A Study on the Impact of Project Performance According to the Implementation type of PMO Function : Focus on Information and Communication Technology Industry

PMO 기능 도입유형에 따른 프로젝트 성과의 영향 연구 : ICT 산업을 중심으로

  • Received : 2017.02.03
  • Accepted : 2017.04.28
  • Published : 2017.06.30

Abstract

It is well known that PMO (Project Management Office)s are effective for successful project performance. Since it takes a long time to develop PMO capability, many public organizations and companies that do not have internal PMOs are increasingly relying on outsourcing of PMO functions in order to introduce mature PMO capabilities in a short period of time. However, it is not verified yet whether outsourced PMO is more effective than internal PMO or not. The objective of this study is to verify the effectiveness of PMO outsourcing. There are many different definitions about PMO function, and even the same PMO function may have different effectiveness depending on the Industry. Thus, this study redefined the PMO functions and Project Performance based on the past studies, and conducted research by focusing on the ICT (Information and Communication Technology) industry. The ICT industry is an important industry economically and has been attracting global attention recently. This study is the first attempt to prove the effectiveness of outsourcing of PMO function in Korea. We found that PMO function outsourcing is effective for certain aspects of project performance, particularly technical support and infrastructure management. Overall, PMO outsourcing is usually more effective than internal PMO for improving project performance. The results of this study are expected to contribute to the development of PMO theories and practices.

Keywords

References

  1. Atkinson, R., "Project Management : Cost, Time and Quality, Two best Guesses and a Phenomenon, it's Time to Accept other Success Criteria", International Journal of Project Management, Vol.17, No.6, 1999, 337-342. https://doi.org/10.1016/S0263-7863(98)00069-6
  2. Ayyagri, R., R. Henry, and R. Purvis, "A Conceptual Framework of the Alignment of the Project Management Office (PMO) with the Organizational Structure", Proceedings of the Twelfth Americas Conference on Information Systems, Mexico August 4th-06th, 2006, 3741-3749.
  3. Baccarini, D., "The Concept of Project Complexity-A Review", International Journal of Project Management, Vol.14, No.4, 1996, 201-204. https://doi.org/10.1016/0263-7863(95)00093-3
  4. Berry, L.L. and A. Parasuraman, Marketing Services : Competing through Quality, New York, Free Press, 1991.
  5. B.I.A Research Report, "The Impact of Implementing A Project Management Office-Report on the Results of the On-Line Survey", 2005.
  6. Chase, R.B. and D.M. Stewart, "Make Your Service Fail-safe", Sloan Management Review, Vol.35, No.3, 1994, 35.
  7. Dai, C.X. and W.G. Wells, "An Exploration of Project Management Office Features and their Relationship to Project Performance", International Journal of Project Management, Vol.22, No.7, 2004, 523-532. https://doi.org/10.1016/j.ijproman.2004.04.001
  8. DeLone, W.H. and E.R. McLean, "The DeLone and McLean Model of Information System Success : A Ten-Year Update", Information System Research, Vol.19, No.4, 2003, 9-30.
  9. Ellram, L.M., L.T. Wendy, and C. Billington, "Offshore Outsourcing of Professional Services : A Transaction Cost Economics Perspective", Journal of Operations Management, Vol.26, No.2, 2008, 148-163. https://doi.org/10.1016/j.jom.2007.02.008
  10. Ha, M.S. and Y.H. Oh, "The Impact of Third Party Logistics on Logistics Performance", Korea Academy of International Commerce, Vol.18, No.1, 2003, 23-43. (하명신, 오영학, "제 3자 물류가 물류 성과에 미치는 영향에 관한 연구", 국제상학, 제18권, 제1호, 2003, 23-43.)
  11. Han, I.S., "Moderated Multiple Regression and Statistical Power Problems", Journal of Industrial Relations, Vol.13, 2002, 143-161. (한인수, "조절회귀분석의 통계적 검정력에 대한 연구", 노사관계 연구, 제13권, 2002, 143-161.)
  12. Hill, G.M., "Evolving the Project Management Office : A Competency Continuum", Information Systems Management, Vol.21, No.4, 2004a, 45-51. https://doi.org/10.1201/1078/44705.21.4.20040901/84187.6
  13. Hill, G.M., The Complete Project Management Office Handbook, Boca Raton 3rd Editions, FL : CRC Press, 2014b.
  14. Jo, N.J., S.W. Yoon, and S.H. Park, "The Research of WBS Affected by the Project Complexity on the Information Systems Development", Proceedings of Information Systems Review, 2001, 573-582. (조남재, 윤성원, 박상혁, "정보시스템 개발 프로젝트의 복잡성이 작업분류구조(WBS)에 미치는 영향", 한국경영정보학회 학술대회, 2001, 573-582.)
  15. Karkukly, W., "An Investigation into Outsourcing of PMO Functions for Improved Organizational Performance : A Quantitative and Qualitative Study", Trafford Publishing, 2011.
  16. Karlsen, J.T. and P. Gottschalk, "Management Roles for Successful IT Projects", Project Management, Vol.8, No.1, 2002, 7-13.
  17. Kim, S.Y. and Y.H. Chang, "A Research on the Core of Functions and Management Level of PMO to Improve IS Project Performance", Information System Research, Vol.15, No.4, 2006, 1-22. (김상열, 장윤희, "정보시스템 개발 프로젝트 성과 향상을 위한 PMO 핵심 기능과 관리 수준에 관한 연구 : 금융권 차세대 프로젝트 사례를 중심으로", 정보시스템연구, 제15권, 제4호, 2006, 1-22.)
  18. Kim, J.K. and O.S. Yoon, "The Effect of PMO Function on IT Project Performance", Information System Research, Vol.20, No.3, 2011, 129-159. (김종기, 윤옥수, "PMO 기능이 프로젝트 성과에 미치는 영향", 정보시스템연구, 제20권, 제3호, 2011, 129-159.) https://doi.org/10.5859/KAIS.2011.20.3.129
  19. Kim, E.S., "An Empirical Study on PMO Affecting the Success of IT Projects", Soongsil University Graduate School of IT Policy and Management Doctorate Thesis, 2013. (김은석, "PMO가 정보화프로젝트 성공에 미치는 영향에 관한 실증적 연구", 숭실대학교 IT정책 경영학과 박사학위논문, 2013.)
  20. Kim, Y.S., "A Study on Quality Evaluation Model of PMO(Project Management Office) Consulting Service", Hanyang University, MS Thesis, 2004. (김용성, 외부 PMO(Project Management Office) 컨설팅 서비스 품질평가모델에 관한 연구, 한양대학교 경영학 석사학위논문, 2004.)
  21. Kwak, Y.H., "Investigating Project Management Processes and Practices in 4 Different Sectors", Business Administration Research, Vol.31, No.5, 1278-1288, 2002. (곽영훈, "프로젝트관리기법 도입 및 적용에 대한 4개 산업 비교 및 분석", 경영학연구, 제31권, 제5호, 2002, 1278-1288.)
  22. Lee, J.B., Y.H. Jang, and S.Y. Kim, "A Research on the PMO Functions and PMO Management Level to Increase the IS Project Performance", Digital Policy Research, Vol.9, No.2, 2011, 111-129. (이재범, 장윤희, 김상열, "정보시스템 프로젝트 성과 향상을 위한 PMO 기능과 관리수준에 관한 연구", 디지털정책연구, 제9권, 제2호, 2011, 111-129.)
  23. Lee, A.Y., "A Study on the Effect of PMO Functions for the Project Performance : By Industry-Specific, Period and Type", Hanyang University Business School MS Thesis, 2014. (이아연, "PMO 기능이 산업별․기간별․유형별에 따른 프로젝트 성과에 미치는 영향에 관한 연구", 한양대학교 경영대학원 석사학위논문, 2014.)
  24. Lee, J.B., J.C. Lee, and Y.H. Jang, "A Research on the Core PMO Function and Operation Type for the IT Project of Financial Industry in Korea", Journal of Digital Policy & Management, Vol.7, No.3, 2009, 35-47. (이재범, 이재철, 장윤희, "금융권 핵심 PMO 기능과 운영형태에 관한 연구", 디지털정책연구, 제7권, 제3호, 2009, 35-47.)
  25. Lee, S.M., "An Effect of Project Performance by PMO Service and Capability", Proceedings of Journal of the Korea Society of IT Services, No.3, 2012, 616-619. (이성몽, "PMO 서비스와 PMO 역량이 프로젝트 성과에 미치는 영향", 한국IT서비스학회 학술대회, 제3호, 2012, 616-619.)
  26. Martin, N.L., J.M. Pearson, and K.A. Furumo, "IS Project Management : Size, Complexity, Practices and the Project Management Office", Proceeding of the 38th Hawaii International Conference on System Sciences, 2005, 1-10.
  27. Ministry of Science, "ICT and Future Planning", K-ICT Strategy, 2015. (미래창조과학부, "K-ICT 전략", 2015.)
  28. Murphy, P.R. and R.F. Poist, "Third-party Logistics : Some user Versus Provider Perspectives", Journal of Business Logistics, Vol.21, No.1, 2000, 121.
  29. Park, B.G., G.G. Lim, and W.S. Yoo, "The Effects of Scope Management on Process Performance and Output Performance in the Information System Development Project : An Analysis from Project Supplier's Perspective", Journal of the Korea Society of IT Services, Vol.8, 2009, 83-100. (박봉구, 임규건, 유원상, "공급자 관점에서 정보시스템 개발 프로젝트의 범위관리활동이 프로세스성과와 결과물성과에 미치는 영향에 대한 연구", 한국IT서비스학회지, Vol.8, 2009, 83-100.)
  30. Park, H.J., "Research on Major PMO Functions for Korea Public Sectors based on Recent PMO Survey", Korea University Graduate School of Computer Information Engineering MS Thesis, 2013. (박현준, "선행 PMO 기능 연구에 따른 한국형 PMO 발전 방향에 관한 연구", 고려대학교 컴퓨터정보공학대학원 석사학위논문, 2013.)
  31. Pinto, J.L. and D. Sleven, "Critical Factor in Successful Project Implementation", IEEE Transaction on Engineering Management, Vol.EM-34, No.1, 1987, 22-27. https://doi.org/10.1109/TEM.1987.6498856
  32. PMS, "The State of the PMO 2010", A PM Solutions Research Report, 2010, 1-46.
  33. Song, S.S., J.W. Park, and H.S. Park, "A Study on the Expected Effect of the PMO functions on Nuclear Power Plant Construction Project Performance", Corporate Management Research, Vol.21, No.5, 2014, 105-125. (송삼숙, 박종우, 박흥석, "PMO 기능이 원전건설 프로젝트 성과에 미치는 기대효과에 관한 연구", 기업경영연구, Vol.21, No.5, 2014, 105-125.)
  34. Wateridge, J., "IT Projects : A Basis for Success", International Journal of Project Management, Vol.13, No.3, 1995, 169-172. https://doi.org/10.1016/0263-7863(95)00020-Q
  35. World Bank, "ICT for Greater Development Impact : WorldBank Group Strategy for Information and Communication Technology 2012-2015", 2012.
  36. Yoo, J.H., Y.M. Kwon, and Y.S. Yi, "The Feasibility Study of Outsourcing in Korea SI Industry : Comparision between India and China case", Journal of the Korea Society of IT Services, Vol.4, No.2, 2005, 135-143. (유진호, 권용민, 이윤성, "한국 SI 산업의 Offshore 아웃소싱 가능성 검토 : 인도/중국 사례 비교", 한국IT서비스학회지, 제4권, 제2호, 2005, 135-143.)