References
- Burkard, R.E. Dell'Amico, M. & Martello, S., 2009. Assignment Problems. SIAM, Philadelphia (PA.).
- Buss, A.H., 1996. Modeling with event graphs. In Proceedings of the 28th conference on Winter simulationIEEE Computer Society: Coronado, California, United States, 8-11 December 1996, pp.153-160.
- Buss, A.H., 2002. Component based simulation modeling with simkit. Proceedings of the Winter Simulation Conference, San Diego, California, United States, 8-11 December 2002, pp.243-249.
- Kamrani, F. Ayani, R. Moradi, F. & Holm, G., 2009. Estimating performance of a business process model. In Proceedings of the 2009 Winter Simulation Conference (WSC)IEEE, Austin, Texas, United States, 13-16 December 2009, pp.2977-2988.
- Koenig, D. Glover, A. King, P. & Laforge, G., 2007. Groovy in Action. Manning Publications.
- Kuhn, H.W., 1955. The Hungarian Method for The Assignment Problem. Naval Research Logistics Quarterly, 2(1-2), pp.83-97. https://doi.org/10.1002/nav.3800020109
- Schruben, L., 1983. Simulation Modeling with Event Graphs. Communication of the ACM, 26(11), pp. 957-963. https://doi.org/10.1145/182.358460
- Shen, M. Tzeng, G.H. & Liu, D.R., 2003. Multi-criteria task assignment in workflow management systems. Proceedings of the 36th Annual Hawaii International Conference on System Sciences, Hawaii, United States, 6-9 January 2003, pp.202-210.
- Son, M.J. et al., 2010. Modeling and Simulation of Target Motion Analysis for a Submarine Using a Script-based Tactics Manager. Advances in Engineering Software, 41(3), pp.506-516. https://doi.org/10.1016/j.advengsoft.2009.10.009
- Son, M.J., 2013. Decision support system for job assignment in shipbuilding design using Discreteevent- based business process simulation. Ph.D. Seoul National University.
- Son, M.J. Kang, H.W. & Kim, T.W., 2013. Scheme-based modeling for the reuse of the block model in AVEVA marine. Proceedings of the Society of CAD/CAM Engineers Conference, Pyeongchang, Korea, 30 January-1 February 2013, pp.450-456.
- Son, M.J. & Kim, T.W., 2012a. BPM-based job assignment in the ship hull production design. Proceedings of the Society of CAD/CAM Engineers Conference, Pyeongchang, Korea, 1-3 February 2012, pp.49-56.
- Son, M.J. & Kim, T.W., 2012b. Optimal job assignment for design manager in ship hull production design using BPM. Proceedings of the Korean Institute of Industrial Engineers Conference, Gyeongju, Korea, 10-11 May 2012, pp.846-853.
- Zeigler, B.P. Praehofer, H. & Kim, T.G., 2000. Theory of Modeling and Simulation. 2nd Ed. Academic Press.
Cited by
- AVEVA Marine Scheme-based Modeling for Reuse of Ship Hull Block Model vol.19, pp.1, 2014, https://doi.org/10.7315/CADCAM.2014.041
- Scheduling and Cost Estimation Simulation for Transportation and Installation of the Offshore Monopile Wind Turbines vol.20, pp.2, 2015, https://doi.org/10.7315/CADCAM.2015.193
- Production Process Analysis based on Information Strategy Planning with Present Condition Diagnosis of Small FRP Shipyards vol.53, pp.5, 2016, https://doi.org/10.3744/SNAK.2016.53.5.353
- Research Trends of Scheduling Techniques for Domestic Major Industries vol.41, pp.1, 2018, https://doi.org/10.11627/jkise.2018.41.1.059