DOI QR코드

DOI QR Code

The research of Economical Re-oder point Estimating Method for building construction on the Downtown Area

도심지 건설공사 건설 자재의 효율적 재주문시점 산정 방안에 관한 연구

  • Received : 2012.12.17
  • Accepted : 2013.02.24
  • Published : 2013.02.28

Abstract

Recently buildings are being constructed on the downtown area. In most building construction sites on the downtown area, the need for adequate material inventories are critical in order to avoid project delays and cost increases due to inappropriate deliveries of key materials. However immoderate material inventories cause increasing inventory cost. Therefore, we need a proper management material inventories. This research re-establishes the existing safety stock and analyzes relationship between safety stock and service level. It suggests an economical re-order point based on safety stock considering service level, various demand and delivery time.

Keywords

References

  1. Im, KS, Han SH, Jung DY, Ryu CK, Choi SK, Inventory Management in Construction Operations Involving on-site Fabrication of Faw Materials, Journal of Korea Institute of Construction Engineering and Management, 2008:9(1):187-198
  2. Jung DY, Park SH, Han SH, Determining the Reliable Inventory Level Using Probabilistic Inventory Model, 2005 Korean Society of Civil Engineers(KSCE) Annual Convention, 2005:4857-4862
  3. Kang HG, Ha YS, Im CW, Kim CD, Yu JH, Efficiency Analysis for RFID-based Curtain Wall of Unit Type Construction, Journal of Korea Institute of Construction Engineering and Management, 2008:9(3):206-213
  4. Lee JM, Kim CD, Yu, JH, Determination Method of Order Quantity based Dynamic Materials Information , Architectural Institute of Korea, 2009:25(12):145-153
  5. Alessandro P, Daria B, Riccardo M, Arrigo P, Optical safety stock levels of subassemblies and manufacturing components, International journal of production economics, 2007:147-159
  6. 김길선, 김재환, 김희탁, 서창적, 어윤양, 유시정, 유한주, 황복주, 디지털 시대의 생산시스템과 SCM, 법문사 , 2004