Abstract

The appropriateness of railway route design is generally evaluated by the future value corresponding to the travel demand or benefit-cost analysis. These methods may have the limitation for the reasons that all the design alternatives cannot be considered, and the differentiation between the alternatives may not be significant because the alternatives are based on the strict basic scheme such as the design criteria. In addition, the cost varies by the design elements. In this study, all the design alternatives are considered with the automatized tool and the design criteria, and evaluated with the multi-criterion decision making method. The weight for each design element with the analytic hierarchical process may be helpful to derive more efficient railway alignment.

철도 노선설계 후 노선의 적합도 평가는 수요의 변화를 기준으로 한 장래 가치의 환산 또는 비용편익 분석을 통한 대안 간 평가 등으로 이루어지고 있다. 그러나 이는 설계 가능한 모든 대안의 조사가 불가능하고, 설계기준과 같은 기본 틀은 편차가 적어 대안간 적합성을 상호비교하는 데에는 적절치 못할 것이다. 또한 비용은 설계요소에 따라 변화되므로 이를 적용하는 데에는 한계가 있다. 본 연구에서는 자동화된 설계방법으로 조사된 모든 대안을 대상으로 하고, 설계기준을 모든 대안에 적용하여 기준을 벗어나지 않도록 하며, 단일 평가항목이 아닌 다 기준 의사결정 방법을 사용하여 선형설계요소의 가중치를 평가하였다. AHP (Analytic Hierarchical Process) 기법을 사용한 가중치 평가결과를 통하여 철도선형계획에서 중점을 두어야 하는 요소들을 고려함으로써, 보다 최적화된 철도선형을 도출할 수 있을 것으로 기대된다.

Keywords

References

  1. Kang, M. K. (2008). Decision Making Theory, Hongrung Publishing, Seoul, Korea.
  2. Ministry of Land, Infrastructure and Transport (2013). A study on the railway competitiveness improvement (in Korean).
  3. Kim, M. J., Kwon, S. H. and Lee, K. H. (2012). "The development of an eco-value efficiency evaluation model according to the railway alighment change based on VE." The Korean Society for Railway, Kyungju, Korea.
  4. Saaty, T. L. (1980). Decision Making for Leaders: The analytic hierarchy process for decisions in a complex world, RWS Publications, Pittsburgh, PA.
  5. Saaty, T. L. (2005). Theory and applications of the analytic network process, RWS Publications, Pittsburgh, PA.
  6. Yang, M., Wang, W., Chen, X. and Li, W. (2007). "Mode choice for the mass rapid transit system based on combined method of DEA and AHP." J. of Hwy. and Transport. Research and Development, ASCE, Vol. 2, No. 1, pp. 89-94.
  7. Jie, L. and Zou, X. (2011). "Fuzzy AHP-Based risk assessment methodology for PPP projects." J. of Const. Eng. and Management, ASCE, Vol. 137, No. 12, pp. 1205-1209. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000362