Determination of an Optimal Production Run Length in a Deteriorating Production Process with Rework

생산시스템이 불완전하여 재작업이 요구되는 상황에서의 최적 생산시간 결정에 관한 연구

  • Kim, Chang Hyun (School of Business and Commerce, Chonnam National University)
  • 김창현 (전남대학교 문화사회과학대학 경상학부)
  • Received : 2013.03.20
  • Accepted : 2013.09.12
  • Published : 2014.04.15

Abstract

This paper presents an extended EMQ model which determines an optimal production run length in an deteriorating production process. The production process is subject to a random deterioration from an in-control state to an out-of-control state and thus producing some proportion of defective items. Defective items produced are re-processed in the rework process to convert them into non-defectives. Through the mathematical modeling, an optimal solution minimizing the average cost per unit time as well as minimum average cost are derived. Numerical experiment is carried out to examine the behavior of the proposed model depending on model parameters.

Keywords

References

  1. Kim, C. H. and Hong, Y. (1996), An Optimal Production Run Length in A Deteriorating Machine, Journal of the Korean Institute of Industrial Engineers, 22(3), 351-364.
  2. Kim, C. H. and Hong, Y. (1997), An Optimal Production Cycle and Inspection Schedules in A Deteriorating Machine, Journal of the Korean Institute of Industrial Engineers, 23(2), 261-273.
  3. Kim, C. H. (2005), An EMQ Model with Rework, Journal of the Korean Institute of Industrial Engineers, 31(2), 173-179.
  4. Jamal, A. M. M., Sarker, B. R., and Mondal S. (2004), Optimal Manufacturing Batch Size with Rework Process at a Single-Stage Production System, Computers and Industrial Engineering, 47(1), 77-89. https://doi.org/10.1016/j.cie.2004.03.001
  5. Lawless, J. F. (1982), Statistical Models and Methods for Lifetime Data, John Wiley and Sons.
  6. Lee, H. L. and Rosenblatt, M. J. (1987), Simultaneous Determination of Production Cycle and Inspection Schedules In a Production System, Management Science, 33(9), 1125-1136. https://doi.org/10.1287/mnsc.33.9.1125
  7. Lee, H. L. and Rosenblatt, M. J. (1989), A Production and Maintenance Planning Model with Restoration Cost Dependent on Detection Delay, IIE Transactions, 21(4), 368-375. https://doi.org/10.1080/07408178908966243
  8. Liou, M.-J., Tseng, S.-T., and Lin, T.-M. (1994), The Effects of Inspection Errors to the Imperfect EMQ Model, IIE Transactions, 26(2), 42-51. https://doi.org/10.1080/07408179408966595
  9. Porteus, E. L. (1986), Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction, Operations Research, 34(1), 137-144. https://doi.org/10.1287/opre.34.1.137
  10. Rahim, M. A. (1994), Joint Determination of Production Quantity, Inspection Schedule, and Control Chart Design, IIE Transactions, 26(6), 2-11.
  11. Rosenblatt, M. J. and Lee, H. L. (1986), Economic Production Cycles with Imperfect Production Processes, IIE Transactions, 18(1), 48-55. https://doi.org/10.1080/07408178608975329
  12. Salameh, M. K. and Jaber, M. Y. (2000), Economic Production Quantity Model for Items with Imperfect Quality, International Journal of Production Economics, 64, 59-64. https://doi.org/10.1016/S0925-5273(99)00044-4
  13. Sarkar, B. and Moon, I. K. (2011), An EPQ Model with Inflation in an Imperfect Production System, Applied Mathematics and Computation, 217(13), 6159-6167. https://doi.org/10.1016/j.amc.2010.12.098
  14. Yano, C. A. and Lee, H. L. (1995), Lot Sizing with Random Yields : A Review, Operations Research, 43(2), 311-334. https://doi.org/10.1287/opre.43.2.311
  15. Zhang, X. and Gerchak, Y. (1990), Joint Lot Sizing and Inspection Policy in an EOQ Model with Random Yield, IIE Transactions, 22(2), 41-47. https://doi.org/10.1080/07408179008964156

Cited by

  1. Modeling and Implementation of the Affordance-based Human-Machine Collaborative System vol.41, pp.1, 2015, https://doi.org/10.7232/JKIIE.2015.41.1.034