Analysis of Gas Turbine Competitiveness and Adequacy of Electricity Market Signal in Korea

한국 전력시장에서의 가스터빈(GT) 발전기 경쟁력 및 시장 미진입 적정성 분석

  • Kim, Eun Hwan (Dept. of Electrical Engineering, Konkuk University) ;
  • Park, Yong-Gi (Dept. of Electrical Engineering, Konkuk University) ;
  • Park, Jong-Bae (Dept. of Electrical Engineering, Konkuk University) ;
  • Roh, Jae Hyung (Dept. of Electrical Engineering, Konkuk University)
  • Received : 2017.03.12
  • Accepted : 2017.06.19
  • Published : 2017.08.01

Abstract

This study analyzed competition in peak load plants between CCGT and GT instead of competition between base and peak load plants like in previous studies. In common overseas power markets, CCGT and GT claim certain market shares as peak load plants with the latter boasting a high utilization rate as reserve plants. In South Korea, however, there has been no introduction of GT in the market that opened in 2001 with no analysis cases of GT's economy as a peak load plant. The current power market of South Korea is run on the cost-based pool, which allows for no price spikes. Since the capacity payment criteria for compensations for missing money are set based on GT generators, the power market uses GT generators as marginal plants. The purposes of this study were to analyze the competitive edge of GT generators as peak load plants in the domestic power market of South Korea and identify the causes of GT's failure in market entry, thus assessing the adequacy of market signals in the domestic power market.

Keywords

References

  1. Stoft. S., "Power System Economics", IEEE Press & Wiley Interscience.
  2. Keong Seob Moon, "Alternatives and Improvements of the Trading Mechanism in Korean Electricity Market", Ph.D Thesis, Konkuk University 2015.
  3. Korea Power Exchange, "Generation Capacity Statistics", 2001-2016.
  4. Suil Lee, "Korean Systems for Achieving Resource Adequacy in Electric Power Industry", KDI 2013.
  5. Young San Kim, "Feasibility Study of Capacity Market in CBP", Korea Industrial Organization Society : Korea Power Exchange, 2014.
  6. Daniel S. Kirschen & Goran Ttrbac., "Fundamentals of Power System Economics", John Wiley & Sons, 2004.
  7. Se-Hwan Jang, "Generation Mix Analysis based on the Screening Curve and WASP-IV Techniques", the Transactions of KIEE Vol. 61. No. 4 2012.
  8. Ministry of Trade, Industry and Energy, "The 1st(-7th) Basic Plan of Electricity Supply and Demand", 2002-2015.
  9. Korea Power Exchange, "Korean Electricity Market Rule", 2017.
  10. Dae Wook Kim, "Capacity Payments Redesign and the Introduction of a Capacity Market in the Korean Electricity Market", Korea Industrial Organization Institute : Korea Power Exchange, 2014.
  11. The Brattle Group, "Cost of New Entry Estimates for Combustion Turbine and Combined Cycle Plants in PJM", 2011.
  12. Korea Power Exchange, "Power Planning and Economic Analysis", 2005.
  13. OECD/NEA, "Projected Cost of Generating Electricity", 2016.
  14. Korea Power Exchange, "Electricity Market Statistics", 2002-2016.
  15. H. G. Stoll, "Least Cost Electric Utility Planning", John Wiley & Sons 1988.
  16. IAEA, "Introduction to the WASP-IV Model User's Manual", 2001.