The purpose of this paper is to carry out Failure Modes and Effects Analysis (FMEA) and use criticality in order to determine risk priority number of the components of electric power installations in Engineering college building of D university. In risk priority number, GROUP A had 7 failure modes; more specifically, Transfomer had 4 modes, Filter(C)(1 mode), LA(1 mode), and CB(MCCB)(1 mode), and thus 4 components had failure modes. In terms of criticality, high-grade group a total of 16 failure modes, and 7 components-LA(1 mode), CB(MCCB)(1 mode), MOF(2 modes), PT(1 mode), Transformer(7 modes), Cable(3 modes), and Filter(C)(1 mode)-had failure modes. Comparison of risk priority number and criticality was made. The components which had high risk priority number and high criticality were Transformer, Filter(C), LA, and CB(MCCB). The components which had high criticality were MOF and cable. In particular, Transformer(RPN: 4 modes, Criticality: 7 modes) was chosen as an intensive management component.

Keywords

References

  1. http://www.aptn.co.kr/, "Check of Power installations to prevent safety accidents", 2005.
  2. Y. -S. Kim and K. -M. Shong, Investigation of Facility Accident and Suggestion of Guide Line for Accident Process on 22.9 kV Class Electrical Installation. The Korean Institute of Electrical Engineers (KIEE), pp.137-138, 2009.
  3. IEC-60812(2001) : Analysis Techniques for System Reliability-procedure for Failure Mode and Effects Analysis(FMEA), IEC.
  4. B. J. Bowles, "The New SAE FMECA Standard", Proc. Ann, Reliability & Maintainability Symp., pp.48-58, 1998.
  5. D. -H. Kim and J. -H. Lee, "Qualitative Assessment for Hazard on the Electric Power Installations of a Construction Field Using FMEA", J. Korean Soc. Saf.,Vol.19, No.4. pp.36-41, 2004.
  6. H. -K. Lim, System Safety Engineering, Hansol Academy, pp. 93, 2012.
  7. SAE-ARP5580, Failure Modes, Effects, and Criticality Analysis Procedures, SAE, 2001.
  8. MIL-1629a, Procedures for Performing a Failure Mode and, Efects and Criticality Analysis, DOD, 1980.
  9. Reliability Analysis Center,2011, Non-electronic Parts Reliability Data & Electronic Parts Reliability Data, 2011.
  10. D. -h. Kim, "A Study on Development of Evaluation Model for Reliability and Safety of Temporary Electric Power Installations", Chungbuk National University, pp.35-40, 2004.