Orders Status Analysis on the Successful Bidder Decision Method of Turnkey Alternative Tendering Construction

턴키·대안입찰공사 낙찰자 결정방식에 의한 수주현황 분석

  • 박홍태 (공주대학교 건설환경공학부) ;
  • 이양규 (대림대학교 토목환경공학과)
  • Received : 2012.08.30
  • Accepted : 2012.12.17
  • Published : 2013.03.30

Abstract

Inspection system which was performed in the past selected the final winning bidder by separating Pre-Qualification, the basic design evaluation and price evaluation. However, turnkey and alternative bidding construction has selected way to determine the successful bidder as the best design and the most low cost method, comprehensive evaluation method (bid price adjustment, design score adjustments, weights standard), the best design and the fixed amount method from january 1, 2010 to the present. Due to these institutional problems, orders institutions were often a way to determine the successful bidder to apply differently for identical or similar construction. Therefore this study winning bidder selection criteria through analysis of construction the number and construction order performance, order performance by work division and institutional orders, the weights bidder order performance and orders status of turnkey alternative tendering construction to civil part performed in domestic.

과거에 시행한 심사제도는 입찰참가자격사전심사 및 기본설계평가와 가격평가로 구분하여 최종 낙찰자를 선정하였으나, 2010년 1월 1일부터 현재까지 턴키 대안입찰공사는 설계 적합 최적가 방식, 종합 평가 방식(입찰가격조정, 설계점수조정, 가중치기준), 확정금액 최상 설계 방식의 낙찰자 결정방식을 선택하고 있다. 이러한 제도적인 문제로 발주기관은 동일 유사한 공사에 대해 서로 다른 낙찰자 결정방식을 적용하고 있는 사례가 종종 있어 왔다. 그러므로 이 연구는 국내에서 시행된 토목부분 턴키 대안입찰공사 발주현황, 건수 및 수주실적, 공종별 발주기관별 수주실적, 세부방식 가중치 낙찰자 수주실적 등의 분석을 통해 국내 턴키 대안입찰공사 실정에 적합한 낙찰자 선정기준을 제시하였다.

Keywords

References

  1. Construction & Economy Research Institute (2011), turnkey alternative bid accept ratio. Resources (in Korean).
  2. Ministry of Land, Transport and Maritime Affairs (2009(a)), business tips on turnkey alternative bid Institution (in Korean).
  3. Technology Security Administration, the construction environment (in Korean).
  4. Ministry of Land, Transport and Maritime Affairs (2009(b)), criteria of large-bidding method deliberation. Technology Security Administration, the construction environment (in Korean).
  5. Ministry of Land, Transport and Maritime Affairs (2009(c)), Batch bid designed eligible deliberation and evaluation plan, echnology Security Administration, the construction environment (in Korean).
  6. Lee, S.-H. (2004), the correlation of the government construction pass rate and profitability, Construction and Transportation, pp. 50-57 (in Korean).
  7. Lee S.-H. (2005), turnkey alternative Tendering Market Trends, Construction Industry Institute (in Korean).
  8. Lee, Y.-K., Kang, L.-S., Park, J.-H., Jeon, S.-C. (2005), Improvement of Turn-key Contract System through the Analysis of Present Ordering Condition in Civil Engineering Projects, Journal of the Korean Society for Railway, No. 8, pp. 460-469 (in Korean).
  9. Lee, Y.-K., Kang, L.-S. (2007), Improvement of Bidding Procedure and Design Review System of Turnkey and Alternative-design Contracts. Journal of the Korean Society of Civil Engineers, No. 2, pp. 491-497 (in Korean).
  10. Lee, Y.-K., Park, H.-T. (2011), Improvement of Procedures on Design Deliberation System for Turnkey and Alternative-Design Contracts. Journal of the Korean Society for Railway, No. 14, pp.31-38 (in Korean). https://doi.org/10.7782/JKSR.2011.14.1.31
  11. Lee, Y.-S. (2011), Turnkey bid adequacy, Korean Construction News (in Korean).
  12. Jang, H.-S. etc (2012), A Study on Strategies for Enhancing Transparency of Domestic Construction Industry through Foreign Cases. Journal of the Korean Society of Civil Engineers, No. 3, pp. 235-237 (in Korean).
  13. Adrian, James J. (1981), The Construction Management Process. Reston Publihing Co. Inc.
  14. AL Sinan, Fouad Mansoor (1986), valuation of Construction Management Contracts in Developing Contries. Ph.D Thesis, Purdue Univ.
  15. Molenaar, K. R. .(1999) Public-Sector Design/Build Evolution and Performance. Journal of Management in Engineering, Vol. 15, No. 2, pp. 54-62.

Cited by

  1. Deduction on The Problems and Improve The Way of The Successful Bidder Determination Method for Turnkey · Alternative Bid Construction vol.34, pp.6, 2014, https://doi.org/10.12652/Ksce.2014.34.6.1881