초록

All infrastructure projects are said to be inter-dependent, uncertain and labour-intensive in nature. There is no exception for building services sub sector. For a real time project such as 'The construction, extension and refurbishment of Employees' State Insurance Corporation (ESIC) Hospital at Tirupathy, India with total area of 45,000 square feet at an estimated cost of 1100 million rupees, a generic process model is developed to simulate the effect of set of identified variables on construction project. The 'Stocks and Flows' of dynamic model affords relevant insights to project managers, who apply this knowledge when designing better performance through more appropriate project planning. It is concluded from the model-based approach that building services works can be improved through specific better focussed managerial efforts, such as an increasing coordination effectiveness at the planning stage, clarifying prerequisite conditions prior to installations. Otherwise, pending works arising from work clashes can lead to knock-on effects resulting in productivity constraints and pressures, as well as more rework and demolition. Current study reveals that the model enables deep insight into various interdependent processes, their by improving construction performance levels, by addressing the dynamics of design errors and defective works, and recovering delayed schedule.

키워드

참고문헌

  1. S. Han, P. Love, F. Pena-Mora, "A system dynamics model for assessing the impacts of design errors in construction projects", Mathematical and Computer Modelling, vol. 57, no. 9-10, pp. 2044-2053, 2013. https://doi.org/10.1016/j.mcm.2011.06.039
  2. M.-J. Kwoun, S.-H. Lee, J.-H. Kim, J.-J. Kim, "Dynamic cycles of unsold new housing stocks, investment in housing, and housing supply-demand", Mathematical and Computer Modelling, no. 9-10, vol. 57, pp. 2094-2105, 2013. https://doi.org/10.1016/j.mcm.2011.08.005
  3. M. Park, Y. Kim, H. Lee, S. Han, S. Hwang, M.J. Choi, "Modelling the dynamics of urban development project: Focusing on self-sufficient city development", Mathematical and Computer Modelling, vol. 57, no. 9-10, pp. 2082-2093, 2013. https://doi.org/10.1016/j.mcm.2011.05.058
  4. N.R. Gilkinson, B.C. Dangerfield, "Some results from a system dynamics model of construction sector competitiveness", Mathematical and Computer Modelling, vol. 57, no. 9-10, pp. 2031-2043, 2013.
  5. S.K.M. Wan, M. Kumaraswamy, D.T.C. Liu, "Dynamic modelling of building services projects: A simulation model for real-life projects in the Hong Kong construction industry", Mathematical and Computer Modelling, vol. 57, no. 9-10, pp. 2054-2066, 2013. https://doi.org/10.1016/j.mcm.2011.06.070
  6. S.K.M. Wan, M. Kumaraswamy, "Adapting dynamic coordination buffers for reducing critical production wastes in the Hong Kong building services subsector", Construction Information Quarterly, vol. 11, no. 1, pp. 18-23, 2009.
  7. J.L. Hao, M.J. Hill, L.Y. Shen, "Managing construction waste on-site through system dynamics modelling: the case of Hong Kong", Engineering Construction and Architectural Management, vol. 15, no. 2, pp. 103-113, 2008. https://doi.org/10.1108/09699980810852646
  8. G. Hawkins, "Site productivity 2002: a guide to the uptake of improvements", Technical Note TN 13/2002, BSRIA, Bracknell, Berkshire, 2002.
  9. K. Lynesis, K. Cooper, S. Els, "Strategic management of complex projects: a case study using system dynamics", System Dynamics Review, vol. 17, no. 3, pp. 237-260, 2001. https://doi.org/10.1002/sdr.213
  10. J. Sterman, F. Kofman, N.P. Repenning, "Unanticipated side effects of successful quality programme: exploring a paradox of organizational improvement", Management Science, vol. 43, no. 4, pp. 503-521, 1997. https://doi.org/10.1287/mnsc.43.4.503
  11. A. Rodrigues, J. Bowers, "The role of system dynamics in project management", International Journal of Project Management, vol. 14, no. 2, pp. 213-220, 1996. https://doi.org/10.1016/0263-7863(95)00075-5
  12. J. Sterman., "System dynamics modelling for project management, in: Sloan School of Management", Massachusetts Institute of Technology, Cambridge, MA, 1992.