DOI QR코드

DOI QR Code

Three Dimensional Model for Dynamic Moving Load Analysis of a PSC-I Girder Railway Bridge

PSC-I 거더 철도교량의 3차원 동적 이동하중 해석 모델

  • Cho, Jeong-Rae (Structural Engineering Research Division, Korea Institute of Construction Technology) ;
  • Kim, Dong-Seok (Technology Research Institute, Interconstech Co., Ltd.) ;
  • Kim, Young Jin (Structural Engineering Research Division, Korea Institute of Construction Technology) ;
  • Kwark, Jong-Won (Structural Engineering Research Division, Korea Institute of Construction Technology) ;
  • Jang, Seung Yup (High-Speed Railroad System Research Center, Korea Railroad Research Institute)
  • Received : 2012.11.05
  • Accepted : 2013.06.24
  • Published : 2013.08.31

Abstract

In this paper we evaluated dynamic stability, considering the effects of modeling and analysis methods on moving load analysis, for which a sophisticated 3 dimensional model of a PSC-I type girder bridge was used. For this purpose, we suggested a reasonable modeling method and the physical properties of the concrete and ballasted track system involved. We also analyzed the response characteristics according to: 1) the type of track system; 2) whether or not the track was modeled; 3) whether or not the distance between the girder center and the bearing were considered; 4) the analysis method (i.e., direct integral and modal analysis); 5) whether or not the frequency was filtered.

본 연구에서는 PSC-I 거더 교량을 대상으로, 3차원 교량 모델로 이동하중해석에 의한 엄밀한 동적 안정성 해석을 수행할 때의 모델링 방법과 해석방법에 대한 영향 평가를 수행하였다. 이를 위해 콘크리트 및 자갈궤도 등을 채용할 때의 합리적인 모델링 방법론과 물성치를 제시하였다. 또한, 궤도 모델링 유무, 궤도 종류, 거더 중심에서 받침까지의 거리 고려 여부, 직접적분법과 모달해석법 등 이동하중해석법, 필터링 등이 응답에 미치는 영향을 분석하였다.

Keywords

References

  1. J.-R. Cho, Y.J. Kim, J.S. Park, J.H. Kim (2012) A study on dynamic stability of railway bridges using IPC girder, Korea Institute of Construction Technology, KICT 2012-013.
  2. J.-R. Cho (2009) Object-oriented finite element framework using hybrid programming, Ph.D Thesis, Seoul National University.
  3. B.-S. Kim, J.-W. Kwark, S.-Y. Park, C.-B. Joh, et al. (2008) System integration for hybrid cable stayed bridge, Korea Institute of Construction Technology, KICT 2008-106.
  4. Y.J. Kim, B.-S. Kim, C.-B. Joh, J.-R. Cho, et al. (2009) System integration for hybrid cable stayed bridge, Korea Institute of Construction Technology, KICT 2009-102.
  5. Y.J. Kim, B.-S. Kim, J.-R. Cho, W.J. Chin, et al. (2010) Development of Design and Construction System Technology for Hybrid Cable Stayed Bridge, Korea Institute of Construction Technology, KICT 2010-088.
  6. Y.J. Kim, B.-S. Kim, J.S. Park, J.-R. Cho, et al. (2011) Development of design and construction system technology for hybrid cable stayed bridge, Korea Institute of Construction Technology, KICT 2011-076.
  7. Y.J. Kim, B.-S. Kim, Y.H. Park, J.S. Park, et al. (2012) Development of design and construction system technology for hybrid cable stayed bridge, Korea Institute of Construction Technology, KICT 2012-075.
  8. J.-R. Cho, K. Cho, J.-W. Kwark, Y.J. Kim (2012) Dynamic characteristics of simply supported single span bridges for KTX and HEMU using design diagram, Journal of The Korean Society for Railway, 15(5), pp. 498-507. https://doi.org/10.7782/JKSR.2012.15.5.498
  9. J.-R. Cho, Y.J. Kim, J.S. Park, Y.-H. Park (2012) Application of ARPACK eigensolver to large-scale finite element model, Proceedings of Korea Concrete Institute Conference, Fall, Mooju, 24(2), pp.573-574.
  10. J.-R. Cho, Y.J. Kim, Y. Yang, J. Koo (2011) Dynamic analysis of new-type V-girder bridge, Proceedings of The Korean Society for Railway Conference, Fall, Jeju, pp. 1536-1541.
  11. H. Yoon, W-J. Chin, J-R. Cho, C.-G. Hwang, J.-W. Kwark (2012) A comparative study on acceleration from measurement and dynamic analysis of high speed railway bridge, Proceedings of the Korean Society for Noise and Vibration Engineering Conference, Fall, Wonju, pp.175-176.
  12. J.-W. Kwark, H. Yoon, W.-J. Chin, J.-R. Cho, C.-G. Hwang (2012), A study on acceleration on high speed railway bridges considering load distribution effect, Proceedings of the Korean Society for Noise and Vibration Engineering Conference, Fall, Wonju, pp.177-178.
  13. W.M. Zhai, K.Y. Wang, J.H. Lin (2004) Modelling and experiment of railway ballast vibrations, Journal of Sound and Vibration, 270, pp. 673-683. https://doi.org/10.1016/S0022-460X(03)00186-X
  14. Korea Railway Network Authority (2002) Specifi-cations for Performance Test of Rail Fastening.
  15. UIC (2001) UIC CODE 774-3, Track-bridge interaction - Recommendations for calculations, 2nd edition.
  16. S.Y. Jang, S.C. Yang (2012) Assessment of train running safety, ride comport and track serviceability at transition between floating slab track and conventional concrete track, Journal of the Korean Society for Railway, 15(1), pp. 48-61 (in Korean). https://doi.org/10.7782/JKSR.2012.15.1.048
  17. S.B. Seo (2002) Railway Track Engineering, Revised edition, Eul & Al, Seoul, pp. 126-127.
  18. H.S. Yoo, S.K. Hwang, D.H. Kim, et al. (2011) Design Criteria for Railroad : Road Bed, Korea Railway Network Authority, 11-B551219-000018-14.
  19. UIC (2009) UIC CODE 776-2, Design requirements for railbridges on interaction phenomena between train-track and bridge, 2nd edition.

Cited by

  1. Analysis of Vibration Transfer Characteristics of Approach Bridges for an Elevated Railroad Station vol.16, pp.4, 2015, https://doi.org/10.5762/KAIS.2015.16.4.2911
  2. Development of Vibration Mitigation Method for a Railway Station Using a Tuned-Mass-Dampered Platform vol.16, pp.2, 2016, https://doi.org/10.9798/KOSHAM.2016.16.2.77
  3. Vibration Analysis of an Elevated Railroad Station Considering Station-Bridge Connection Characteristics vol.10, pp.2, 2014, https://doi.org/10.15683/kosd.2014.10.2.274
  4. Optimum Design Property Estimation of the Precast Floating Track System for Vibration Reduction vol.16, pp.2, 2016, https://doi.org/10.9798/KOSHAM.2016.16.2.69
  5. RC Arch Deck Development and Performance Evaluation for Enhanced Deck Width vol.12, pp.1, 2018, https://doi.org/10.1186/s40069-018-0295-y