, "SA시스템 현장 적용을 위한 정보정의 표준화", 2010년도 대한전기학회 하계학술대회 논문집, 2010.7
  6. M. PETRINI, C. SABELLI, E. CASALE, "New requirements for substation automation systems", B5-113, 2010 CIGRE Session, Paris, France, 2010. 8
  7. J. CASTELLANOS, I. OJANGUREN, I. GARCES, R. HUNT, J. CARDENAS, J. CARDENAS, M. ZAMALLOA, J. GARCIA, A. GALLASTEGUI, M. YUBERO, E. OTAOLA, "IEC 61850 9-2 Process Bus: Application in a real multivendor substation", B5-116, 2010 CIGRE Session, Paris, France, 2010. 8