• Title/Summary/Keyword: Building control

Search Result 3,185, Processing Time 0.033 seconds

Control of a building complex with Magneto-Rheological Dampers and Tuned Mass Damper

  • Amini, F.;Doroudi, R.
    • Structural Engineering and Mechanics
    • /
    • v.36 no.2
    • /
    • pp.181-195
    • /
    • 2010
  • Coupled building control is a viable method to protect tall buildings from seismic excitation. In this study, the semi-active control of a building complex is investigated for mitigating seismic responses. The building complex is formed of one main building and one podium structure connected through Magneto-Rheological (MR) Dampers and Tuned Mass Damper. The conventional semi-active control techniques require a primary controller as a reference to determine the desired control force, and modulate the input voltage of the MR damper by comparing the desired control force. The fuzzy logic directly determines the input voltage of an MR damper from the response of the MR damper. The control performance of the proposed fuzzy control technique for the MR damper is evaluated for the control problem of a seismically-excited building complex. In this paper, a building complex that include a 14-story main building and an 8-story podium structure is applied as a numerical example to demonstrate the effectiveness of semi-active control with Magneto-Rheological dampers and its comparison with the passive control with the Tuned Mass Damper and two uncoupled buildings and hybrid semi-active control including the Tuned Mass Damper and Magneto-Rheological dampers while they are subject to the earthquake excitation. The numerical results show that semi-active control and hybrid semi-active control can significantly mitigate the seismic responses of both buildings, such as displacement and shear force responses, and fuzzy control technique can effectively mitigate the seismic response of the building complex.

Design and Implementation of Optimal Control Algorithms for Building Energy Management (빌딩 에너지 관리 최적화 알고리즘 설계 및 구현)

  • Jin Jung-Hwa;Chung Sun-Tae
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.16 no.10
    • /
    • pp.969-976
    • /
    • 2004
  • Building energy saving is one of the most important issues in these days. Energy saving control strategies should be developed properly to achieve the saving. One of such area we could apply is the HVAC (Heating, Ventilation and Air-Conditioning) system. Through the optimal control algorithm for building energy management system (EMS), you can not only save the cost of building energy, but also protect HVAC system components against the unexpected condition. In order to verify the effectiveness of building energy saving, field test was accomplished for several months at 'A' building. And to get the measured data, remote control was used. If the remote control is used in BAS (Building Automation System), control and monitoring can be done for all of the building systems, such as HVAC, power, lighting, security and fire-alarm etc. anywhere any time. Using the remote control, Control and monitoring is possible for the testing system without going there. As the results of field test, we could reduce $5{\sim}10\%$ of the building energy cost.

The Analysis of Life Cycle Cost and Cooling Water Circulating Pump Energy Saving According to Variable Speed Pressure Differential Setpoint Control Strategy

  • Kim, Seo-Hoon;Kim, Jong-Hun;Jang, Cheol-Yong;Song, Kyoo-dong
    • KIEAE Journal
    • /
    • v.15 no.4
    • /
    • pp.37-43
    • /
    • 2015
  • Purpose : The study applied control strategy to reduce through optimal control and operation of pump by applying control on variable speed to the circulation pump of HVAC system in the office building. The study has the purpose to review validity of control on variable speed as ESMs(Energy Saving Measures) and establish the control technology on variable speed pump. The study performed reduction analysis of building energy and economic evaluation of pump through energy effectiveness control strategy of HVAC system. Method: The study sought possible reduction through energy control strategy which can provide proper flow fitting to building load by applying control on variable speed pump. The study applied control strategy to reduce through pressure differential set-point control and operation of pump by applying control on variable speed to the circulation pump of HVAC system in the office building. Result : The results showed that about 16-35% of pump energy could be saved by using these optimal control strategies. In the result of analysis on 10 years life cycle cost of analysis on payback period of initial investment pump, variable speed pump control showed 5.1 years.

A Study on Control and Monitoring System for Building Energy Management System

  • Oh, Jin-Seok;Bae, Soo-Young
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.35 no.3
    • /
    • pp.335-340
    • /
    • 2011
  • Building energy saving is one of the most important issues in these days. Control algorithm for energy saving should be designed properly to reduce power consumption in building. Recently, building energy system consists of hybrid energy system coupling with RE (Renewable Energy) source. In this paper, an optimum control algorithm for building energy saving is applied to BEMS (Building Energy Management System) by using an outdoor air temperature prediction strategy. BEMS coupling with renewable energy can control HVAC (Heating, Ventilating and Air-Conditioning) system effectively. In order to verify the effectiveness of building energy saving, BEMS was tested for several months at a laboratorial chamber with an air conditioner, fan and heater. To this end BEMS embedded control algorithm has been tested successfully.

Experimental Study on the Vibration Control for Building Structures using LQG Compensator (LQG 보상기를 이용한 건물의 진동제어 실험)

  • 민경원
    • Proceedings of the Earthquake Engineering Society of Korea Conference
    • /
    • 1999.04a
    • /
    • pp.202-216
    • /
    • 1999
  • To control the motion of building structures under earthquakes their response should be measured first by various sensors and transformed into the control forces using some control algorithms. Of many control algorithms linear quadratic control is widely used as it is easy to implement and analyze. However the algorithms has the disadvantage that it needs the real-time measurements of all state variables(i.e, building's displacements and velocities) which are difficult to achieve for the building structures under earthquakes. Thus the practical algorithms employing output feedback are developed. In this paper LQG algorithm is used for the control of the building model with an active mass driver. The building's acceleration is used to obtain the control gain and the Kalman filter gain. The LQG control strategy is verified with the experimental study on the one-storybuilding model equipped with the active mass driver. This paper demonstrates experimentally the efficacy of the LQG algorithm based on the active mass driver system in reducing the response of seismically excited buildings.

  • PDF

Experimental Study on Active Control of Building Structures by Feedback Variables (피드백 변화에 따른 건물의 능동제어 실험)

  • 민경원
    • Proceedings of the Earthquake Engineering Society of Korea Conference
    • /
    • 1998.10a
    • /
    • pp.286-294
    • /
    • 1998
  • This paper presents an experimental study on the performance of the active damper device by feedback variables. The damper is a mass-typed active device, which exerts the inertia control force on the building by AC servo motor. The control performance is experimentally analyzed considering the building response and the control force. It is found that the building response is greatly reduced by mass-typed device under the resonant and earthquake loading. Also, the experimental results show that the velocity feedback reduces the building responses with the smallest amount of control force than any other feedback variables.

  • PDF

A Study on the Development of Building Control and management System -Focusing on the Lighting Control and Monitoring system- (빌딩 제어 및 관리 시스템 개발에 관한 연구 -조명 제어 관리 시스템 구축을 중심으로-)

  • Cho, Sung-O
    • Korean Institute of Interior Design Journal
    • /
    • v.16 no.4
    • /
    • pp.110-118
    • /
    • 2007
  • Technology has been viewed at various stages of civilization as leading to future progress. The building, its services systems and management of the work process all contribute to the well-being of people within an organization. Productivity relies on there being a general sense of high morale and satisfaction with the workplace. Now buildings are considered as providing a milieu for human creativity. Flexibility, adaptability, service integration and high standards of finishes offer an intelligence threshold. Building Automation System(BAS) - controlled lighting systems may offer incremental energy saving. Conventional Lighting control systems often control equipment in a single room or over the limited area, because they are centralized control systems, which means that all the controlled circuits must be wired to a single control panel. The computers used by these systems are typically dedicated microprocess that perform only lighting control functions. By comparison, modern Building automation systems are distributed control system, which means that their computing hardware and software are distributed as a network that microprocessor-based control modules and standard PC. PLC(Programmable Logic controller) is extensible virtually without limits, so that all the lighting in a facility can be controlled by single, unified system - the same system that also can control and monitor the building's HVAC, security, and manufacturing processed, elevators, and more. A Building automation system can control light using schedules, manual controls, occupancy sensors, and photosensors, either singly or in combination. Building Lighting control and monitoring system will be for a energy saving and efficient building management system.

Numerical and experimental investigation of control performance of active mass damper system to high-rise building in use

  • Park, S.J.;Lee, J.;Jung, H.J.;Jang, D.D.;Kim, S.D.
    • Wind and Structures
    • /
    • v.12 no.4
    • /
    • pp.313-332
    • /
    • 2009
  • This paper numerically and experimentally investigates the control performance of the active mass damper (AMD) systems in a 26-story high-rise building in use. This is the first full-scale application of the AMD system for suppressing the wind-induced vibration of a building structure in Korea. In addition, the AMD system was installed on top of the building already in use, which may be the world's first implementation case. In order to simultaneously mitigate the transverse-torsional coupled vibration of the building, two AMD systems were applied. Moreover, the H-infinity control algorithm has been developed to utilize the maximum capacity of the AMD system. From the results of numerical simulation using the wind load obtained from the wind tunnel tests, it was found that the maximum acceleration responses of the building were reduced significantly. Moreover, the control performance of the installed AMD system was examined by carrying out the free and forced vibration tests. The acceleration responses on top of the building in the controlled case measured under strong wind loads were compared with those in the uncontrolled case numerically simulated by using the wind load deduced from the measured data and a structural model of the building. It is demonstrated that the AMD system shows good control performance in reducing the building accelerations.

A Study on Decisions of Building Design Control Committee in Jeju-Si (제주시 건축위원회의 심의성향에 관한 연구)

  • Park Chul-Min;Kim Jae-Chel
    • Journal of the Korean housing association
    • /
    • v.15 no.6
    • /
    • pp.77-88
    • /
    • 2004
  • The Building Design Control Commission has various important roles as the final check point for the overall urban management. Although nobody can argue that the committee is useless, participants' assessments on the results of the introduction and operation of the Building Design Control Commission are diversified. The primary purpose of this thesis lies in the institutional examination of the contents related with Building Design Control Commission by using the literature inquiry. The second purpose is to provide a help for the improvement of discussion of the administrative structure and improvement of the urban aesthetic through the systematic analysis of Building Design Control System. The extent of space is selected according to the case of building planning deliberation of Jeju-Si as the axis of Free International City, the center of administration, education, and culture. The period of time of examination is from January, 2002 to December, 2002. The subject of study is apartment which is deeply related with our lives by analyzing 2,231 discussion cases.

Implementation of Embedded Web Server and XML Web Services for Intelligent Building System (지능형 빌딩 시스템을 위한 임베디드 웹 서버와 XML 웹 서비스의 구현)

  • Kim, Tae-Kook;Chang, Hyeong-Jun;Park, Gwi-Tae
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.13 no.12
    • /
    • pp.1167-1172
    • /
    • 2007
  • The existing building control and automation systems which have been applied to buildings are provided by many different vendors and each vendor has its own proprietary protocol. There are many problems in system integration since those building control and automation systems belong to each vendor. Also, the problems of cost and space increase, due to the usage of personal computers as the control servers of DDC(Direct Digital Control) in each facility. Those problems mentioned above can be effectively resolved by using XML Web Services and Embedded Web Server. Embedded Web Server and XML Web Services are technologies emerging out of the IT industries and there are many researches to apply them into many fields. In this paper, Embedded Web Server and XML Web Services are proposed to be used in building control and automation system to resolve problems in building system integration.