Experimental study on replaceable precast concrete beam-column connections

  • Seung-Ho Choi;Sang-Hoon Lee;Jae-Hyun Kim;Inwook Heo;Hoseong Jeong;Kang Su Kim
    • Earthquakes and Structures
    • /
    • v.26 no.1
    • /
    • pp.49-58
    • /
    • 2024
  • The purpose of this study was to develop a system capable of restoring the seismic performance of a precast concrete (PC) connection damaged by an earthquake. The developed PC connection consists of a top-and-seat angle, post-tensioning (PT) tendons, and U-shaped steel. The PC beam can be replaced by cutting the PT tendons in the event of damage. In addition, the seismic performance of the developed PC beam-column connection was evaluated experimentally. A PC beam-column connection specimen was fabricated, and a quasistatic cyclic loading test was conducted to a maximum drift ratio of 2.3%. Subsequently, the PC beam was replaced by a new PC beam, and the repaired PC connection was loaded to a maximum drift ratio of 5.1%. The structural performance of the repaired PC connection was then compared with that of the original PC connection. The difference in the load at the drift ratio of 2.3% between the original and the repaired PC specimens was only 0.2%. The residual drift ratio in the repaired PC specimen did not exceed 1.0% at the 2.0 % drift ratio cycles, which satisfies the life safety performance level specified in ACI 374.2R-13. When the developed PC connection system is used, structural performance can be restored by rapidly replacing the damaged elements.

Work Productivity Analysis of High-performance PC Slab Installation

  • Shin, Young-su;Cho, Kyuman;Cho, Chang-geun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.616-617
    • /
    • 2015
  • Demand is increasing for large, high-rise, and complex buildings, which is leading to advances in the development of high-performance structural systems. In this context, precast concrete (PC) technology has received a large amount of attention owing to its benefits in terms of schedule reduction, high quality, and easy installation. In addition, advanced methodologies that improve the PC performance by the addition of various materials have recently been reported. Research on analyzing the effects of such high-performance PC on the construction process and productivity is very limited. This makes it difficult for decision-makers to apply PC to particular projects. Thus, the aim of this research was to analyze the work productivity of the high-performance PC slab installation process by using a construction simulation tool to resolve critical issues. In this study, a real construction project that adopted PC slab installation work was analyzed, and a sensitivity analysis was performed to confirm the reliability of the analysis results.

  • PDF

Experimental Study of In-situ Production of Precast Concrete Members

  • Lim, Jeeyoung;Son, Seunghyun;Kim, Jeong Tai;Kim, Sunkuk
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.263-270
    • /
    • 2017
  • The precast concrete (PC) structure has been preferred for reasons of shortening the construction time and securing the quality and, in particular, it has a cost saving effect in case of long span and heavy loaded structure with high floor height. Most engineers take it for granted to install the plant produced PC members. Researchers in several papers have argued that slander PC members such as columns and girders can be cost-effective if in-situ production is possible, while ensuring quality equal to or better than in-plant production. However, this argument is not officially accepted because objective verification has not been done. Therefore, the purpose of this study is to experimentally conduct in-situ production of PC members to verify the above claim. For this study, a storage building with long span and heavy loaded structure with high floor height was selected as a case study site. For the site, most of the PC members were supplied from the plant, and some of the columns were produced in the site for this study. As a result, it has been confirmed that it has a cost saving effect of 20% while having superior quality to plant-produced PC columns.

  • PDF

Suitability Analysis of Non-contact Sensing Methods for Precast Concrete Element Flatness Inspection (프리캐스트 콘크리트 부재의 평탄도 검사를 위한 센싱 기반 측정방법 적합도 비교)

  • Kwon, Soon-Ho;Kim, Jeong Seop;Sim, Sung-Han;Kim, Minkoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.4
    • /
    • pp.52-59
    • /
    • 2023
  • Flatness inspection of PC elements is normally conducted manually by inspectors at manufacturing sites. However, the manual inspection is error-prone and subjective, so it is necessary to develop a robust and efficient flatness measurement method. Recently, a few studies of laser scanner-based flatness inspection have been conducted. However, little attention on field applicability in terms of accuracy, time and cost has been paid. To tackle the limitation, this study aims to compare three sensing method including floor profiler, terrestrial laser scanner and total station for flatness inspection of PC elements. A series of experiments on two full-scale PC slabs were conducted and the results show that the laser scanning method is the most suitable for the PC elements flatness inspection in the aspects of accuracy, time and cost.

Feasibility Analysis of the Use of Architectural PC for Improving the Productivity in Apartment Housing Projects (공동주택 공사에서의 생산성 향상을 위한 건축 외관용 PC의 적용 타당성 분석)

  • Lee, Hyun-Seok;Sohn, Young-Jin;Lee, Yoon-Sun;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.118-125
    • /
    • 2008
  • In Korea, five days per week system, duration reduction bidding system, and post sale system have recently stimulated an interest in productivity improvement in construction project. However, analysis result of productivity in Korean construction industry found that the productivity is too low. APC (Architectural PC) is alternative of reveal wall and parapet in apartment housing prcjects and is used abroad broadly because of duration reduction for productivity improving. APC is used as external curtain wall in Dubai, North America, and Southeast Asia. Therefore, it is proposed that necessary to Introduce APC in Korea. The objective of this study is to draw up introduction of APC in apartment housing projects. We analysed the feasibility of the use of APC. The survey results reported that APC would be able to improve the productivity in the eight productivity factors.

Development of PC Double Wall for Staircase Construction (계단실 공사를 위한 PC Double Wall 공법 개발)

  • Suh, Jung-Il;Park, Hong-Gun;Hwang, Hyeon-Jong;Im, Ju-Hyuk;Kim, Yong-Nam
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.6
    • /
    • pp.571-581
    • /
    • 2014
  • In the present study, hollow precast concrete wall (PC Double Wall) for staircase construction was developed. Comparing the conventional walls, the PC Double Wall can be reduced the lift weight using hollow core and improves the integrity between the PC members. The cross-section and re-bar details of the PC Double Wall were developed considering precast concrete manufacturing, constructability, and the structural safety. Particularly, a form system was developed to manufacture thin and hollow core PC wall efficiently. A mock-up test for a staircase using the PC Double wall was performed to verify the constructability and integrity of the PC walls. The test result verified that joint deformation and cracking did not occur as showing good constructability.

Verification of the Use of Architectural PC for Improving the productivity in an Apartment Housing Project (공동주택 공사에서의 건축 외관용 PC 활용에 따른 생산성 향상 분석)

  • Lee, Hyun-Seok;Lee, Sang-Hyo;An, Byung-Ju;Lee, Yoon-Sun;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.670-673
    • /
    • 2007
  • In Korea, it has recently occurred that problems of productivity and construction duration in the construction industry. If five days per week system come into effect, they'll become more urgent. The productivity of construction industry and competitive construction duration in Korea are too low. If post sale system becomes effective, construction companies will strive to improve productivity. Therefore, the objective of this study is to draw up Architectural PC as the alternative for productivity improving and analyze possibility of productivity improving by comparing with established method of construction.

  • PDF

Experimental Evaluation of PC Non-Bearing Wall System for the Damage Control of RC Wall Type Apartments (RC 벽식 아파트의 손상 제어를 위한 PC 비내력벽 시스템의 실험적 평가)

  • Moon, Kyo Young;Kim, Siyun;Kim, Sung Jig;Lee, Kihak
    • Journal of Korean Association for Spatial Structures
    • /
    • v.19 no.4
    • /
    • pp.77-84
    • /
    • 2019
  • This study introduces a newly developed PC non-bearing wall system to prevent the damage of RC wall-type apartments that have been heavily damaged by the 2017 Pohang Earthquake. In order to evaluate the performance of the developed PC non-bearing wall system, a static cyclic test is conducted. The prototype of test specimen is from the RC wall-type apartment which has been severely damaged by the 2017 Pohang Earthquake. The specimen with the conventional non-bearing wall system showed the similar damage of RC wall type apartment suffered from the Pohang Earthquake. In case of the specimen with the developed PC non-bearing wall system, cracks and damages were not transmitted between the walls due to the seismic slit and there were almost no cracks in the non-bearing walls. Therefore, the proposed non-bearing wall system, separated from the structural walls, could prevent spreading cracks to bearing walls and make it possible to effectively control damage due to earthquake loads.

Modeling of Precast Concrete Shear Walls BIM Program (BIM 프로그램을 이용한 프리캐스트 콘크리트 전단벽의 모델링)

  • Mun, Ju-Hyun;Yoon, Hyun-Sub;Kim, Jong-Won;Eom, Byung-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.5
    • /
    • pp.451-462
    • /
    • 2022
  • The objective of the study is to establish a BIM modeling of precast concrete(PC) shear wall with various wall-to-base connections. The family library of PC shear wall was established in BIM program using component function in a IFC(Industry foundation classes) file format and SketchUp program. From the BIM program, the amounts of concrete, reinforcing bars and steel materials as well as the interference of arranged reinforcing bars can be accurately evaluated in the PC shear walls with spliced sleeves, bolt, or welding plate connection methods. Although the additional metallic materials such as steel plates, bolts, and nuts were used in the PC shear walls with welding plate connection method, their amounts of materials, economic efficiency, and environmental impact were similar to those with spliced sleeve connection. Consequently, the bolt or welding connection is a highly applicable method as wall-to-base connection of PC shear walls, and it was a more useful method than spliced sleeve method, particularly considering the constructability.

Shear Strength of Prestressed PC-CIP Composite Beams without Vertical Shear Reinforcements (수직전단보강이 없는 PS 콘크리트와 현장타설 콘크리트 합성보의 전단강도)

  • Kim, Chul-Goo;Park, Hong-Gun;Hong, Geon-Ho;Kang, Su-Min;Suh, Jung-Il
    • Journal of the Korea Concrete Institute
    • /
    • v.26 no.4
    • /
    • pp.533-543
    • /
    • 2014
  • Currently, composite construction of prestressed Precast Concrete (PC) and Cast-In-Place (CIP) concrete with different concrete strengths are frequently used in the modular construction. However, current design codes do not clearly define shear design methods for such composite beams. In this present study, simply supported prestressed PC-CIP composite beams without vertical shear reinforcement or only with horizontal shear reinforcement were tested to evaluate the effect of prestressing on the shear strength and the shear design method for such composite members. The test variables were the area ratio of PC and CIP concretes, prestressing force, shear span-to-depth ratio, and shear reinforcement ratio. The results showed that the shear strength was increased by the increase of prestressing force and prestressed PC area, and the decrease of shear span-to-depth ratio.