DOI QR코드

DOI QR Code

Development and Simulation Verification of Operation System for Mobile ESS Test Equipment

ESS 이동형 시험장비용 운영시스템의 개발과 모의검증

  • Shin, Je-Seok (Korea Electric Power Corporation Research Institute) ;
  • Han, Hyun-Gyu (Korea Electric Power Corporation Research Institute) ;
  • Kim, Jin-Tae (Korea Electric Power Corporation Research Institute) ;
  • Lee, Seung-Min (Dept. of Electrical, Electronics and Communication Engineering Education, Chung-Nam National University) ;
  • Park, Chan-Wook (Dept. of Electrical, Electronics and Communication Engineering Education, Chung-Nam National University) ;
  • Lim, Geon-Pyo (Korea Electric Power Corporation Research Institute)
  • Received : 2018.07.23
  • Accepted : 2018.08.29
  • Published : 2018.09.01

Abstract

The performance test for 376MW ESS for frequency regulation currently operating in 13 substations is conducted based on the test procedure in the first and second steps. In the first step, components of ESS is moved to the certification authority where the test equipment is located in order to be proceeded with the test. In the second step, the performance test is conducted manually for the ESS equipments installed on site using the movable measurement equipment, and thus it can only be performed on some limited test items and requires a lot of time and manpower. Therefore, mobile test equipment for ESS(MOTES) is being developed that can perform automatically more test items for ESS in the field using the MOTES, and reduce manpower and time. To do this, an algorithm and a prototype of the operating system(MOS) are also being developed that can control MOTES automatically. In this paper, a development of the MOS prototype is introduced and then a simulation is performed to verify the prototype and its algorithm before the field demonstration.

Keywords

References

  1. G. Lim, Y. Han, S. Lee, C. Wook, "Development and Demonstration of Trial-run Auotmation System of Energy Storage System for Frequency Regulation," The Transactions of the Korean Institute of Electrical Engineers(KIEE), vol. 66(P), no. 3, pp. 110-116, September, 2017.
  2. J. Shin, H. Han, J. Kim, H. Woo, G. Lim, "Development of Initial prototype of Operation System for Mobile ESS Test Equipment," 49th KIEE Summer Conf., July, 2018.
  3. M. Kang, S. Choi, J. Park, Y. Nam, E. Kim, D. Rho, "A Study on the Modeling Method of Performance Evaluation System for MW Scaled Energy Storage System Using the PSCAD/EMTDC," KIEE, vol. 66(P), no. 6, pp. 885-891, June, 2017.
  4. Eung Sang Kim, "A Construction Trend of the World's Largest Capacity Storage System Performance Testing Facility," KIEE, vol. 67, no. 1, pp. 12-15, January, 2018.