An Analysis on the Delay Influence Factors in Apartment Construction Site and Its Improvement Measures

공동주택 건설현장의 공기지연 영향요인 분석 및 개선방안

  • Received : 2017.07.05
  • Accepted : 2017.08.03
  • Published : 2017.09.30

Abstract

In the past, construction works were carried out by a generalized construction method. However, recently, as construction scale becomes high-rising and bigger, new technologies/new construction methods are being applied, and as legal regulations are expanded, construction delays are being frequently caused due to various uncertainties. Thus, in order to seek a methodology to cope efficiently with the schedule delays in construction of apartments, this study derived various influence factors of the schedule delays in apartment construction sites by responsibility group using a Delphi technique, and analyzed the importance of each influence factor through AHP technique to suggest the causes of occurrences and an improvement plan of major influence factors which urgently need to be improved by responsibility group in the future. In the future, a follow-up study is needed to expand the analysis object to general buildings, public works, etc. and compare analyze the causes of occurrence and improvement plans of construction schedule delays from various angles on all the responsibility groups who engage in construction works.

Keywords

References

  1. Cho, T. J., & Choi, J. S. (2011). Case Studies : Schedule Delay Factors and Delay Prevention Program for Concrete Frame Work in Apartment Construction Project, Journal of the Korea Institute of Building Construction, 11(1), 9-17 https://doi.org/10.5345/JKIC.2011.02.1.009
  2. Lee, J. S. (2007). Delay Analysis Using Linear Schedule in Construction, Journal of the Architectural Institute of Korea, Structure & Construction Section, 23(8), 213-20
  3. Lee, K. J., & Kim, Y. S. (2010). An Importance Analysis for the Major Schedule Management Factors Classified by Construction Participants in High-rise Building Reinforced Concrete Work, Journal of the Architectural Institute of Korea, Structure & Construction Section, 26(12), 185-92
  4. Lee, J. H., Kim, H. S., Park, H. S., & Kim, Y. S. (2000). A model for Construction Delay Claim Analysis Based on Internet, Journal of the Architectural Institute of Korea, Structure & Construction Section, 20(1), 423-26
  5. Kim. D. J., Kim, K. H, Lee, K. H., Lee, J. S., & Lee, H. S. (1999). Analyzing the Impacts of Delay on a Schedule in Construction Project, Journal of the Architectural Institute of Korea, Structure & Construction Section, 15(9), 113-22
  6. Kim, E. J., Kim, J. H., Lee, J. H., & Huh, Y. K. (2016). Analysis of Different Perception on the Importance of Construction Schedule Delay Factors by Participants in Apartment Construction Projects, Journal of the Architectural Institute of Korea, Structure & Construction Section, 18(3), 165-72
  7. Kim, J. H. (1999). A Construction Delay Claim Analysis Procedure, Thesis, Chung-Ang University.
  8. Ko, S. S. (2007). A Study Evaluation of Influence Factors about the Construction Delay FMEA in Apartment Housing, Thesis, Hanyang University.
  9. Kwon, J. H. (2008). Development for Analysis System of Delayed Duration for Construction Project, Thesis, Gyeongsang National University.
  10. Park, C. W., & Yun, S. H. (2009). A Case Study on Reason Analysis for Schedule Delay of Apartment House, Journal of the Korea Institute of Building Construction, 9(1), 89-94 https://doi.org/10.5345/JKIC.2009.9.1.089
  11. Han, J. K. (2003). An Analysis on Delay Factors of Major Trades in Apartment Housing Project, Thesis, Sungkyunkwan University.
  12. Han, J. K., Chin, S. Y., & Kim, Y. S. (2003). An Analysis on Delay Factors of Major Trades in Apartment Housing Project, Journal of the Architectural Institute of Korea, Structure & Construction Section, 19(3), 163-70