Improvement of Quantity Take-Off and BoQ through the LOD Criteria Analysis of BIM Models

BIM 모델 표현 수준(LOD) 분석을 통한 내역체계 개선방안 연구

  • Choi, Hyunjun (Department of Architectural Engineering, ERI, Gyeonsang National University) ;
  • Yun, Seokheon (Department of Architectural Engineering, Gyeongsang National University)
  • Received : 2019.09.06
  • Accepted : 2019.10.25
  • Published : 2019.11.30

Abstract

Recently, BIM has been actively introduced in construction projects. In particular, the introduction of BIM in cost estimating process is expected to improve the accuracy and efficiency of the cost estimate. However, the quantity calculation and BoQ documents preparation process still require manual work. Although the BIM model may support quantification process, it is still problematic that the level of detail of the model must be very detailed to meet the items in BoQ. To address this, it is necessary to analyse the LOD criteria and to analyze the extent to which quantity can be computed according to the level of detail in the BIM model. For the analysis of LOD-based work items, the work item grades were divided into A,B, and C. In this study, the ratio and cost of each item that can be calculated at the LOD level in the detailed design phase are reviewed for each type of work, and the method for improving the quantity calculation using BIM is proposed. In the LOD 300 stage(Detailed design stage), the largest number of items in the class B, the major improvement class, are window and glass work. In addition, the most expensive type of work was analyzed by reinforced concrete work. In the future, it is necessary to suggest appropriate improvement way for items with high item ratios and items with high cost ratios. The results of this study are expected to be used as a BIM-based cost estimation or as basic data for improving the current BoQ system.

최근 건설프로젝트에서 BIM의 도입이 활발히 이루어지고 있다. 특히 견적단계에서의 BIM의 도입은 공사비 예측의 정확성 향상 및 견적자의 업무를 절감할 수 있는 효과가 기대된다. 하지만 현재의 물량산출 과정과 내역서 작성과정은 상당부분 수작업으로 이루어지고 있다. 또 현행 내역서의 내역항목을 만족시키기 위해서는 BIM 모델이 매우 상세해져야 하는 문제점이 있다. 이에 본 연구는 LOD기준을 분석하여 BIM 모델의 표현 수준에 따라 산출될 수 있는 내역항목을 도출함으로써 현행 내역서의 개선방향을 BIM 모델의 LOD 측면에서 도모하고자 한다. LOD기반 내역항목 분석을 위해 내역항목 등급을 A,B,C등급으로 나누었다. 따라서 본 연구에서는 실시설계 단계에서 LOD 수준 따라 산출될 수 있는 내역항목의 수와 해당항목이 차지하는 금액 비율을 각 공종별로 검토하였다. 실시설계 단계에서 주요 개선 등급인 B등급에서 가장 많은 항목을 차지한 공종은 창호 및 유리공사이며, 가장 많은 금액을 차지한 공종은 철근콘크리트 공사로 분석되었다. 추후 항목비율이 높은항목과 금액비율이 높은항목별 적절한 개선방안제시가 필요할 것으로 판단된다. 본 연구의 결과는 BIM 견적이나 현행 내역서 체계 개선을 위한 기초자료로서의 역할을 기대 할 수 있을 것으로 판단된다.

Keywords

References

  1. An, J.W., and Yun, S.H. (2017). "Improvement of BoQ Document for the BIM based Quantity Takeoff." Journal of KIBIM, 7(4), pp. 16-24.
  2. Lee, C.H., Kim, S.A., and Chin, S.Y. (2011). "An Index for Measuring the Degree of Completeness of BIM-based Quantity Take-Off." Korean Journal of Construction Engineering and Management, KICEM, 12(6), pp. 79-92. https://doi.org/10.6106/KJCEM.2011.12.6.79
  3. Noh, H.R. (2017). "A Case Study on the Educational Facility Project for the Improvement of Work Item's Structure in BoQ." Master's thesis, Gyeongsang National University, Korea.
  4. Bae, K.I., and Jun, H.J. (2011). "A Case Study on LOD(Level of Development) studies for BIM Model." Design Convergence Study, Society of Design Convergence, 10(5). pp. 31-43.
  5. Song, A.R., Kang, K.S., and Yun, S.H. (2015). "Improvement of Quantity Take-Off and BoQ Information through the PBS based QDB System." Journal of the Architectural Institute of Korea Structure & Construction, 31(2), pp. 73-80. https://doi.org/10.5659/JAIK_SC.2015.31.2.73
  6. Noh, H.R., Kim, J.Y., Lee, D.U., and Yun, S.H. (2016). "A Study for the Optional Expression Level of Definition of BIM Model in Construction Phase" Korean Journal of Computational Design and Engineering, 21(4), pp. 378-388. https://doi.org/10.7315/CDE.2016.378
  7. Joo, S.W., Kim, C.K., Kim, S.U., and Noh, J.O. (2017). "BIM-Based Quantity Takeoff and Cost Estimation Guidelines for Reinforced Concrete Structures." Journal of the Computational Structural Engineering Institute of Korea, 30(6), pp. 567-576. https://doi.org/10.7734/COSEIK.2017.30.6.567
  8. Aryani, A.L., Juliana, B., Suzila, M., and Mohamad, S.F. (2015). "Building Information Modeling(BIM): Exploring Level of Development (LOD) in Construction Project." Applied Mechanics and Materials, 773-774, pp. 933-937. https://doi.org/10.4028/www.scientific.net/AMM.773-774.933
  9. Olsen, D., and Mark Taylor, J. (2017). "Quantity Take-Off Using Building Information Modeling (BIM), and Its Limiting Factors." Procedia Engineering, 196, pp. 1098-1105. https://doi.org/10.1016/j.proeng.2017.08.067
  10. The Korean Public Procurement Service (2017). BIM Guideline for the Facility Project.
  11. The US Chapter of Building SMART International (2018). Level of Development (LOD) Specification Part 1 & Commentary For Building Information Models and Data.
  12. The American Institute of Architects (2008). AIA Document $E202^{TM}$-2008.