DOI QR코드

DOI QR Code

Integrating standard data with DfMA and as-built digital BIMs for the prefabricated bridge

  • Gitae Roh (Department of Civil Engineering, Chung-Ang University) ;
  • Donghyun Kang (Department of Civil Engineering, Chung-Ang University) ;
  • Jaewook Park (Department of Civil Engineering, Chung-Ang University) ;
  • Chi-Ho Jeon (Korea Institute of Civil Engineering and Building Technology Department of Structural Engineering) ;
  • Nguyen Duy Cuong (Department of Civil Engineering, Chung-Ang University) ;
  • Changsu Shim (Department of Civil Engineering, Chung-Ang University)
  • 투고 : 2025.08.05
  • 심사 : 2026.07.09
  • 발행 : 2026.08.25

초록

Prefabrication is increasingly employed in bridge construction for its productivity, quality, and sustainability, and its success depends on the standardized management of data and models across the entire life cycle. While design for manufacturing and assembly (DfMA) has been combined with building information modeling (BIM) to address fabrication and assembly inaccuracies, such integration has often been confined to individual stages without connecting adjacent life-cycle phases or extending to maintenance. This study proposes a standard data and digital engineering model framework that links prefabricated bridge members from design through fabrication, assembly, and maintenance. Standard data defined from design calculations are mapped to rule-based digital model variables, so that inspection data acquired during fabrication and assembly are fed back for preassembly simulation. An as-built baseline model with member-level performance indicators is then established, through which maintenance-stage data can be returned to the design model. Applied to two highway bridges under construction, a DfMA-based design revision reduced the connector-pocket collision rate from 71.5% to 14.1% and shortened the average deck assembly delay from 8.7 to 3.8 d per span, providing a reliable baseline model for maintenance. The proposed approach extends DfMA-BIM integration into a life-cycle-wide data management framework for prefabricated PSC-I girder bridges.

키워드

과제정보

This research was supported by the "National R&D Project for Smart Construction Technology (No.RS-2020-KA156007)" funded by the Korea Agency for Infrastructure Technology Advancement under the Ministry of Land, Infrastructure and Transport, and managed by the Korea Expressway Corporation.

참고문헌

  1. Wolfe, R.W., Chung, P., Dermegerdician, A. (2007). Accelerating bridge construction—Precast abutment solutions, Phoenix, Arizona, USA.
  2. Hällmark, R., White, H., Collin, P. (2012). Prefabricated bridge construction across Europe and America. Practice Periodical on Structural Design and Construction, 17(3), 82-92. https://doi.org/10.1061/(ASCE)SC.1943-5576.00001.
  3. Khaleghi, B., Schultz, E., Seguirant, S., Marsh, L., Haraldsson, O., Eberhard, M., Stanton, J. (2012). Accelerated bridge construction in Washington State: from research to practice. PCI Journal, 57(4), 34-49. https://doi.org/10.15554/pcij
  4. Langston, C., Zhang, W. (2021). DfMA: Towards an integrated strategy for a more productive and sustainable construction industry in Australia. Sustainability, 13(16), 9219. https://doi.org/10.3390/su13169219.
  5. Gao, S., Jin, R., Lu, W. (2020). Design for manufacture and assembly in construction: a review, Building Research & Information, 48(5), 538-550. https://doi.org/10.1080/09613218.2019.1660608.
  6. Lu, W., Tan, T., Xu, J., Wang, J., Chen, K., Gao, S., Xue, F. (2021). Design for manufacture and assembly (DfMA) in construction: the old and the new. Architectural Engineering and Design Management, 17(1-2), 77-91. https://doi.org/10.1080/17452007.2020.1768505.
  7. Bakhshi, S., Chenaghlou, M.R., Rahimian, F.P., Edwards, D.J., Dawood, N. (2022). Integrated BIM and DfMA parametric and algorithmic design based collaboration for supporting client engagement within offsite construction. Automation in Construction, 133, 104015. https://doi.org/10.1016/j.autcon.2021.104015.
  8. Shim, C.S., Kang, H., Dang, N.S., Lee, D. (2017). Development of BIM-based bridge maintenance system for cable-stayed bridges. Smart Structures and Systems, 20(6), 697-708. https://doi.org/10.12989/sss.2017.20.6.697.
  9. Nguyen, D.C., Jeon, C.H., Roh, G., Shim, C.S. (2024). BIM-based preassembly analysis for design for manufacturing and assembly of prefabricated bridges. Automation in Construction, 160, 105338. https://doi.org/10.1016/j.autcon.2024.105338.
  10. Duy-Cuong, N., Roh, G.T., Shim, C.S. (2022). Definition of digital engineering models for DfMA of prefabricated bridges. Journal of KIBIM, 12(1), 10-22. (in Korean) https://doi.org/10.13161/kibim.2022.12.1.010.
  11. Safaa, Y.P., Hatmoko, J.U.T.D., Purwanggono, B. (2019). Evaluation of the use of prefabricated bridge elements with design for manufacture and assembly (DfMA) criteria. MATEC Web of Conferences, 270, 05006. https://doi.org/10.1051/matecconf/201927005006.
  12. Laovisutthichai, V., Lu, W. (2026). Design for manufacture and assembly (DfMA) for modular buildings: an analytical framework. Journal of Asian Architecture and Building Engineering, 25(1), 247-261. https://doi.org/10.1080/13467581.2025.2455028.
  13. Gbadamosi, A.Q., Mahamadu, A.M., Oyedele, L.O., Akinade, O.O., Manu, P., Mahdjoubi, L., Aigbavboa, C. (2019). Offsite construction: developing a BIM-Based optimizer for assembly. Journal of Cleaner Production, 215, 1180-1190. https://doi.org/10.1016/j.jclepro.2019.01.113.
  14. Jeon, C.H., Shim, C.S., Lee, Y.H., Schooling, J. (2024). Prescriptive maintenance of prestressed concrete bridges considering digital twin and key performance indicator. Engineering Structures, 302, 117383. https://doi.org/10.1016/j.engstruct.2023.117383.
  15. Roh, G., Park, J., Jeon, C.H., Shim, C.S. (2024). Development of a baseline digital twin model as a prerequisite for the digital twin definition of a PSC-I bridge with model updating considering member stiffness. Buildings, 15(1), 17. https://doi.org/10.3390/buildings15010017.
  16. Roh, G., Jeon, C.H., Shim, C.S., Park, J., Kang, D., Lee, Y.J. (2026a). Digital twin models for management of key performance of prestressed concrete bridges. Engineering Structures, 346, 121686. https://doi.org/10.1016/j.engstruct.2025.121686.
  17. Gaunt, M. (2017). BIM model-based design delivery: Tideway East, England, UK. Proceedings of the Institution of Civil Engineers-Smart Infrastructure and Construction, 170(3), 50-58. https://doi.org/10.1680/jsmic.17.00011.
  18. ISO (2018a). BS EN 19650-1: 2018. Organization and digitization of information about buildings and civil engineering works, including building information modelling (BIM)—Information management using building information modelling, ISO, Geneva, Switzerland.
  19. ISO (2018b). 16739-1:2018. Industry Foundation Classes (IFC) for data sharing in the construction and facility management industries, ISO, Geneva, Switzerland.
  20. Nakamura, K., Tsukada, Y., Teraguchi, T., Kurokawa, C., Imai, R. (2025). Integrated data model for bridges with 3D geometry and maintenance information. Computer-Aided Civil and Infrastructure Engineering, 40(27), 4994-5009. https://doi.org/10.1111/mice.70084.
  21. BSi (2013). PAS 1192-2:2013. Specification for information management for the capital/delivery phase of construction projects using building information modelling, British Standards Institution.
  22. Dang, N.S., Rho, G.T., Shim, C.S. (2020). A master digital model for suspension bridges. Applied Sciences, 10(21), 7666. https://doi.org/10.3390/app10217666.
  23. Shim, C.S., Roh, G.T. (2021). Data-driven modeling algorithms for cable-stayed bridges considering mechanical behavior. Applied Sciences, 11(5), 2266. https://doi.org/10.3390/app11052266.
  24. Lee, K.M., Lee, Y.B., Shim, C.S., Park, K.L. (2012). Bridge information models for construction of a concrete box-girder bridge. Structure and Infrastructure Engineering, 8(7), 687-703. https://doi.org/10.1080/15732471003727977.
  25. Shim, C.S., Dang, N.S., Lon, S., Jeon, C.H. (2019). Development of a bridge maintenance system for prestressed concrete bridges using 3D digital twin model. Structure and Infrastructure Engineering, 15(10), 1319-1332. https://doi.org/10.1080/15732479.2019.1620789.
  26. Roh, G., Shin, J.H., Yoon, G.J., Park, C.J., Shim, C. (2026b). A data- and model-driven information delivery schema for steel girder design, manufacturing, and assembly. International Journal of Steel Structures, 1-16. https://doi.org/10.1007/s13296-026-01039-w.
  27. Qi, B., Costin, A. (2023). BIM and ontology-based DfMA framework for prefabricated component. Buildings, 13(2), 394. https://doi.org/10.3390/buildings13020394.
  28. Wan, C., Zhou, Z., Li, S., Ding, Y., Xu, Z., Yang, Z., Yin, F. (2019). Development of a bridge management system based on the building information modeling technology. Sustainability, 11(17), 4583. https://doi.org/10.3390/su11174583.
  29. Shimizu, T., Yoshikawa, S., Takinami, H., Misaki, N., Takahashi, Y., Nakayama, T., Kondo, K. (2013). Development of bridge management system using three-dimensional model. Journal of the Japan Society of Civil Engineers Series F, 3, 2013.
  30. Song, H., Kim, K., Shin, J., Roh, G., Shim, C. (2025). Digital twin framework for bridge slab deterioration: From 2D inspection data to predictive 3D maintenance modeling. Buildings, 15(12), 1979. https://doi.org/10.3390/buildings15121979.
  31. Jeon, C.H., Nguyen, D.C., Roh, G., Shim, C.S. (2023). Development of Brim-based bridge maintenance system for existing bridges. Buildings, 13(9), 2332. https://doi.org/10.3390/buildings13092332.
  32. Shim, C.S., Roh, G.T., Kang, D.H., Park, J.W. (2024). BIM-data of baseline digital twins for a new bridge maintenance system. Bridge Maintenance, Safety, Management, Digitalization and Sustainability, 2028-2033.
  33. Han, D., Zhao, W., Yin, H., Qu, M., Zhu, J., Ma, F., ... Pan, A. (2025). Large language models driven BIM-based DfMA method for free-form prefabricated buildings: framework and a usefulness case study. Journal of Asian Architecture and Building Engineering, 24(3), 1500-1517. https://doi.org/10.1080/13467581.2024.2329351.
  34. Bartholomew, M., Blasen, B., Koc, A. (2015). Bridge information modeling (BrIM) using open parametric objects. Federal Highway Administration, Office of Infrastructure, United States.
  35. Katz, C. (2008), Parametric description of bridge structures. IABSE symposium report, International association for bridge and structural engineering, 17-27.
  36. Girardet, A., Boton, C. (2021). A parametric BIM approach to foster bridge project design and analysis. Automation in Construction, 126, 103679. https://doi.org/10.1016/j.autcon.2021.103679.
  37. Shim, C.S., Lee, P.G., Chang, S.P. (2001). Design of shear connection in composite steel and concrete bridges with precast decks. Journal of Constructional Steel Research, 57(3), 203-219. https://doi.org/10.1016/S0143-974X(00)00018-3.
  38. Pyun, M.C., Shim, C.S., An, B.J., An, H.S., Lim, J.M. (2023). Steel pipe diaphragm with adjustable lateral displacement of PSC girder. Journal of the Korean Society of Civil Engineers, 71(7), 144-147. (in Korean) http://doi.org/10.2139/ssrn.4869826.
  39. Roh, G., Shim, C., Song, H. (2025a). Inspection data-driven machine learning models for predicting the remaining service life of deteriorating bridge decks. Buildings, 15(15), 2799. https://doi.org/10.3390/buildings15152799.
  40. Roh, G., Jeon, C.H., Shin, J.H., Shim, C.S., Kim, B., Kim, J., ... Park, K.T. (2025b). Unsupervised online anomaly detection in road bridges from single-point acceleration data. Developments in the Built Environment, 100791. https://doi.org/10.1016/j.dibe.2025.100791.