DOI QR코드

DOI QR Code

Development on Reconstruction Cost Model for Decision Making of Bridge Maintenance

교량 유지관리 의사결정 지원을 위한 개축비용 산정모델 개발

  • Sun, Jong-Wan (Structural Eng. Research Division, Korea Institute of Civil Eng. and Building Tech.) ;
  • Lee, Dong-Yeol (Structural Eng. Research Division, Korea Institute of Civil Eng. and Building Tech.) ;
  • Lee, Min-Jae (Department of Civil Engineering, Chungnam National University) ;
  • Park, Kyung-Hoon (Structural Eng. Research Division, Korea Institute of Civil Eng. and Building Tech.)
  • 선종완 (한국건설기술연구원 구조융합연구소) ;
  • 이동열 (한국건설기술연구원 구조융합연구소) ;
  • 이민재 (충남대학교 토목공학과) ;
  • 박경훈 (한국건설기술연구원 구조융합연구소)
  • Received : 2016.06.16
  • Accepted : 2016.09.09
  • Published : 2016.09.30

Abstract

The periodic maintenance of bridges is necessary once they have been constructed and its cost depends on various factors, such as their condition, environmental conditions and so on. To make a decision support system, it is essential to establish a basic reconstruction cost model. In this study, a regression model is suggested for calculating the reconstruction cost for typical cases and influential factors, depending on the type of bridge and its components, by analyzing the basic bridge specifications based on the data of the Bridge Management System (BMS). The details for each case were estimated in consideration of the cost calculation variables. The details for each case were estimated in consideration of the cost calculation variables. The cost model for the new construction of the superstructure, substructure and foundation and the temporary bridge construction and demolition costs were drawn from the regression analysis of the estimation results of typical cases according to the cost calculation variables. The reconstruction costs for different types of bridge were obtained using the cost model and compared with those in the literature. The cost model developed herein is expected to be utilized effectively in maintenance decision making.

교량의 유지관리 비용은 교량 건설 후 주기적으로 발생하게 되며 교량의 상태, 환경 조건 등 여러 요인들이 복합적으로 고려되어야 한다. 개축은 유지관리 단계에서 발생하는 조치 중 가장 최종적이며 대규모 비용이 투입되는 조치로서 교량 유지관리 의사 결정 지원을 위해서는 기본적인 개축 비용 산정 모델의 수립이 필수적이다. 본 연구에서는 교량의 개축 비용 산정을 위한 회귀 모델을 개발하였다. 이를 위해 교량관리시스템(Bridge Management System) 데이터베이스(database) 상의 교량 기본 제원을 분석하여 교량 형식별, 구성 요소별 대표 표본과 주요 영향 인자들을 정의하였다. 각 표본별 비용 산정변수를 고려하여 내역 작업을 수행하였다. 비용 산정 변수에 따른 대표 표본의 적산 결과를 회귀분석하여 상부구조, 하부구조, 기초 등의 신설 비용과 가교 설치 비용, 해체 폐기 비용에 대한 비용 모델을 도출하였다. 개발된 비용 모델을 활용하여 공용 중인 교량 형식별 개축 비용을 도출하고 단가를 산출하여 기존 문헌과의 비교 검토를 수행하였으며, 유지관리 의사결정에 효과적으로 활용될 것으로 기대된다.

Keywords

References

  1. Korea Institute of Civil Engineering and Building Technology, Developing Bridge Management System considering Life-Cycle Cost and Performance of Bridges, Ministry of Land, Transport and Maritime Affairs, 2012.
  2. Ministry of Land, Infrastructure and Transport, White Paper of Korean Roads, 2014.
  3. https://nbms.kict.re.kr (accessed Jun., 10, 2016)
  4. Korea Expressway Corporation, Guideline for Life-cycle Cost(LCC) Analysis of Expressway Bridges, 2003.
  5. Ministry of Construction and Transportation, Guideline for investment evaluation of Transportation Development, 2007.
  6. Chang Won Sun, Kab Sao Kyung, Shin Hwa Kang, Soon Cheal Kwon, "Analysis on Characteristic of Construction Cost for Steel Box Bridge", Journal of The Korean Society of Steel Construction vol. 21, no. 1, pp. 1-14, 2009.
  7. Sang-Bum Kim, Ji-Hoon Cho, "Development of the Approximate Cost Estimating Model for PSC Box Girder Bridge based on the Breakdown of Standard Work", Journal of the Korean Society of Civil Engineers, vol. 33, no. 2, pp. 791-800, 2013. DOI: http://dx.doi.org/10.12652/Ksce.2013.33.2.791
  8. Byung-soo Kim, Taehoon Hong, "Revised Case-Based Reasoning Model Development Based on Multiple Regression Analysis for Railroad Bridge Construction", Journal of Construction Engineering and Management, vol. 138, no. 1, pp. 154-162, 2012. DOI: http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0000393
  9. Behrouz Behmardi, Toni Doolen, Holly Winston, "Comparison of Predictive Cost Models for Bridge Replacement Projects", Journal of Management in Engineering, vol. 31, no. 4, 2015. DOI: http://dx.doi.org/10.1061/(ASCE)ME.1943-5479.0000269
  10. Indushobha N. Chengalur-Smith, Donald P. Ballou, Harold L. Pazer, "Modeling the Cost of Bridge Rehabilitation", Transportation Research Part A: Policy and Practice, vol. 31, Issue 4, pp. 281-293, 1997. DOI: http://dx.doi.org/10.1016/S0965-8564(96)00028-6
  11. Marcela M. Rodriguez, Samuel Labi, Zongzhi Li, "Enhanced bridge replacement cost models for Indiana's bridge management system", Transportation Research Record 1958, pp. 13-23, 2006. DOI: http://dx.doi.org/10.3141/1958-02
  12. New York Department of Transportation, Program Development Unit[internet]. Preliminary Cost Estimating Worksheet for New and Replacement Bridges, https://www.dot.ny.gov/divisions/engineering/structures/manuals/preliminary-cost (accessed Jun., 10, 2016).
  13. Ministry of Land, Transport and Maritime Affairs, Design VE Manual of National Road Construction, 2009.