DOI QR코드

DOI QR Code

An Implement of Vision based Measurement Technology for Traction Power System up to 250 km/h

250 km/h급 전철설비의 비전기반 검측 기술 구현

  • Park, Young-Sig (Dept. of Railway System Engineering, Woosong University) ;
  • Na, Kyung-Min (Dept. of Railway System Engineering, University of Science & Technology) ;
  • Park, Young (Dept. of Railway System Engineering, University of Science & Technology)
  • Received : 2018.05.04
  • Accepted : 2018.06.20
  • Published : 2018.07.01

Abstract

The traction power system is configured to transmit electricity to the vehicles through mechanical contact between the OCL (Overhead Contact Line) and the pantograph. The system measures the current collection performance of the OCL, or the OCL installation condition is examined through maintenance for commercial operation. Maintenance continues to check the conditions through visual inspection by walking and inspection vehicles. The current collection performance is divided into the percentage of arcing(%), the contact force, and the uplift. The percentage of arcing is composed of a vision based system and used to verify the performance of a new OCL. However, it is not always possible to measure the current collection performance during commercial operation, and maintenance based on human resources can not be replaced. This paper presents the minimum performance condition of video devices in the current collection system of commercial vehicles. In addition, a continuous arcing was measured, and current collection performance was examined on the traction power system at the 250 km/h. It was analyzed with a minimum duration of arc of 1 ms. The frame rate is then shown by comparing the number of frames in the image at the time intervals of the number of the arcing. It is expected that the result of this study can be used for examining the minimum performance of video devices depending on their purpose.

Keywords

References

  1. S. Y. Oh, S. H, Park, Y. Park, H. Y. Cho, J. T, Song, "Analysis of dynamic/electric characteristic assessment system implementation technology for overhead contact lines", Fall conference of the Korean Society for Railway, pp. 1174-1179, 2009.
  2. Y. Park, K. Lee, S. Y. Park, J. Y. Park, W. S. Choi, "Implementation of Multi-functional Type Condition Monitoring System for Railway Catenary Systems", The Transactions of the Korean Institute of Electrical Engineers, vol. 64, no. 9 pp. 1406-1410, 2015. https://doi.org/10.5370/KIEE.2015.64.9.1406
  3. Y. Park, S. K. Shin, K. Lee, J. Kim, W. Kim, "Analysis of Current Collection Performance using Real-time Measurement of Current for Overhead Contact Line on the Track-side", The Transactions of the Korean Institute of Electrical Engineers, vol. 62, no. 4, pp. 573-576, 2013. https://doi.org/10.5370/KIEE.2013.62.4.573
  4. H. J. Park, Y. Park, H. S. Jung, H. C. Kim, "A Comparative Study on the Railway Electricity Maintenance Management", Fall conference of the Korean Society for Railway, pp. 1202-1207, 2011.
  5. Gao S.B, Liu Z, G. Yu L, "Detection and Monitoring System of the Pantograph-Catenary in High-speed Railway (6C)", International Conference on Power Electronic System and Application, pp. 1-7, 2017. 12.
  6. K. S. Yoo, C. H. Lee, G. Y. An, J. T. Kim, "Investigation of Effective Maintenance System for the Infra on the Conventional Line Prepared for the Tilting Train Service", Fall conference of the Korean Society for Railway, pp. 79-87, 2008.
  7. G. H. Jang, (2015), "A study on the Optimization for Automatic Inspection System of Catenary", Ph.D. Thesis, Woosong University, Daejeon, Republic of Korea, 151 pages.
  8. S. G. Song, "Development of Catenary Stagger and Height Measurement System using Laser", The Transactions of the Korean Institute of Electrical Engineers, vol. 11, no. 6, pp. 569-574, 2008. 12.
  9. KRTS-VE-Part1-2016(R1), Minister of Land, Infrastructure and Transport, 2016.
  10. Y. Park, K. Lee, S. Y. Kwon, C. M. Park, J. K. Kim, W. S. Choi, "Analysis of Percentage of Arcing between Pantograph and Overhead Contact Line as a Function of Duration of Arc", The Transactions of the Korean Institute of Electrical Engineers, vol. 63, no. 6 pp. 855-859, 2014.6. https://doi.org/10.5370/KIEE.2014.63.6.855
  11. Y. M. Gimm, Y. J. ju, J. S. Yoo, B. C. Koo "Measurement of EMI by High-Speed Train System", Spring Conference of the Korean Society for Railway, pp. 1157-1162, 2008. 11.
  12. IEC 62486:2010, "International Standard, Railway applications-Current collection systems-Technical criteria for the interaction between pantograph and overhead line", 2010.
  13. Y. Park, Y. H. Cho, S. Y. Kwon, K. W. Lee, W. You, "Development of an Arc Detector Assessment System by Loss of Contact Between Pantograph and Contact Wire in Electric Railway", The Transactions of the Korean Institute of Electrical Engineers, vol. 60, no. 11, pp. 2171-2175, 2011. https://doi.org/10.5370/KIEE.2011.60.11.2171
  14. K. M. Na, Y. Park, Y. H. Cho, S. Y. Kwon, K. Lee, W. You, "Analysis of Current Collect Performance Depending on Installation Condition of Overhead Contact Line in Suseo High Speed Line", The Transactions of the Korean Institute of Electrical Engineers, vol. 66, no. 4, pp. 727-732, 2017. 04. https://doi.org/10.5370/KIEE.2017.66.4.727
  15. UIC799-2002 Characteristics of a.c. overhead contact systems for high-speed lines worked at speeds of over 200 km/h. 2002