Comparison of Cost Performance for Delivery Methods on Public Construction Projects

공공 건설공사 발주방식에 따른 비용성과 비교연구

  • Received : 2013.10.04
  • Accepted : 2013.10.08
  • Published : 2013.11.30

Abstract

In the delivery systems for public construction works, design-build methods such as turn-key and alternative have contributed to improving the quality of structures and developing the construction technology. However, it is pointed out that construction based on a design-build method is likely to waste a budget due to its higher contract price than construction based on a design-bid-build method. Other issues such as contract monopoly, bid rigging and deliberation irregularity in design-build. Since there are not much works have been accomplished to comparatively analyze the actual performance and effect based on delivery methods, discussing and judging the performance and effect of each deliver method with limited information could lead to an error. Thus, this study by extensively investigates the actual project cost data, ranging from contract price to the construction cost of the public construction works and comparatively analyzed the characteristics of each delivery method about cost structure and fluctuation trend. This work is expected to assist stake-holders in properly understanding delivery systems for public construction works and promoting their efficient management.

공공건설공사 발주제도 운영에 있어 기술경쟁을 지향하는 턴키 및 대안방식 등 설계 시공일괄방식의 경우, 시설물의 품질향상 및 건설기술 발전에 기여하였음에도 불구, 계약되는 공사비가 설계 시공 분리발주방식을 적용하는 공사보다 높아 예산낭비 우려가 있다는 지적과 함께 수주독점, 입찰담합, 심의비리 등의 문제가 쟁점이 되고 있다. 그러나 실제 발주방식별 사업성과와 효과에 대해 정밀 비교분석한 사례가 없는 실정이며, 단순히 낙찰률 등 사업의 한정된 일반적 정보만으로 사업효과를 논의하고 판단하는 것은 자칫 오류를 범할 우려가 있다. 이에 공공 건설공사를 대상으로 계약에서 준공에 이르기까지 실제 집행한 공사비 자료를 광범위하게 조사하여 비용의 투입구조 및 변동추세 등 발주방식별 특성을 비교분석하고 공공건설공사 발주제도의 올바른 이해와 효율적 운영을 도모하고자 한다.

Keywords

References

  1. ADOT (2011). A+B bidding guide, Arizona Department of Transportation.
  2. Carmichael, D. G. (2000). Contracts and international project management, A. A. BALKEMA, Univ. of New South Wales, Sydney, Australia, pp. 7-11.
  3. CII. (2002). Measuring the impacts of the delivery system on project performance: Design-build and design-bid-build, NIST, U.S., Austin, TX.
  4. El Wardani, M. A., Messner, J. I. and Horman, M. J. (2006). "Comparing procurement methods for design build projects." J. Construc, Eng. Manage, Vol. 132, No. 3, pp. 230-238. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:3(230)
  5. James David Fernane. (2011). Comparison of design-build and design-bid-build performance of public university projects, Univ. of Nevada, Las Vegas, Nevada.
  6. Koo, B. S. and Jang, H. S. (2009). "Evaluation on the impact of lowest bid contracts on site operations in times of sever economic downturn." Korean Journal of Construction Engineering and Managemen, KICEM, Vol. 10, No. 6, pp. 146-153.
  7. Lee, B. N. and Lee, J. S. (2009). "Advanced ordering system construction plan." Korean Journal of Construction Engineering and Managemen, KICEM, Vol. 10, No. 2, pp. 27-30.
  8. Lee, Y. S. (2005). "Turnkey system, alternatives, outcomes and tasks." Jounal of the Korean Society of civil Engineers, KSCE, Vol. 53, No. 10, pp. 77-91.
  9. Lee, Y. S. (2012). Construction delivery method enabled by effective analysis and research skills offered bids, KICT, MLTM (in Korean).
  10. Lee, Y. S., etc. (2012). Development of construction project management technology based on BIM/GIS platform, KICT (in Korean).
  11. Lee, Y. S. and Hwang, B. G. (2007). "Impacts of contract on construction project performance-cost reimbursable and lump sum." Korean Journal of Construction Engineering and Managemen, KICEM, Vol. 8, No. 2, pp. 155-163 (in Korean).
  12. SAIC. (2006). Performance contracting framework fostered by highways for LIFE, U.S Department of Transportation, Federal Highway Administration.
  13. Seoul Metropolitan Government. (2000). Bidding for construction of large-scale impact of the research methods, Construction Engineering and Management (in Korean).
  14. William Quatman, G. (2007). Use of bridging consultants in designbuild, American Bar Association, Forum on the Construction Industry.
  15. Yoo, J. H. and Choi, J. H. (2006). "The river water in emergency repair work utilizing KPI evaluation CM approach." Korean Journal of Construction Engineering and Managemen, KICEM, Vol. 5, No. 3, pp. 18-22 (in Korean).

Cited by

  1. Cost Performance Comparison of Project Delivery Methods in Public Sector - Focusing on Mediator Effect of Biddropping on Change Orders - vol.16, pp.5, 2015, https://doi.org/10.6106/KJCEM.2015.16.5.086