DOI QR코드

DOI QR Code

Simulation and Testing of the Effect of Current Collection Performance According to Pre-sag in 400km/h Overhead Contact Lines

400km/h 전차선로에서 사전이도가 집전성능에 미치는 영향에 대한 시뮬레이션 및 시험

  • Kwon, Sam Young (High-speed Railroad System Research Center, Korea Railroad Research Institute) ;
  • Cho, Yong Hyeon (High-speed Railroad System Research Center, Korea Railroad Research Institute) ;
  • Lee, Kiwon (High-speed Railroad System Research Center, Korea Railroad Research Institute) ;
  • Oh, Hyuck Keun (High-speed Railroad System Research Center, Korea Railroad Research Institute)
  • Received : 2015.09.28
  • Accepted : 2016.04.08
  • Published : 2016.06.30

Abstract

A 400km/h simple catenary system was constructed as a test line in Korea. In the design stage of this system, the pre-sag was one of the engineering issues most focused on. It is known that the pre-sag improves the current collection performance in a certain band of high speed. However, the effect of pre-sag at 400km/h has not yet been established. To grasp a better pre-sag in the 400km/h catenary, we transacted the dynamic performance prediction simulation between catenary and pantograph under conditions of 0 and 1/3000 pre-sag. The level of 0 pre-sag was adapted for the 400km/h catenary design after reviewing predictions. We constituted the 1/3000 pre-sag sample section (about 1km) while constructing the 400km/h catenary test-bed (28km) of 0 pre-sag. With a HEMU-430X train, the contact forces were measured in the test-bed including the pre-sag sample section. In this paper, the predicted and measured dynamic performance values (contact forces) for 0 and 1/3000 pre-sag are described and compared. It is conclusively confirmed by analytical and experimental examination that the non pre-sag showed better dynamic (current collection) performance than that of the 1/3000 pre-sag for the 400km/h catenary system.

400km/h급 전차선로가 우리나라에 시범 부설되었다. 400km/h 심플 커티너리를 설계함에 있어서 사전이도를 어떻게 해야 하는가는 관심이 집중된 엔지니어링 항목이다. 사전이도는 일정 고속 대역에서 집전성능을 향상시키는 것으로 알려져 있다. 그러나 400km/h 속도에서 효과에 대해서는 아직 정립되어있지 않다. 400km/h 커티너리에서 적절한 사전이도량을 파악하기 위하여 사전이도 0과 1/3000 조건에서 전차선과 팬터그래프 사이 동적 성능 예측 시뮬레이션을 실시하였다. 이 예측에 근거하여 400km/h 전차선로 설계에서는 0 사전이도를 채택하였다. 그리고 400km/h 전차선로 시범구간(28km)을 건설하면서 일부구간에 1/3000 사전이도 구간(약 1km)을 조성하였다. HEMU-430X 열차를 투입하여 사전이도 조성 구간을 포함하여 시범구간에서 접촉력 측정을 실시하였다. 본 논문에서는 사전이도 조성 구간과 사전이도가 없는 구간의 동적 성능(접촉력)에 대하여 기술하며 그 둘을 비교한다. 결론적으로 400km/h 전차선로에서 사전이도를 주지 않은 구간이 1/3000 사전이도 구간보다 양호한 동적(집전) 성능을 나타냄을 해석적 및 실험적 검토를 통하여 확인하였다.

Keywords

References

  1. SIMENS (2009) Contact lines for electric railways-planning, design, implementation, maintenance, Publicis Publishing, pp. 636-638.
  2. Bauer, K.H., Seifert, R. (1991) Testing of the high-speed overhead contact line Re250 of Deutsche Bundesbahn, Elektrische Bahnen 89, pp. 424-425.
  3. F. Kiessling (1985) Contribution to Siemens railway symposium, Erlangen.
  4. O. Dorenberg (1965) German railway tests to develop an overhead contact line for very high speeds, Elektrische Bahnen 63, 6, pp. 148-155.
  5. Y.H. Cho, K.W. Lee, Y. Park, B.B. Kang, K.N. Kim (2010) Influence of contact wire pre-sag on the dynamics of pantograph- railway catenary, I. J. of Mechanical Sciences, 52, pp. 1471-1490. https://doi.org/10.1016/j.ijmecsci.2010.04.002
  6. Y.H. Cho (2008) Numerical simulation of the dynamic response of railway overhead contact lines to a moving pantograph , considering a nonlinear dropper, Journal of Sound and Vibration, 315, pp. 433-454. https://doi.org/10.1016/j.jsv.2008.02.024
  7. T.X. Wu, M.J. Brennan (1999) Dynamic stiffness of a railway overhead wire system and its effect on pantograph-catenary system dynamics, J Sound Vib 1999, 219(3), pp. 483-502. https://doi.org/10.1006/jsvi.1998.1869
  8. W. Zhang, G. Mei, J. Zeng (2002) A study of pantograph/catenary system dynamics with influence on pre-sag and irregularity of contact wire, Vehicle System Dynamics, Suppl. 37, pp. 593-604. https://doi.org/10.1080/00423114.2002.11666265
  9. Railways Technical Research Institute (1993) Characteristics of contact wire and pantograph, Yeonusa publishing authority, pp. 7-9.
  10. S.Y. Kwon, S.H. An, J.S. Choo (2009) A review on the geometry changes when increasing the contact wire tension to implement 400km/h test run of the next high speed train HEMU-430X, Proc. of autumn conference of the Korean society for railway, Jeju, pp. 206.
  11. Stefano Bruni, Jorge Ambrosiob, Alberto Cariceroc,Y.H. Cho, et al. (2015) The results of the pantograph-catenary interaction benchmark, Vehicle System Dynamics, 53(3), pp. 412-435. https://doi.org/10.1080/00423114.2014.953183
  12. S.H. An, Y.H. Kim (2012) A study on the geometry change for the increased contact wire tension in the pre-sagged existing catenary, Journal of The Korean Society for Railway, 15(5), pp. 447-453. https://doi.org/10.7782/JKSR.2012.15.5.447
  13. Y.H. Cho, K.W. Lee, S.Y. Kwon, et al. (2013) The analysis of fatigue test load for droppers in overhead contact line for 400km/h operation, Proceedings of Autumn Conference of the Korean Society for Railway, Daegu, pp. 41-48.
  14. Kunio Ikeda (2005) Optimization of overhead contact lines for Shinkansen speed increases, JR EAST technical review-No.12 Special edition paper, pp. 64-69.