Construction Monitoring Methods of FCM Bridge Using Temperature Data

온도데이터를 활용한 현장타설 캔틸레버 교량의 시공 중 계측

  • Received : 2016.01.11
  • Accepted : 2016.05.05
  • Published : 2016.06.30

Abstract

In this study, we have proposed a method of monitoring of bridges under construction in view of the long-term behavior of the prestress concrete bridge of which the Free Cantilever Method is applied. As a method to confirm the ability of the long-term behavior of the concrete box girder, temperature sensors and strain gauges were installed, and the measured data was used to calculate creep coefficient. Moreover, we have measured the stress of the concrete box girder during construction which was applied with creep coefficient and compared with the changes in temperature to analyze the vertical displacement along the segment. In conclusion, monitoring of the FCM bridge during construction in consideration of the long-term behavior can be analyzed efficiently by suing temperature and displacement data without the use of laser displacement meter or laser delfectometer.

이 연구에서는 현장타설 캔틸레버공법(free cantilever method)을 적용한 PSC(prestressed concrete) 교량에 콘크리트의 장기거동을 고려한 시공 중 계측분석 방법을 제안하였다. 콘크리트 박스 거더의 장기 거동에 따른 응력을 확인하기 위해 온도센서와 변형률계를 함께 설치하고 계측된 데이터를 이용하여 크리프계수를 산출하였다. 또한 크리프계수를 적용한 콘크리트 박스 거더의 시공 중 응력을 분석하고 설치된 온도 센서의 변화 데이터를 비교하여 세그먼트 시공에 따른 연직변위를 분석하였다. 연구결과, 교량의 장기 거동을 고려한 FCM 교량의 시공 중 계측은 레이저 변위계나 처짐계를 사용하지 않고 온도와 변위 데이터만을 이용하여 효율적인 분석이 가능한 것으로 나타났다.

Keywords

References

  1. Aktan, A.E., Catbas, F.N., Grimmelsman, K.A., Pervizpour, M. (2002) Development of a Model Health Monitoring Guide for Major Bridges, FWHA. p.37.
  2. Chang, S.P. (1995) Structural Monitoring of a Steel Composite Cable-stayed Bridge, Proceedings of Public Infrastructure Systems.
  3. Cho, H.N., Kang, K.K., Cha, C.J. (2005) Reliabilitybased Managing Criteria for Cable Tension Force Incable-stayed Bridge, J. KSMI, 9(3), pp.129-138.
  4. Fib Federation Internationale Du Beton (2003) Monitoring and Safety Evaluation of Existing Concrete Structures: State-of-art Report, FIB, p.297.
  5. Joo, B.C., Park, K.T., Lee, W.S. (2008) Propose Standardizing the Existing Determination Method of the Management Criteria in Bridge Monitoring System, Proc. KSCE, 1, pp.3329-3332.
  6. Jung, C.H., Ahn, H.H., Shin, S.B., Kim, Y.H. (2014) Reset of Measurement Control Criteria for Monitoring Data through the Analysis of Measured Data, J. KSMI, 18(6), pp.105-113.
  7. Kim, H., Shin, S. (2010) Principal Component Analysis Based Structural Health Monitoring under Varying Environmental Effects, Proc. KSCE, 1, pp.1369-1373.
  8. Kim, H., Yoon, J.G., Lee, J., Chang, S.P. (2005) Analysis of Long-term Monitoring results of a Cable-stayed Bridge using ARX Model, Proc. KSCE, 1, pp.928-931.
  9. Lee, C.S., Jang, J.H., Lee, J.S., Kim, N.H. (2005) Construction Monitoring for Steel Truss Bridge Widening Works, J. KSMI, 9(2), pp.103-112.
  10. Yoon, J.G., Jang, J.H., Lim, C.K., Jang, S.P. (1998) Measurement of Haeng-Ju Grand Bridge for Construction and Maintenance, Proc. KSCE, 1, pp.569-572.
  11. Yoon, J.G., Lee, J.H., Jang, S.P., Kim, B.K. (2000) Construction Monitoring of FCM Bridge, Proc. KSCE, 1, pp.103-106.