DOI QR코드

DOI QR Code

Challenges and Strategies for Commissioning of FLNG

  • Lee, Dong Hyun (Offshore proposal team, Samsung Heavy Industries) ;
  • Seo, Kwang Su (Offshore proposal team, Samsung Heavy Industries) ;
  • Yeo, Jong Su (Offshore proposal team, Samsung Heavy Industries) ;
  • Kim, Myung Ki (Offshore proposal team, Samsung Heavy Industries)
  • 투고 : 2015.06.25
  • 심사 : 2016.08.20
  • 발행 : 2016.09.30

초록

After the construction of offshore plants, the function and integrity of system in offshore plants should be commissioned. As the executor of many FLNG projects, Samsung Heavy Industries Co., Ltd has faced some challenges for commissioning which are not similar to those in other offshore project. This study shows the differences between the commissioning of typical offshore projects and the one of FLNG projects. By the characteristics of offshore, performing the commissioning activity of FLNG near shipyard as much as possible reduces the risk of malfunction. The possible solutions to achieve these strategies are introduced.

키워드

참고문헌

  1. OCIMF(Oil Companies International Marine Forum), International Safety Guide for Oil Tanker and Terminal(2010).
  2. KHOA(Korea Hydrographic and Oceanographic Agency), Annual report for oceanographic observation in real time(2015).