• Title/Summary/Keyword: 4D CAD

Search Result 400, Processing Time 0.039 seconds

3D/4D CAD Applicability for Life Cycle Facility Management (3D/4D CAD를 통한 시설물 생애주기 관리 유용분야 도출)

  • Park, Jung-Jun;Kim, Chang-Yoon;Kim, Hyoung-Kwan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.291-296
    • /
    • 2008
  • For the past two decades, 3D/4D CAD research has heel mainly focused on the design and construction phase of a facility life-cycle. However, there has been a general notion that the strength of 3D/4D CAD lends itself to other phases such as planning, operation and maintenance. In this research, a 3D/4D CAD model was generated in a commercial software platform. Then, the traditional 1:fe cycle facility management procedures are reviewed to, see any possible improvement opportunity with the 3D/4D CAD model as an example. A focus group interview, in conjuction with an extensive literature review, produced the list of area where 3D/4D CAD model could significantly benefit the traditional life cycle facility practices. Finally, a questionnaire-based survey was conducted with 155 respondents to statistically verify the feasibility of 3D/4D CAD for life cycle facility management.

  • PDF

Improved Methodology of Construction Information Management in 4D CAD System (4D-CAD시스템의 공사정보관리 효율화방안)

  • Kang Leen Seok;Kim Chang Hak;Ji Sang Bok;Han Joo A
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.1132-1135
    • /
    • 2004
  • Recently. our construction industry is using 4D-CAD system but the public Database (DB) for the 4D-CAD system is insufficiently built. It is difficult to connect 4D-CAD system information such as schedule, drawings. Therefore this study suggest a methodology to link the 4D-CAD system information with work breakdown structure(WBS) and the methodology suggested in this study was applied to a 4D-CAD system

  • PDF

Development and Case Study of 4D CAD System for Visualizing Schedule Data of Construction Project (건설시설물 공정정보 시각화를 위한 4D CAD시스템의 개발 및 적용사례 분석)

  • Kang, Leen-Seok;Yun, Seon-Mi;Kwon, Jung-Hui;Mun, Jin-Seok
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.4
    • /
    • pp.373-380
    • /
    • 2007
  • Recently, various 4D CAD systems for visualizing construction schedule data are being developed. Specially, in case of railway project, the numerical information of progress data should be changed with visualized data by long construction section because the railway project consists of long length in construction site. This study suggests a case study of development of 4D CAD system for visualizing schedule information and the major functions of developed system are verified by railway project. The detailed application procedure of 4D CAD system including input data for a railway project is described in the study. The practical application of 4D CAD system can be improved in railway project by these demonstration researches.

Fundamental Study of 4D CAD Application by Using Augmented Reality for Civil Engineering Project (증강현실(Augmented Reality)의 토목시설물 4D체계 활용을 위한 기초적 연구)

  • Kang, Leen-Seok;Moon, Hyoun-Seok;Kim, Hyun-Soo;Choi, Hyung-Lae;Kim, Chang-Hak
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.658-661
    • /
    • 2008
  • This study aims to suggest a methodology for developing the AR-4D CAD system which can improve construction progress control process by using augmented reality(AR) technology for civil engineering project. This study reviews practical application of AR process in 4D CAB system and suggests the detailed requirements, information flow system and integrated interface function for developing AR-4D CAD system. Through these methods, this research classifies main functions of AR-4D CAD system that can visualize construction progress control data, and suggests an operation scenarios of the system.

  • PDF

Application of the 3D CAD Model Data for 4D Simulation and Quantity Estimation (4D 시뮬레이션 및 일정별 물량정보검색을 위한 3D 모델 정보 활용)

  • Lee Jae-Cheol
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.4 s.20
    • /
    • pp.107-114
    • /
    • 2004
  • This paper represents the application of the 3D CAD Model data for 4D simulation and quantity estimation. These support the effective and practical use of 4D CAD model. By using and manipulating the 3D CAD model information, scheduling and quantity estimation could be developed more quickly and effectively. So the 3D CAD model information is made use of not only drawing a blueprint but also playing an important part of data integration platform. The scheduling module sets up the schedule generation logic that consists of period, priority of element arrangement, and time lag of floor placement. It sorts the working items as a priority of working process. And the quantity estimation module queries the material quantity of the structural elements according to the scheduling conditions. These two modules are developed using the 3D CAD model information and assist the function of 4D CAD model.

A Case Study of 3D and 4D CAD Application for the Domestic Construction Project (국내 건설공사 3D 및 4D CAD 적용사례로 본 현황분석)

  • Gi, Sang-Bok;Kang, Leen-Seok;Kwon, Jung-Hui;Moon, Jin-Seok;Bak, Sang-Min
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2008.04a
    • /
    • pp.120-125
    • /
    • 2008
  • The purpose of this case study is to find out current issue and improvement directions of the application of 3D and 4D to the construction project including building, highway and railway projects. For the study, the main functions of the 3D and 4D simulation of current system are analyzed and proposed improvement directions for 3D CAD utilization in 4D environment. Case studies of CAD application include land development for housing complex, highway project and express railway project.

  • PDF

Earned Value Management Systems Using 4D-CAD (4D CAD 활용을 통한 공정-원가 통합 시스템)

  • Park Ji-Ho;Jung Young-Soo;Kim Sung-Mo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.504-508
    • /
    • 2003
  • Cost and schedule are the major concerns for the successful construction project management. The four dimensional CAD (4D CAD) integrating graphical data and scheduling data has also been an area of research interests for improving construction controls. In order to achieve the benefits from these areas in an integrated way, this study proposes a 4D-EVMS system for the owners. Managerial requirements for cost and schedule control for the owners are identified first. A 4D-EVMS model is then proposed which provides functional flexibility in order to enhance the efficiency of the system. Lessons learned and practical implications are briefly summarize.

  • PDF

Function Organization of nD CAD System for Plant Project by Linking Cost and Resource Information (비용과 자원을 연계한 플랜트공사 nD CAD 시스템 기능 구성 방안)

  • Kang, Leen-Seok;Ji, Sang-Bok;Moon, Hyoun-Seok;An, Jae-Kyu
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.809-812
    • /
    • 2007
  • This study suggests a methodology for organizing functions of nD CAD model which 4D object is linked with cost and resource information. And the suggested model is composed of process analysis function of plant project based on visualized scenario analysis. That is, it is possible to manage effectively not only construction schedule plan, but also resource and cost information by integrating construction management information into nD CAD object. And the suggested model can be utilized as information of a effective decision-making tool through analyzing of optimal process scenario and sharing of an analyzed information.

  • PDF

Improved Link System of Schedule and 3D Object for VR-base Construction Project (가상건설기반의 건설공사 일정 및 3D객체 연동시스템의 개선된 구축방안)

  • Kwon, Jung-Hui;Moon, Hyoun-Seok;Park, Seo-Young;Gi, Sang-Bok;Kang, Leen-Seok
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.289-294
    • /
    • 2007
  • Virtual reality (VR) technology for construction project includes 3D CAD application and 4D CAD system for visualizing construction schedule data. 3D CAD application is more important in the design phase and 4D CAD system is effective tool in the construction phase. This study suggests a methodology to develop VR functions that can be used for project life cycle. The results of this study includes composition algorithms to make VR systems such as bird's eye view system, VR drawings system, VR telepresence system and VR risk management system. Those methodologies can be used for integrated VR system with nD CAD object.

  • PDF

Development of Major Functions of Visualization System for Construction Schedule Data in Plant Project (플랜트공사 관리 효율화를 위한 공정정보 시각화 시스템의 주요 기능 구성방안)

  • Kang, Leen-Seok;Moon, Hyoun-Seok;Ji, Sang-Bok;Lee, Tae-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.1
    • /
    • pp.66-76
    • /
    • 2008
  • Plant project is a complex project that consists of civil engineering, building, mechanical and electronic works. The schedule management is one of important factors in plant project because the construction duration of the project is very short comparing with the other construction projects. Specially, 4D CAD system needs to visualize construction schedule information in those complex projects. This study suggests methodologies for improving 4D CAD functions by considering those project characteristics. To develop a plant 4D CAD system, this study includes to develop new functions by analyzing actual schedule information from the plant construction sites.