Solution of the Resource Constrained Project Scheduling Problem on the Foundation of a Term-Based Approach

Term-Based Approach를 기초로한 자원제한프로젝트스케줄링 문제의 해결

  • Kim, Pok-Son (Department of Mathematics, Kookmin University)
  • 김복선 (국민대학교 자연과학대학 수학과)
  • Received : 2013.09.01
  • Accepted : 2013.12.30
  • Published : 2014.04.25

Abstract

The logic-based scheduling language RCPSV may be used to model resource-constrained project scheduling problems with variants for minimizing the project completion time. A diagram-based, nonredundant enumeration algorithm for the RCPSV-problem is proposed and the correctness of the algorithm is proved.

Keywords

References

  1. C.-k. Kwon and K.-s. Oh, "Genetic algorithms based on maintaining a diversity of the population for jobshop scheduling problem," Journal of Korean Institute of Intelligent Systems, vol. 11, no. 3, pp. 191-199, 2001.
  2. K. M. Lee and K. M. Lee, "Task allocation and scheduling of multiagent systems with fuzzy task processing times," Journal of Korean Institute of Intelligent Systems, vol. 14, no. 3, pp. 324-329, 2004.
  3. E. Demeulemeester and W. Herroelen, "A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem," Management Science, Vol. 38, No. 12, pp. 1803-1818, 1992. https://doi.org/10.1287/mnsc.38.12.1803
  4. E. Demeulemeester and W. Herroelen, "New Benchmark Results for the Resource-constrained Project Scheduling Problem," Management Science,, Vol. 43, No. 11, pp. 1485-1492, 1997. https://doi.org/10.1287/mnsc.43.11.1485
  5. A. Mingozzi, V. Maniezzo, S. Ricciardelli and L. Bianco, "An exact Algorithm for Project Scheduling with Resource Constraints based on a New Mathematical Formulation," Management Science, Vol. 44, No. 5, pp. 714-729, 1998. https://doi.org/10.1287/mnsc.44.5.714
  6. P. S. Kim and M. Schmidt-Schauss, "A Term-Based Approach to Project Scheduling," Lecture Notes in Artificial Intelligence Series 2120, p. 304 ff., Springer-Verlag, 2001.
  7. F. M. Donini, M. Lenzerini, D. Nardi and W. Nutt, "The Complexity of Concept Languages," Information and Computation, Vol. 134, No. 1, pp. 1-58, 1997. https://doi.org/10.1006/inco.1997.2625
  8. B. Nebel and K. von Luck, "Hybrid Reasoning in BACK," Methodologies for Intelligent Systems, North Holland, Amsterdam, Netherlands, pp. 260-269, 1988.
  9. P. Brucker, S. Knust, A. Schoo and O. Thiele, "A Branch and Bound Algorithm for the Resource-constrained Project Scheduling Problem," European J ournal of Operational Research, Vol. 107, pp. 272-288, 1998. https://doi.org/10.1016/S0377-2217(97)00335-4