DOI QR코드

DOI QR Code

A Study on Information Collection and Idea Creation Using Drones

드론을 활용한 정보수집 및 아이디어 창출에 관한 연구

  • 조화니 (경남대학교 사회환경시스템공학과 ) ;
  • 유재원 (부산광역시 건설안전시험사업소) ;
  • 최현 (경남대학교 사회환경시스템공학과)
  • Received : 2023.11.16
  • Accepted : 2023.12.11
  • Published : 2024.02.01

Abstract

The objective of Value Engineering (VE) is to derive the optimal value at the most efficient life cycle cost, comprising three stages: Pre-Study, Study, and Post-Study. In this study, we propose a method for information collection and analysis during planned site visit surveys in the preparation stage of VE. The 3D spatial model, created using a drone, facilitated observation and analysis of the study area from various angles, both from the center and the outside. Additionally, through the utilization of drones, we conducted on-site investigations of the research area's 3D spatial model, enabling a macroscopic perspective previously only feasible through a microscopic viewpoint during planned site visits in the pre-study phase. Furthermore, the utilization of actual spatial data obtained from observations allowed for real-time information verification during Design VE workshops, enhancing the efficiency and reliability of the VE project.

가치공학(VE; Value Engineering)은 최적의 생애주기 비용으로 최상의 가치를 실현하는 것으로 준비단계(Pre-Study), 분석단계(Study), 실행단계(Post-Study) 3가지 단계로 구성된다. 본 연구에서는 VE 준비단계 중 현장방문 시 정보수집 및 분석을 위한 방법을 제안하고자 한다. 드론을 활용하여 생성된 3차원 공간모델은 연구 대상지를 중심에서 또는 외부에서 다양한 각도로 관찰 및 분석을 할 수 있었다. 준비단계부터 현장 방문 시 미시적 관점에서만 가능했던 현장조사는 드론을 활용함으로써 연구 대상지역의 3차원 공간모델링으로 거시적인 관점에서 검토가 가능하였으며, 실제 관측한 공간정보 데이터를 이용하여 설계 VE 워크숍 중에도 실시간으로 정보를 확인할 수 있어 효율적이고 신뢰성 있는 VE 수행을 할 수 있었다.

Keywords

Acknowledgement

This paper has been written by modifying and supplementing the KSCE 2023 CONVENTION paper.

References

  1. David, A. and Krishna, M. (2000). "Trends in productivity improvement in the US construction industry." Construction Management and Economics, Taylor & Francis, Vol. 18, No. 1, pp. 15-27, https://doi.org/10.1080/014461900370915.
  2. Imron, A. and Husin, A. E. (2021). "Value engineering and lifecycle cost analysis to improve cost performance in green hospital project." Archives of Civil Engineering, WARSAW University of Technology Faculty of Civil Engineering and Committee for Civil Engineering Polish Academy of Sciences, Vol. 67, No. 4, pp. 497-510, https://doi.org/10.24425/ace.2021.138514.
  3. Kang, L. S., Choi, H. L., Kim, C. H. and Lee, C. K. (2003). "The integrated model of value engineering and life cycle cost for the construction projects." KSCE Journal of Civil and Environmental Engineering Research, KSCE, Vol. 23, No. 5-D, pp. 649-659 (in Korean).
  4. Kim, S.-K., Heo, S.-S. and Choi, Y.-K. (2005). "Construction cost-down of building substructure by VE techniques." Korean Journal of Construction Engineering and Management, KICEM, Vol. 6, No. 1, pp. 125-132 (in Korean).
  5. Kim, H. and Park, Y. (2016). "Efficient problem-solving idea generation in the design phase VE of construction projects using business creativity codes(BCC)." Journal of the Korea Institute of Building Construction, KIC, Vol. 16, No. 4, pp. 367-379, https://doi.org/10.5345/JKIBC.2016.16.4.367 (in Korean).
  6. Kim, D., Song, Y., Kim, K. and Kim, C. (2014). "A study on the application of UAV for koreanland monitoring." Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography, KSGPC, Vol. 32, No. 1, pp. 29-38, https://doi.org/10.7848/ksgpc.2014.32.1.29 (in Korean).
  7. Korea Environment Corporation (2012). Design VE work manual, KECO2010-RE02-12, Korea Environment Corporation (in Korean).
  8. Lee, S.-K. (2006). "A study on the systematization schemes of the design VE for cost reduction of public constructions of Seoul." Seoul Studies, Seoul Institute, Vol. 7, No. 2, pp. 117-136, https://doi.org/10.23129/seouls.7.2.200606.117 (in Korean).
  9. Li, C., Chen, H. and Zhang, Y. (2010). "Value engineering cost control of sewage treatment engineering based on LCC in the cities of north China." Proceedings of 2010 International Conference on Logistics Systems and Intelligent Management (ICLSIM), IEEE, Harbin, China, pp. 292-296, https://doi.org/10.1109/ICLSIM.2010.5461419.
  10. Lim, J., Kim, S. and Lee, M. (2014). "Development of web-based VE supporting system for effective workshop." Korea Journal of Construction Engineering and Management, KICEM, Vol. 15, No. 2, pp. 71-78, https://doi.org/10.6106/KJCEM.2014.15.2.071 (in Korean).
  11. Park, H., Park, C. and Jung, W. (2014). "A study on the improvement of the design VE process using VE idea-databank system." Korean Journal of Construction Engineering and Management, KICEM, Vol. 15, No. 1, pp. 28-38, https://doi.org/10.6106/KJCEM.2014.15.1.028 (in Korean).
  12. Yun, B. and Lee, J. (2014). "A study on application of the UAV in korea for integrated operation with spatial information." The Journal of the Korean Society for Geospatial Information Science, KSIS, Vol. 22, No. 2, pp. 3-9, https://doi.org/10.7319/kogsis.2014.22.2.003 (in Korean).