• Title/Summary/Keyword: Calculation Specifications

Search Result 78, Processing Time 0.025 seconds

Evaluation of a Corrected Cam for an Interchangeable Lens with a Distance Window

  • Kim, Jin Woo;Ryu, Jae Myung;Jo, Jae Heung;Kim, Young-Joo
    • Journal of the Optical Society of Korea
    • /
    • v.18 no.1
    • /
    • pp.23-31
    • /
    • 2014
  • Recently, the number of camera companies that produce commercializing interchangeable lens systems such as digital single lens reflex (DSLR) and compact system camera (CSC) lenses has been gradually increasing. These interchangeable lenses have various kinds of lenses with distinct specifications. In particular, the distance window among these specifications is the function most preferred by customers. Mechanical manual zoom and manual focus in these high end camera lenses with a distance window are in particular desirable specifications and are required for product quality. However, the AF lens group is linked to the zoom cam and moves. Because the AF lens group moves along with the object distance, we can not realize the distance window with only zoom locus calculation. In this paper, in order to solve the problem, we suggest an optical calculation method for a corrected AF zoom cam for an interchangeable lens with a distance window to achieve product differentiation and analyze the error in the calculation.

Study on Sizing Calculation Method of Fuel Cell Propulsion Multirotor (연료전지 추진 멀티콥터의 사이징 계산 방법에 관한 연구)

  • LEE, DONGKEUN;AHN, KOOKYOUNG;KIM, YOUNGSANG
    • Transactions of the Korean hydrogen and new energy society
    • /
    • v.32 no.6
    • /
    • pp.542-550
    • /
    • 2021
  • As the application of multirotor grows, the demands for multirotor that can fly longer and load more are increasing. Hydrogen has a high energy density, so it can satisfy these demands when used in multirotor. In order to design hydrogen fueled multirotor that satisfies the desired flight time and payload, it is important to calculate the specifications of a fuel cell, battery, and hydrogen storage system. This paper contains detailed information on various energy systems used in multirotor and fuel cell powered multirotor research trends. This study proposed a sizing calculation method that meets the target flight time and payload using thrust and power equations. It has been explained how the two equations derive the particular specifications. The specifications of the multirotor were derived by assuming a payload of 50 kg and a flight time of 1 hour. In addition, the effects of the values of the fuel cell, hydrogen storage system, and motor propeller were analyzed.

Comparison of Domestic and Foreign Standard Specifications on Form Design (국내외 표준 시방서의 거푸집 설계 관련 규정의 비교)

  • Jeon, Kyu-Nam;Choi, Sung-Yong;Baek, Dae-Hyun;Han, Min-Cheol;Han, Cheon-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.29-31
    • /
    • 2010
  • This study investigated the typical standards of B kind of standard specification related to home and abroad forms design and compared them, and the results can be summarized as follows. In case of domestic standards, regulations on most forms design was described relatively in detail. and in case of CTEA among them, it included detailed contents of load conditions, lifting and subsidence. In case of abroad standards, the design regulations are only simply mentioned, not in detail, in ACI, CEB-FIP and BS, and JCI and JASS were similar to domestic KCI and KASS regulations. As to structural calculation in forms design regulations, most of domestic regulations included detailed matters on structural calculation, among them, CTEA shows the most detailed matters on it. On the other hand, it could be known that in case of abroad standards, most standards do not include matters on structural calculation except ACI, JCI and JASS.

  • PDF

Improvement of BoQ Documents for the BIM based Quantity Takeoff (BIM기반 물량 및 내역정보 생성을 위한 내역서 개선방안)

  • An, Ji-Won;Yun, Seok-heon
    • Journal of KIBIM
    • /
    • v.7 no.2
    • /
    • pp.16-24
    • /
    • 2017
  • It is very important to estimate accurate construction total cost needed early in the project. In the initial phase of the design, the project cost estimates are determined by total quantity from design documents and the variables that affect the calculation of the total cost of the project. In order to determine accurate total construction cost, the contractor has to produce detailed quantity information based on the drawings and specifications. The process of preparing quantification and cost estimation documents is still being worked out manually, and a lot of errors have been occurred in many cases. Recent advances in information technology have led to the BIM based quantity takeoff and cost estimation. However, there are some limits to the extent to which the current specifications for BoQ documents are computed from BIM model. This research analyze the current BoQ cases and analyze how to make quantity takeoff possible through BIM. The study defined five levels of quantity category that could be produced by BIM. Only about 40% or indirectly usable items can be used when information is extracted to BIM modelling. This is very insufficient to fill out the BoQ. The BoQ document structure quantity takeoff specifications should be simplified in order to BIM based cost estimation more efficiently.

Architecture of 2-D DCT processor adopting accuracy comensator (정확도 보상기를 적용한 2차원 이산 코사인 변환 프로세서의 구조)

  • 김견수;장순화;김재호;손경식
    • Journal of the Korean Institute of Telematics and Electronics A
    • /
    • v.33A no.10
    • /
    • pp.168-176
    • /
    • 1996
  • This paper presetns a 2-D DCT architecture adopting accurac y compensator for reducing the hardware complexity and increasing processing speed in VL\ulcornerSI implementation. In the application fields such as moving pictures experts group (MPEG) and joint photographic experts group (JPEG), 2-D DCT processor must be implemented precisely enough to meet the accuracy specifications of the ITU-T H.261. Almost all of 2-D DCT processors have been implemented using many multiplications and accumulations of matrices and vectors. The number of multiplications and accumulations seriously influence on comlexity and speed of 20D DCT processor. In 2-D DCT with fixed-point calculations, the computation bit width must be sufficiently large for the above accuracy specifications. It makes the reduction of hardware complexity hard. This paper proposes the accuracy compensator which compensates the accuracy of the finite word length calculation. 2-D DCT processor with the proposed accuracy compensator shows fairly reduced hardware complexity and improved processing speed.

  • PDF

A Static Test of Concrete Barrier on Bridge Deck (교량 바닥판의 콘크리트 난간에 대한 정적 실험)

  • Kang, Jun-Wook;Lee, Jae-Hoon;Woo, Kwang-Sung;Ahn, Sang-Sub;Lee, Il-Gun
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2004.11a
    • /
    • pp.33-36
    • /
    • 2004
  • The current Korea bridge design specifications have no provisions about concrete Barrier. And there are no test results of registence strength of the concrete barrier at the vehicle collision sites. This paper reports experimental results of concrete barrier on bridge deck conctructed by standard drawing of SB5 grade. Eight specimens were tested under static test. The specimens are divided by two groups (D-series and B-series). D-series is to show failure pattern of bridge deck. B-series is to show failure pattern of concrete Barrier. The test results compared with calculation results using Yield-Line theory of AASHTO LRFD Bridge Design Specifications.

  • PDF

Uncertainty Analysis of Containment Leak Rate Test System (격납건물 누설 시험장치의 불확실도 평가)

  • Lee, Kwang-Dae;Yang, Seung-Ok;Oh, Eung-Se
    • Proceedings of the KIEE Conference
    • /
    • 2004.11c
    • /
    • pp.635-637
    • /
    • 2004
  • The containment of the nuclear power plant is the last barrier of radiation release when the reactor coolant pipe rupture is occurred. Each plant has to be tested every 5 years whether the containment leak rate meets its technical specifications. We have developed the leak rate test system and in this paper, we describe the results of the uncertainty analysis on the measurement channels and its propagation to the calculation results.

  • PDF

Numerical Analysis of Acoustic Characteristics in Gas Turbine Combustor with Spatial Non-homogeneity

  • Sohn, Chae-Hoon;Cho, Han-Chang
    • Journal of Mechanical Science and Technology
    • /
    • v.18 no.8
    • /
    • pp.1461-1469
    • /
    • 2004
  • Acoustic characteristics in an industrial gas-turbine combustor are numerically investigated by a linear acoustic analysis. Spatially non-homogeneous temperature field in the combustor is considered in the numerical calculation and the characteristics are analyzed in view of acoustic instability. Acoustic analyses are conducted in the combustors without and with acoustic resonator, which is one of the acoustic-damping devices or combustion stabilization devices. It has been reported that severe pressure fluctuation frequently occurs in the adopted combustor, and the measured signal of pressure oscillation is compared with the acoustic-pressure response from the numerical calculation. The numerical results are in good agreement with the measurement data. In this regard. the phenomenon of pressure fluctuation in the combustor could be caused by acoustic instability. From the numerical results for the combustor with present acoustic resonators installed, the acoustic effects of the resonators are analyzed in the viewpoints of both the frequency tuning and the damping capacity. It is found that the resonators with present specifications are not optimized and thus, the improved specification or design is required.

A Comparative Study of Formal Methods for Safety Critical Software in Nuclear Power Plant

  • Sedo Sohn;Seong, Poong-Hyun
    • Nuclear Engineering and Technology
    • /
    • v.32 no.6
    • /
    • pp.537-548
    • /
    • 2000
  • The requirement of ultra high reliability of the safety critical software can not be demonstrated by testing alone. The specification based on formal method is recommended for safety system software. But there exist various kinds of formal methods, and this variety of formal method is recognized as an obstacle to the wide use of formal method. In this paper six different formal method have been applied to the same part of the functional requirements that is calculation algorithm intensive. The specification results were compared against the criteria that is derived from the characteristics that good software requirements specifications should have and regulatory body recommends to have. The application experience shows that the critical characteristics should be defined first, then appropriate method has to be selected. In our case, the Software Cost Reduction method was recommended for internal condition or calculation algorithm checking, and statechart method is recommended for the external behavioral description.

  • PDF

An Empirical Approach Study on Construction Cost Estimation in Public Work Projects (공공사업 예정공사비에 대한 실증적 접근)

  • Yoo, Chang-Kyu;Song, Jeong-Gyu;Lee, Yun-Sun;Kim, Jae-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.1
    • /
    • pp.65-73
    • /
    • 2009
  • Looking at current construction costs estimations of publicly declared public works, there are many instances where estimation criteria are ambiguous and doesn't imply the reality. Up to date, estimation criteria for calculating construction cost estimations are simply by unit area multiplication and stochastic construction cost estimation. However, possibility of making errors are high due to using uniform data that excludes each public work's specifications and environmental conditions. Further, on the aspect of cost management, there is certain limitation in the efficiency of cost management in order-placing stage and commencing-work stage; while efficient cost management and reduction of expenses are highly possible during initial stages of the project. In this respect, the paper adopts positive approach with regards to construction cost estimations of public works and draws common elements from calculation tables of the construction cost estimations from 3 completed domestic construction works; after which, the paper analyzes whether business exposition, construction guide and publicly-declared estimated construction costs that the orderer issued are calculated economically and properly; deducing problems in the process, the paper seeks to recommend rational calculation method on this.