This paper aimed to identify the variation of layout in Hwangnyoungsa buddhist temple site based on studying published the excavation research paper and texts related to layout. According to earlier studies, in 1st construction period(553~569) of Hwangnyoungsa, there were trisection spaces with one main hall and two corridors in inner part and then in 2nd period(584~645), unified one. But actually trisection spaces had been maintained until the middle part of 8th century. And in each space there was the main hall with large yard. That is the 2nd period layout of Hwangnyoungsa. For the attainment this result, each building remains are judged under duplicated situation which one was the previous and next by consideration of the construction condition and special features of foundation. Although the meaning of trisection system of Hwangnyoungsa is similar with the layout of ancient palace, it could be said to derive from accumulation excavation research in Silla's archeological site and such studies.
KSCE Journal of Civil and Environmental Engineering Research
/
v.37
no.2
/
pp.409-417
/
2017
The study is concerned with doing research on the plan to prevent the dispute occurring between contract parties regarding the additional cost generated when the construction period is shortened during construction work. After the review of the claim cases and the judgment cases of the court regarding the additional cost caused by the shortened construction period, the representative problem is the incomplete regulations on calculating the additional cost. In the 1st stage of the results of the research on the problem, the procedure handling the additional cost is presented, and the process of planning and approving the shortening of the construction period is gone through in the stage of the procedure to prevent the dispute on the additional cost between contract parties. In the 2nd stage, the plan on enacting and revising the regulations on removing the incomplete problems of the current regulations relating to the calculation of the additional cost. The basis for the advanced contract management is provided by resolving the incomplete problems of the current regulations relating to the shortening of the construction period with the prevention of a dispute and the resultant loss.
The purpose of this study is to clarify the reality of labor and capital productivity in the construction industry through an industry-level approach and to analyze the relationship between labor and capital productivity using a Cobb-Douglas production function. According to the research results, the construction industry has shown a very high capital productivity, while labor productivity has kept up a low level during the 1980s and 1990s. The reason was because of the lack of skillful construction workers and the decrease of capital. Meanwhile, the construction productivity has greatly increased since 2000 when there was no change in wages. This was because of a large inflow of low-wage foreign workers while the amount of value added has dramatically increased due to the liberalized sale price of apartment buildings. According to the analysis by the Cobb-Douglas production function, the elasticity coefficient of V/L to K/L in the construction industry had decreased from 1.1663 in the $1^{st}$ period(1971-1988) to 0.4465 in the $2^{nd}$ period(1989-1997), and to 0.1664 in the $3^{rd}$ period(1998-2003). Such a result means that the allocation of labor has gradually increased while the allocation of capital has decreased. Moreover there was a big increase in allocation of labor after 1998 due to the excessive deterioration of capital. In conclusion, in order to raise the construction productivity and to avoid labor-intensive production methods, investment for capital should be more increased. In particular, new machinery and equipment that can actually substitute human labor in construction sites should be more developed and applied to construction sites.
International conference on construction engineering and project management
/
2005.10a
/
pp.968-973
/
2005
The purpose of this study is to clarify the reality of labor and capital productivity in the construction industry through an industry-level approach and to analyze the relationship between labor and capital productivity using a Cobb-Douglas production function. According to the research results, the construction industry has shown a very high capital productivity, while labor productivity has kept up a low level during the 1980s and 1990s. The reason was because of the lack of skillful construction workers and the decrease of capital. Meanwhile, the construction productivity has greatly increased since 2000 when there was no change in wages. This was because of a large inflow of low-wage foreign workers while the amount of value added has dramatically increased due to the liberalized sale price of apartment buildings. According to the analysis by the Cobb-Douglas production function, the elasticity coefficient of V/L to K/L in the construction industry had decreased from 1.1663 in the 1st period(1971-1988) to 0.4465 in the 2nd period(1989-1997), and to 0.1664 in the 3rd period(1998-2003). Such a result means that the allocation of labor has gradually increased while the allocation of capital has decreased. Moreover there was a big increase in allocation of labor after 1998 due to the excessive deterioration of capital. In conclusion, in order to raise the construction productivity and to avoid labor-intensive production methods, investment for capital should be more increased. In particular, new machinery and equipment that can actually substitute human labor in construction sites should be more developed and applied to construction sites.
The phonemic awareness program included construction of 45 activities emphasizing various sounds in speech and letter names using a storybook. The subjects were thirty 1st and 2nd grade low-income(15 experimental and 15 control group) children attending an after-school program in Seoul. Pre- and post-tests assessed children's reading, self-concept, and learning motivation. The experimental group children had rich opportunity to deal with and discuss sounds, syllables, phonemes, and the Korean alphabet names during storybook reading, games, and play over a 12 week period, while the control group children were provided with worksheets, subject tutoring, and homework guidance. Results showed that the phonemic activities were an effective and useful way to enhance children's reading ability, self-concept, and learning motivation.
Located in a rear garden of Changdeok Palace, Yeonkyeong-Dang is valued as the most characteristic building of the houses of aristocrats of the later Joseon Dynasty. The time of the construction has been much debated, however, it is perceived through this research that the construction was completed in September 1827(the 27nd year of king Sunjo's reign). The shape of the buildings during this period resembles a letter ㄷ as shown in the picture of Dong-Kweol. We previously described that the purpose of Yeonkyeong-Dang was to carry the portrait of king Yikjong while keeping the shape of building when it was first established until the 8th year of king Heonjong (1842). In 1865 (the 2nd year of king Gojong's reign), it was reconstructed with very different outlook which has remained the present shape. The characteristic features of the residences of aristocrats were reflected in newly reconstructed Yeonkyeong-Dang. The structure was largely divided into two quarters that occupied by male and female residents respectively. The two quarters were bordered by fences and added with a study and a pavilion. The reconstruction was conducted by king Gojong's father, Daewon- Goon and its purpose was to prepare a separate house for the king and queen before the kings wedding that was about to come. During the 19th century, building an imitation of houses of aristocrats became quite a trend in the palace. Built in 1847, Nakseon-Jae was precedented and followed by Yeonkyeong-Dang. Also later Geoncheong Palace was built in Kyeongbok Palace in 1873. All of the three buildings imitated houses of aristocrats. Divided residences of male and female sections and splendid decorations were common features. Nakseon-Jae was the smallest in the structure of spaces, ornamentation of details and its sizes, Yeonkyeong-Dang was the second and Geoncheong Palace was the most distinguished building. The constructions of these three buildings created an innovative architectural wave in the 19th century palace. Yeonkyeong-Dang was the building that mediated the new flow of architectural structure in the 19th century palace.
The accidents which occurred between during february of 1997 to December of 2004 at the 2nd Daegu subway construction site have been classified. The accident types of injuries include accidental falls, falling objects which consist 53.4% of all accidents. This result is higher than the same types of accidents occurring at construction sites which are 46.3%. It was found that the 3.4 times more accidents are caused from safety measures and working methods than problems caused by lack of supervision. 78.0% of the accidents occurred at stations and at the ventilation area. 31.9% of the accidents occurred when the operation was near completion($81.0%{\sim}100.0%$) which means there was pressure to complete the operation to meet the set due date. In the case of 50.0% of the accidents were caused by workers with less than two month work experience. And lumbago is 6.9%, especially lumbago didn't showed before. Maybe accident should increase if not reduce a possibility of danger. In this study a literature search has been conducted for the cause of these accident types and respective suggestions are provided.
It is generally considered that only questionnares, collected at the time when each course close, have been evaluated & represented for all of the subjects. But all the result of each course can be actually evaluated using only the data taken from how to apply for at the construction site or at the factory, directly, for the period of at least one year, not just short months. This study is to evaluate and quantify the result and analyses using the data from questionnare concerning the level practically applied to each process at construction site. 1st for three(3) months, 2nd for six(6) months, 3rd for nine(9) months, finally 4th for twelve (12) months, one year These questionnares have been distributed for same people four(4) times to find out what to, how to be applied with each subject.
Kim, Dong-Eok;Kim, Bong-Soo;Kim, Hyun-Bae;Yoon, Yong-Cheol;Kim, Chi-Ho;Kim, Hyeon-Tae
Korean Journal of Agricultural Science
/
v.39
no.4
/
pp.459-466
/
2012
The objective of this study is to observe growth pattern of grand rapids(lettuce) according to different dexperimental conditions for minimizing its growth period such as composition of nutrient, irradiation time of light source and cultivation mode. The culture of water spray type using seeds of grand rapids was performed during growth period of total 50 days. Experimental conditions consist of five compositions of nutrient (PW 0.5 mS/cm, PW 1.0 mS/cm, PY 0.5 mS/cm, PY 1.0 mS/cm, PW 2.0 mS/cm) and three irradiation times of light source (12h(on) / 12h(off), 18h(on) / 06h(off), 24h(on) / 00h(off)). Illumination was adjusted to ratio of 7:1:1 of red, blue and white color, respectively. Indoor environmental condition for cultivating grand rapids is as follows: temperature (19-$22^{\circ}C$), relative humidity (60-70%) and carbon dioxide (1,000-1,200 ppm). The data were obtained from five iteration tests. The maximum growth level was observed in the experimental condition of 18 hr(on) / 06 hr(off) and PY 1 mS/cm for 1st week of cultivation period, 24 hr(on) / 00 hr(off) and PY 1mS/cm for 2nd week of cultivation period, and 24 hr(on) / 00hr(off) and PW 1 mS/cm for 3rd week of cultivation period, respectively. On the contrary, the minimum growth level was observed in the experimental condition of 18 hr(on) / 06 hr(off) and PW 0.5 mS/cm for 1st week of cultivation period, 12 hr(on) / 12 hr(off) and PW 0.5 mS/cm for 2nd week of cultivation period, and 12 hr(on) / 12 hr(off) and PY 0.5 mS/cm for 3rd week of cultivation period, respectively. Based on the results obtained from this study, it is concluded that the growth level of grand rapids varied with different irradiation time of light source and composition ratio of nutrient according to cultivation period.
Proceedings of the Korean Institute of Building Construction Conference
/
2008.05a
/
pp.57-60
/
2008
This study investigated the results of insulation heat curing method using double layer bubble sheet in slab concrete and mass concrete in cold weather environment. First of all, when double bubble sheets are applied, it was shown that slab concrete was protected from early freezing by remaining between 6 and 15℃ even in case outside temperature drops -9℃ below zero until the 2nd day from piling, and in the case of mass concrete, with the maximum temperature difference between the center and surface less than 4℃, crack occurrence index was close to 2 and no hydration heat crack occurred by internal constraint. The insulation heat preservation curing method using the double bubble sheet applied in this field prevented early freezing owing to stable curing temperature management, deterring concrete strength development delay at low temperature, and obtained the needed strength. Also, it was proven that the method is highly effective and economic for cold weather concrete quality maintenance through curing cost reduction like construction period shortening and labor cost reduction, etc by reducing the process of temporary equipment installation and disassembling.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.