DOI QR코드

DOI QR Code

Assessing the Potential of Small Modular Reactors (SMRs) in Spent Nuclear Fuel Management: A Review of the Generation IV Reactor Progress

  • Received : 2023.07.19
  • Accepted : 2023.09.20
  • Published : 2023.12.30

Abstract

The initial development plans for the six reactor designs, soon after the release of Generation IV International Forum (GIF) TRM in 2002, were characterized by high ambition [1]. Specifically, the sodium-cooled fast reactor (SFR) and very-high temperature reactor (VHTR) gained significant attention and were expected to reach the validation stage by the 2020s, with commercial viability projected for the 2030s. However, these projections have been unrealized because of various factors. The development of reactor designs by the GIF was supposed to be influenced by events such as the 2008 global financial crisis, 2011 Fukushima accident [2, 3], discovery of extensive shale oil reserves in the United States, and overly ambitious technological targets. Consequently, the momentum for VHTR development reduced significantly. In this context, the aims of this study were to compare and analyze the development progress of the six Gen IV reactor designs over the past 20 years, based on the GIF roadmaps published in 2002 and 2014. The primary focus was to examine the prospects for the reactor designs in relation to spent nuclear fuel burning in conjunction with small modular reactor (SMR), including molten salt reactor (MSR), which is expected to have spent nuclear fuel management potential.

Keywords

References

  1. U.S. Department of Energy, A Technology Roadmap for Generation IV Nuclear Energy Systems, GIF-002-00 (2002). 
  2. 24th Japan Atomic Energy Commission, Government Policy Concerning Monju Fast Reactor, Japan (2016). 
  3. Agency for Natural Resources and Energy, Japanese Fast Breeder Reactor Phases and Roles, Japan (2016). 
  4. OECD Nuclear Energy Agency, 2008 GIF Annual Report (2009). 
  5. OECD Nuclear Energy Agency, A Technology Roadmap Update for Generation IV Nuclear Energy Systems (2014). 
  6. OECD Nuclear Energy Agency, GIF System Research Plan for the LFR (2014). 
  7. International Atomic Energy Agency. September 22 2021. "IAEA Presents New Platform on Small Modular Reactors and Their Applications." IAEA homepage. Accessed Jun. 20 2023. Available from: https://www.iaea.org/newscenter/news/iaea-presents-new-platform-on-small-modular-reactors-and-their-applications. 
  8. J.E. Kelly, International Perspective on the Future of Nuclear Power ICON-13, U.S. Department of Energy (2015). 
  9. International Atomic Energy Agency, Technology Roadmap for Small Modular Reactor Deployment, IAEA Nuclear Energy Series No. NR-T-1.18 (2021). 
  10. International Atomic Energy Agency, Advances in Small Modular Reactor Technology Developments, A Supplement to: IAEA Advanced Reactors Information System (ARIS), 2020 Ed. (2020). 
  11. Y.J. Lee, "Proliferation Resistance Features for MSR Using 233U-232Th Fuel Cycle", Transactions of the Korean Nuclear Society Autumn Meeting, October 19-21, 2022, Changwon, Korea. 
  12. European Commission, Commission Delegated Regulation (EU) 2022/1214 of March 9 2022 amending Delegated Regulation (EU) 2021/2139 as Regards Economic Activities in Certain Energy Sectors and Delegated Regulation (EU) 2021/2178 as Regards Specific Public Disclosures for Those Economic Activities, July 2022. 
  13. OECD Nuclear Energy Agency. January 16 2019. "Framework Agreement-GIF Framework Agreement Extended for Ten Years." GIF Portal. Accessed Jun. 20 2023. Available from: https://www.gen-4.org/gif/jcms/c_9342/framework-agreement. 
  14. OECD Nuclear Energy Agency, The NEA Small Modular Reactor Dashboard, NEA No. 7050 (2023).