Effective Handling of Construction Disputes for Strengthening the International Competitiveness of the Construction Industry

건설산업 국제경쟁력강화를 위한 건설분쟁처리절차 개선방안

  • Cho, Youngjun (School of Architect and Civil Engineer, Joongbu University)
  • 조영준 (중부대학교 건축토목공학부)
  • Received : 2019.09.02
  • Accepted : 2019.10.08
  • Published : 2020.07.31

Abstract

Problems related to construction contracts arise if they are not reflected in the design phase from the planning phase of the construction project, or if they are not properly dealt with despite various changes in the construction phase. So far, there have been a number of discussions in Korea regarding the improvement of the procedures for resolving construction disputes, and the problems related to the procedures for solving construction disputes have been raised steadily, but the problems related to the procedures for solving construction disputes are still unresolved. Therefore, in this study, the followings were proposed to strengthen the international competitiveness of the construction industry. First, the so-called Construction Dispute Mediation Act should be enacted to prepare the basis for the establishment of a tentatively named Construction Dispute Mediation and Arbitration Agency(CDMA). Second, the work of the CDMA should be limited to the work of supporting the DRB, mediation and Arbitration the private and public sectors. Third, it is required to choose between adjustment and arbitration when obtaining a contract and to operate the DRB during construction phase. Fourth, CDMA should be established as standing bodies, and branches should be operated in various parts of the country. Fifth, construction experts from various areas should be included as members so that disputes over construction contracts can be dealt with quickly. And finally, relevant laws that specify the procedures for dealing with construction disputes should be amended together.

건설사업의 기획단계부터 설계단계에 미처 반영되지 못해 문제가 잠재되거나, 공사계약이행단계에서 다양한 변경요인이 있음에도 제대로 대처하지 못할 경우 건설계약과 관련하여 문제가 발생하게 된다. 그러므로 건설공사계약에는 반드시 분쟁의 해결절차를 명시하고 있다. 건설분쟁은 공공공사와 같이 대규모 건설현장 뿐만 아니라 소규모 민간건설현장에서도 발생되고 있다. 지금까지 우리나라에서는 건설분쟁의 해결절차개선과 관련하여 다수의 논의가 있었으나 건설분쟁해결절차와 관련된 문제가 근본적으로 해결되지 못하였다. 따라서 본 연구에서는 다음과 같은 사항을 제시하였다. 첫째, 가칭 건설분쟁조정법률을 제정하여 건설계약분쟁을 다룰 수 있는 가칭 건설분쟁조정중재원의 설립근거를 마련하고, 조정, 중재 등의 업무를 다루도록 해야 한다. 둘째, 민간 및 공공부문의 건설계약분쟁을 담당할 수 있도록 가칭 건설분쟁조정중재원의 업무는 현장협의체지원, 조정, 중재 등의 업무로 한정해야 한다. 셋째, 건설계약분쟁해결을 위해 계약체결시 조정이나 중재중 선택하도록 하고, 계약이행중에는 현장협의체를 운용하도록 해야 한다. 넷째, 분쟁처리기구는 상설기구로 하고, 전국 각지에 지부를 운영해야 한다. 다섯째, 다양한 영역의 건설전문가들을 위원으로 참여시켜 신속하게 건설계약분쟁이 처리될 수 있도록 해야 한다. 마지막으로, 건설계약분쟁처리기구의 단일화와 함께 건설분쟁처리절차를 명시하고 있는 관련법령을 개정해야 한다.

Keywords

References

  1. Cho, Y.J., Kim, Y.S., and Han, K.Y. (1994). "A Study on the Prevention of Construction Claims and Disputes." KICT-94-CM-111, Korea Institute of Construction Technology, pp. 86-91.
  2. Cho, Y.J., Koo, J.H., Lee, K.S., and Koo, J.D. (1995). "A Study on the Prevention of Construction Claims and Disputes(II)" KICT-95-CM-112-41, Korea Institute of Construction Technology, pp. 37-59.
  3. The National Court Administration. (2002-2017). "Chapter 5 of Judicial Almanac 2002-2017" Supreme Court, Spp. 724-803.
  4. Doo, S.K. (2002). "Improvement Procedure of Dispute Resolution Clause of General Conditions of Construction Contract." Construction & Economy Research Institute of Korea, pp. 15-20.
  5. Jung, H.H. (2019). "Last year, a total of 280 applications from the CSDMC were filed." Seoul: updated 2019 Jan. 30. Available from: http://www.cnews.co.kr/
  6. Kim, J.S., and Lee, J.S. (2005). "Improvement Plan for Domestic Construction Claims & Dispute Resolution Process - Focused on the Construction Bond." Korean Journal of Construction Engineering and Management, KICEM, 6(4), pp. 181-189.
  7. Ministry of Small and Medium Venture Business No. 2017-28. (2017). Detailed Rules for Mediation and arbitration of technical disputes between small and medium-sized enterprises.
  8. Park, Y.H. (2017). "Cost Saving Technique(15)- Necessity to actively utilize subcontracting dispute arbitration bodies." Seoul: updated 2017 Jul. 3; cited 2019 Jul. 11. Available from: http://www.koscaj.com.
  9. Kim, D.S., Cho, Y.J., Hyun, C.T., and Hong, T.H. (2008a). "A Study on the Structure of the Indirect Field Negotiation System for Effective Dispute Resolution at Contract Administration Stage." Journal of the Architectural Institute of Korea Structure & Construction, AIK, 24(9), pp. 131-139.
  10. Kim, D.S., Cho, Y.J., Hyun, C.T., and Hong, T.H. (2008b). "A Study on the Neutrality of the Members of the Indirect Field Negotiation Tool." Journal of the Regional Association of Architectural Institute of Korea , AIKRA, 10(3), pp. 249-257.
  11. KOFAIR. (2019). "Korea Fair Trade Adjustment Agency handled 3,631 cases of dispute settlement in 2018." Seoul: Updated 2019 Jan. 25. Available from: https://kftc.tistory.com/11302