DOI QR코드

DOI QR Code

Quality Verification of Legacy Data of Manufacturing Information System to Improve Results of Shipyard Manufacturing Logistics Simulation

조선소 생산물류 시뮬레이션 결과 정도 향상을 위한 생산정보시스템 기간 정보 검증

  • Lee, Jonghak (Division of Naval Architecture and Ocean Systems Engineering, Korea Maritime and Ocean University) ;
  • Lee, Philippe (PLM Research Lab., Xinnos Co. Ltd.) ;
  • Yoon, Kyungwon (Division of Naval Architecture and Ocean Systems Engineering, Korea Maritime and Ocean University) ;
  • Nam, Jong-Ho (Division of Naval Architecture and Ocean Systems Engineering, Korea Maritime and Ocean University)
  • 이종학 (한국해양대학교 조선해양시스템공학부) ;
  • 이필립 ((주)지노스 PLM 연구소) ;
  • 윤경원 (한국해양대학교 조선해양시스템공학부) ;
  • 남종호 (한국해양대학교 조선해양시스템공학부)
  • Received : 2014.04.15
  • Accepted : 2014.10.20
  • Published : 2014.12.20

Abstract

Unlike other mass production in small variety, shipbuilding process is a project-based method in single variety, which causes unpredictable volatility in the planning system. In shipyards, series of manufacturing processes from fabrication to erection is sequentially carried out. In order to predict unfavorable changes such as overload or low load of working volume, computerized simulation has been being gradually adopted. The data used in the simulation are processed from the database of the main scheduling and planning system. Thus the quality of those data is very crucial for the meaningful results. Unfortunately, research on the verification of data quality is very rare and hardly known to the authors. In this work, using the database of scheduling and product information system of a large domestic shipyard, the data required for the simulation are qualitatively analyzed and verified.

Keywords

References

  1. Bhushan, N. & Rai, K., 2004. Strategic Decision Making: Applying the Analytic Hierarchy Process. Springer-Verlag: London.
  2. Gye, C.S. Myung, J.H. Park, J.S. Park, T.H. Lee, Y.S. Lee, S.H. Jang, S.E. Choi, M.Y. Park, M.S. Kim, S.Y. Shin, S.S. Kim, I.C. Lee, B.J. & Bae, Y.J., 2006. The Guideline for Data Quality Management(Ver2.1). Korea Database Promotion Center: Seoul.
  3. Kim, G.S. Hwang, H.J. & Lee, J.H., 2012. Discrete Event Simulation for the Initial Capacity Estimation of Shipyard based on the Master Production Schedule. Transactions of the Society of CAD/CAM Engineers, 17(2), pp.211-122. https://doi.org/10.7315/CADCAM.2012.111
  4. Korea Database Agency, 2009. Data Quality Assessment Procedure Manual. Korea Database Agency: Seoul.
  5. Lee, D.W. Park, T.S. Park, S.K. Park, S.C. & Wang, J.N., 2011. Build an integrated database system for efficient assembly scheduling in ship-building. Proceeding of the Korean Institute of Industrial Engineers Annual Spring Conference, 23, pp.684-689.
  6. Lee, J.M. Jo, S.W. Choi, Y.R. & Shin, J.G., 2006a. A development of planning evaluation framework for large scale shipyard. Proceeding of the Korean Institute of Industrial Engineers Annual Autumn Conference, 17, pp.44-51.
  7. Lee, S.W. Lee, K.K. Woo, J.H. Choi, Y.R. Lee, S.H. & Shin, J.G., 2006b. A Simulation approach for improvement of racing boat manufacturing processes. Proceeding of the Korean Institute of Industrial Engineers Annual Autumn Conference, 17, pp.71-78.
  8. Lee, C.H. Kim, S.Y. Shin, S.S. Seo, J.S. Im, S.J. Lee, D.H. Park, S.Y. Myung, J.H. & Jegal, S.Y., 2009. Data Quality Assessment Procedure Manual(Ver 1.0). Korea Database Agency: Seoul.
  9. National Information Society Agency, 2012. Korea customs service data quality assessment examples. Public Data Quality Management: Seoul.
  10. Shin, J.G. Lee, J.H. Woo, J.H. Kim, Y.K. & Lee, J.M., 2002. A Digital Manufacturing Model of Shipyard Forming-Shop. Journal of the Korean Welding and Joining Society, 20(2), pp.10-17.
  11. Woo, J.H. Oh, D.K. Kwon, Y.D. Shin, J.G. & Seo, J.N., 2005. Simulation Modeling Methodology and Simulation Framework for a Construction of a Digital Shipyard. Journal of the Society of Naval Architects of Korea, 62(8), pp.411-420.
  12. Zbigniew, B.M. Manuel, N. Mu, L. & Sean, P., 2008. Simulation of a Machining Sequence using Delmia/Quest Software. Computer Aided Design And Applications, 5(1-4), pp.401-411. https://doi.org/10.3722/cadaps.2008.401-411

Cited by

  1. An Approach for Construction of Shipyard Simulation Environment based on Neutral File Format vol.53, pp.1, 2016, https://doi.org/10.3744/SNAK.2016.53.1.18
  2. Production Process Analysis based on Information Strategy Planning with Present Condition Diagnosis of Small FRP Shipyards vol.53, pp.5, 2016, https://doi.org/10.3744/SNAK.2016.53.5.353