Research on dynamic response of orthogonal tunnel lining under earthquake

  • Chen Yang (School of Civil Engineering, Sichuan University Jinjiang College) ;
  • Zelin Lu (School of Civil Engineering, Qingdao University of Technology) ;
  • Yinwen Wang (School of Civil Engineering, Qingdao University of Technology)
  • 투고 : 2023.11.04
  • 심사 : 2024.10.20
  • 발행 : 2024.12.25

초록

Relying on the metro line 4 interval tunnel in Chongqing, the dynamic response of orthogonal tunnels at different locations under the influence of horizontal seismic wave sat different time intervals are studied with an earthquake of intensity VIII. By analysis the ANSYS numerical model simulation results and actual monitoring results, the following conclusions can be derive. (1) The lining stress change shows a positive parabolic phenomenon, and the optimal spacing of the upper and lower tunnels can be derived from the stress change as 1.5 times the hole diameter. (2) By studying the displacement values of the monitoring points in the orthogonal tunnel with different spacing between the upper and lower tunnels, it can be seen that the displacement in the horizontal direction of each monitoring point is significantly larger than that in the vertical direction, which leads to the conclusion that the seismic wave in the horizontal direction has a greater effect on the horizontal direction of the tunnel lining. (3) The upper tunnel is most affected by seismic waves at the arch top, followed by the arch waist and the arch foot, and finally the arch bottom. (4) The peak of horizontal displacement in the orthogonal tunnel under the action of horizontal seismic waves is 20 m from the portal of the upper tunnel, rather than the orthogonal part. The research results can provide a helpful manual for the design and construction of orthogonal tunnels in earthquake areas.

키워드

과제정보

The APC was funded by Sichuan University Jinjiang College. We thank Professor Gao Feng (Chongqing Jiaotong University) for providing project support, and Dr. Guangzhao Zhang (Qingdao University of Technology) for proofreading the language of this paper.

참고문헌

  1. Bi, R., Tang, X. and Liu, B. (2016), “Three-dimensional seismic response analysis of a shield-shaped subway tunnel”, Geol. Explor., 52, 712-717. https://doi.org/10.13712/j.cnki.dzykt.2016.04.012.
  2. Chen, L., Chen, G.X. and Long, H. (2010), “3D refined nonlinear finite element analysis of intersecting metro tunnels under near field ground motion”, Rock Soil Mech., 31, 280-285.
  3. Ding, L.X., Shao, G.B., Shang, J.H. and Han, J.Y. (2023), “Study on transverse seismic response characteristics of large diameter vertical double-layer overlapping pipe jacking in the soil-rock composite stratum”, Appl. Sci. Basel, 13, 14. https://doi.org/10.3390/app13042343.
  4. Editorial Department of China Journal of Highway and Transport (2022), “Review on China’s traffic tunnel engineering research: 2022”, Chin. J. Highw. Transp., 35(4), 1-40. https://doi.org/10.19721/j.cnki.1001-7372.2022.04.001.
  5. Fang, Q., Zhang, D., Li, Q. and Wong, L.N.Y. (2015), “Effects of twin tunnels construction beneath existing shield-driven twin tunnels”, Tunnell. Undergr. Sp. Technol., 45, 128-137. https://doi.org/10.1016/j.tust.2014.10.001.
  6. Fu, D. and Gu, Y. (2019), “Research on seismic response of mountain tunnel considering soil-structure dynamic interaction”, J. Guangxi Univ. (Nat. Sci. Edit.), 44, 176-182. https://doi.org/10.13624/j.cnki.issn.1001-7445.2019.0176.
  7. Fu, X., Zhu, Q., Liu, C., Li, N.W., Zhuang, W.H., Yang, Z.L., Lu, H. and Tang, M. (2020), “Estimation of landslides and road capacity after August 8, 2017, MS7.0 Jiuzhaigou earthquake using high-resolution remote sensing images”, Adv. Civil Eng., 2020, 11. https://doi.org/10.1155/2020/8828385.
  8. GB 50909-2014 (2014), Code for Seismic Design of Urban Rail Transit Structures, Ministry of Housing and Urban-Rural Development of the People’s Republic of China, Beijing, China.
  9. Jiang, X., Wang, F., Yang, H., Sun, G. and Niu, J. (2018), “Dynamic response of shallow-buried small spacing tunnel with asymmetrical pressure: Shaking table testing and numerical simulation”, Geotech. Geol. Eng., 36, 2037-2055. https://doi.org/10.1007/s10706-017-0444-0.
  10. Jishnu, R.B. and Ayothiraman, R. (2020), “Interaction of urban underground twin metro tunnels under static and earthquake loading”, J. Earthq. Tsunami, 14, 36. https://doi.org/10.1142/s1793431120500190.
  11. Li, J., Tao, L., Wu, B., An, J. and Guo, F. (2014), “Analysis of 3D dynamic response of closely overlapping tunnels during a strong earthquake”, Modern Tunnell. Technol., 51(1), 26-31.
  12. Li, X.G., Zhang, C.P. and Yuan, D.J. (2013), “An in-tunnel jacking above tunnel protection methodology for excavating a tunnel under a tunnel in service”, Tunnell. Undergr. Sp. Technol., 34, 22-37. https://doi.org/10.1016/j.tust.2012.10.004.
  13. Liu, S.F., Yao, L.Y., Feng, X.J. and Wang, P. (2023), “Response analysis of curved tunnel under near-field long-period ground motion considering seismic wave propagation effect”, Sustainab., 15, 14. https://doi.org/10.3390/su15010060.
  14. Maleska, T., Beben, D. and Nowacka, J. (2021), “Seismic vulnerability of a soil-steel composite tunnel - Norway Tolpinrud railway tunnel case study”, Tunnell. Undergr. Sp. Technol., 110, 18. https://doi.org/10.1016/j.tust.2020.103808.
  15. Mayoral, J.M. and Mosqueda, G. (2020), “Seismic interaction of tunnel-building systems on soft clay”, Soil Dyn. Earthq. Eng., 139, 13. https://doi.org/10.1016/j.soildyn.2020.106419.
  16. Ouyang, Z.Y., Cui, J., Luo, R.F. and Li, P.J. (2021), “Shaking table model test of immersed tunnels with different site conditions and seismic wave input directions”, Ships Offshore Struct., 16, 20-32. https://doi.org/10.1080/17445302.2020.1829372.
  17. Pai, L.F. and Wu, H.G. (2021), “Multi-attribute seismic data spectrum analysis of tunnel orthogonal underpass landslide shaking table test”, Soil Dyn. Earthq. Eng., 150, 17. https://doi.org/10.1016/j.soildyn.2021.106889.
  18. Panthi, K.K. and Basnet, C.B. (2019), “Evaluation of earthquake impact on magnitude of the minimum principal stress along a shotcrete lined pressure tunnel in Nepal”, J. Rock Mech. Geotech. Eng., 11, 920-934. https://doi.org/10.1016/j.jrmge.2019.06.003.
  19. Sun, B.B., Zhang, S.R., Cui, W., Deng, M.J. and Wang, C. (2020), “Nonlinear dynamic response and damage analysis of hydraulic arched tunnels subjected to P waves with arbitrary incoming angles”, Comput. Geotech., 118, 14. https://doi.org/10.1016/j.compgeo.2019.103358.
  20. Sun, B.T., Spencer, B.F., Yan, P.L., Chen, X.Z. and Zhang, G.X. (2022), “Analysis of the seismic vulnerability of buildings in the Lushan Ms 7.0 earthquake in the Sichuan Province of China”, J. Earthq. Eng., 26, 764-792. https://doi.org/10.1080/13632469.2019.1692742.
  21. Wang, W., Tao, L., Zhang, B., Li, W. and Wei, Y. (2010), “A new method for seismic active pressure calculation of the underground structure”, J. Disaster Prevent. Mitigat. Eng., 30, 620-623. https://doi.org/10.13409/j.cnki.jdpme.2010. 06.013.
  22. Wu, H.G., Lei, H. and Lai, T.W. (2021), “Shaking table tests for seismic response of orthogonal overlapped tunnel under horizontal seismic loading”, Adv. Civil Eng., 2021, 19. https://doi.org/10.1155/2021/6633535.
  23. Wu, W.W., Long, F., Liang, M.J., Wei, Y.L., Sun, W., Chen, X.F. and Zhao, J. (2020), “Spatial and temporal variations in earthquake stress drops between the 2008 Wenchuan and 2013 Lushan earthquakes”, Acta Geol. Sin. English Edit., 94, 1635-1650. https://doi.org/10.1111/1755-6724.14582.
  24. Yan, Q.X., Bao, R., Chen, H., Li, B.J., Chen, W.Y., Dai, Y.W. and Zhou, H.Y. (2019), “Dynamic response and waterproof property of tunnel segmental lining subjected to earthquake action”, Earthq. Struct., 17, 411-424. https://doi.org/10.12989/eas.2019.17.4.411.
  25. Yang, J., Chen, J.H., Liu, H.L. and Zheng, J.C. (2014), “Comparison of two large earthquakes in China: The 2008 Sichuan Wenchuan earthquake and the 2013 Sichuan Lushan earthquake”, Nat. Hazards, 73, 1127-1136. https://doi.org/10.1007/s11069-014-1121-8.
  26. Yang, T., Rao, Y.K., Wu, H.G., Zhang, J.Y., Lei, H. and Ding, H.J. (2021), “Dynamic response of parallel overlapped tunnel under seismic loading by shaking table tests”, Shock Vib., 2021, 15. https://doi.org/10.1155/2021/2535762.
  27. Zhang, B., Tao, L., Jia, F., Wang, W. and Li, W. (2011), “Analysis of response to horizontal earthquake loading for metro crossing tunnels with super closed distance apart”, Railw. Eng., 2011, 47-50.
  28. Zhang, J.H., Yuan, Y., Bao, Z., Yu, H.T. and Bilotta, E. (2019), “Shaking table tests on the intersection of cross passage and twin tunnels”, Soil Dyn. Earthq. Eng., 124, 136-150. https://doi.org/10.1016/j.soildyn.2019.05.035.
  29. Zhang, M.Z. and Jin, Y.J. (2008), “Building damage in Dujiangyan during Wenchuan earthquake”, Earthq. Eng. Eng. Vib., 7, 263-269. https://doi.org/10.1007/s11803-008-0870-3.
  30. Zlatanovic, E., Lukic, D.C., Prolovic, V., Bonic, Z. and Davidovic, N. (2015), “Comparative study on earthquake-induced soil tunnel structure interaction effects under good and poor soil conditions”, Eur. J. Environ. Civil Eng., 19, 1000-1014. https://doi.org/10.1080/19648189.2014.992548.