Abstract

The existing shield tunnel has constructed in the concept of non-drainage uniformly, but the leak has become a problem in the construction and management. The Shield tunnel design allowed for the water and earth pressure bring about the increasing segment thickness and the construction costs. In order to improve these problems, the study of the partial drainage shield tunnel is in progress. In this study, th model experiment was performed to confirm the possibility of the partial drainage shield tunnel. And the water and earth pressure was measured in drainage and undrained condition. Based on the results of model experiments, the effect of water pressure reduction was confirmed by reviewed the structure stability of the real design case.

기존 쉴드터널은 일률적으로 비배수 개념이 적용되고 있지만 시공 및 운영 과정에서 고질적인 누수 발생이 문제가 되고 있으며, 쉴드 세그먼트의 경우 토압 및 수압까지 고려한 설계로 인해 단면이 과다하게 증가되고 세그먼트 재료비 상승을 유발하고 있다. 이러한 문제점들을 개선하기 위해 쉴드터널에 배수 개념을 적용한 부분배수형 쉴드터널에 대한 연구가 진행되고 있다. 본 연구에서는 부분배수 쉴드터널의 적용 가능성을 평가하기 위해 축소모형실험을 통해 배수 및 비배수 조건에서의 토압 및 수압 변화를 측정하였다. 실험 결과를 통해 도출된 수압 저감 효과를 바탕으로 지하수위 아래 위치한 쉴드터널 설계사례에 적용하여 구조 안정성을 검토하였고, 수압 저감을 통한 세그먼트 단면 축소 효과에 대해 평가하였다.

Keywords

References

  1. Chang, S. H., Lee, G. P., Choi, S. W. and Bae, G. J. (2011). "State of the art of segment lining in shield tunnel and statistical analysis of its key design parameters." J. of the Korean Society for Rock Mechanics, Korean Society for Rock Mechanics, Vol. 21, No. 6, pp. 424-438 (in Korean).
  2. Choi, G. M., Yune, C. Y. and Ma, S. J. (2013). "An experiment with a model to study action of shield-tunnel lining subject to drain condition." Proc. of 2013 Fall Conf. on Korean Geotechnacal Society, Korean Geotechnacal Society, pp. 1224-1229 (in Korean).
  3. Jue, K. S., Sim, D. H., Kim, K. C., Jang, S. J., Choi, C. R. and Han, S. H. (2012). "A study of key items on the shield tunnel design for passing through under the han-river." Proc. of 2012 Spring Conf. on Korean Society for Railway, Korean Society for Railway, pp. 1101-1106 (in Korean).
  4. Kim, D. M. and Ma, S. J. (2013). "An assessment study on the optimal size of the drainage furrow in the partial drain shield tunnel." Proc. of 2013 Conf. on Korean Society of Civil Engineers, KSCE (in Korean).
  5. Kim, D. M., Ma, S. J. and Gil, H. J. (2012). "Study on application possibility for partial drain concept of shield tunnel using drainage hole." Proc. of 2012 Conf. on Korean Society of Civil Engineers, KSCE, pp. 1346-1349 (in Korean).
  6. Lee, I. M. (1996). "A study of underground water problem in tunneling." J. of the Korean Society of Explosives and Blasting Engineering, KSEE, Vol. 14, No. 3, pp. 19-31 (in Korean).
  7. Park, D. H. (2013). A study on hydraulic characteristics of circular blocks installed around pier, Ph.D. Dissertation, University of Dong-A, Busan, Korea, pp. 55-56 (in Korean).
  8. Park, M. J., Woo, J. Y., Lee, J. H. and Song, Y. S. (2013). "Analysis of curved-channel characteristics on sloping drop structure using hydraulic model experiments." J. of the Korean Society of Hazard Mitigation, KOSHAM, Vol. 13, No. 3, pp. 168-169 (in Korean).
  9. Shin, J. H., An, S. R. and Shin, Y. S. (2005). "Pore water pressure development mechanism and sustainability of tunnel linings." Proc. of 2005 Conf. on Korean Society of Civil Engineers, KSCE, pp. 2958-2965 (in Korean).
  10. Ward, W. H. and Pender, M. J. (1981). "Tunnelling in soft ground-general report." Proc. the 10th Int. Conf. on Soil Mechanics and Foundation Engineering, Soil Mechanics and Foundation Engineering, Stockholm, Vol. 4, pp. 261-275.

Cited by

  1. The study on the hydraulic pressure reduction of drainage shield tunnel using model test and field instrumentation vol.17, pp.4, 2015, https://doi.org/10.9711/KTAJ.2015.17.4.429