• Title/Summary/Keyword: Characteristic of Design Change in Private Construction

Search Result 1, Processing Time 0.016 seconds

An Analysis of the Cognition of Professionals Regarding the Validity of Planting Design Change that Occurred in the Landscape Construction of a Major Private Company (민간기업 조경공사에서 나타나는 식재설계 변경 타당성에 대한 전문가 인식 분석)

  • Park, Jae-Young;Cho, Se-Hwan
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.42 no.6
    • /
    • pp.101-110
    • /
    • 2014
  • This study analyzes the validity of the type classification of the type and design changes of apartment landscaping planting construction design changes that were completed in the private sector, efficiently manages the design changes that are displayed over landscaping planting work in general in the future, and performs research by placing the object underlying the presentation. The results are as follows. First, the percentage that occurred in the planting construction of design changes that have occurred in the apartment landscaping construction was carried out in the private sector and accounted for 61.8%. This indicates that part of the planting is a major design change. Second, as the cause of such a design change to be those associated with the field conditions such as lack of main construction period. In particular, due to a change in oral, appeared 7-48 times design changes of one review design change approval is complex, design changes of planting construction had shown a feature that occurs in multiple simultaneous. Third, the 7 types of Design Changes in planting design were delineated as 'design changes for consideration of the user', 'design changes for image improvement', 'design changes for ease of maintenance', 'design changes due to the mismatch of design statement', 'design changes due to the relationship with the engineering species of other', 'design changes due to lack of field study', and 'design changes due to the consideration of feasibility.' Fourth, 'design changes for consideration of the user' and 'design changes for image improvement' were found in more than half of the frequency of the overall changes. This differed from the results shown in public corporations. Fifth, if planting construction design change process, private companies, it was found that is showing the approval of the practice after the previous construction of the construction cost savings due to construction time. However, in the case of a public corporation, these exhibited a different aspect from the private sector and show a design change procedure that reflects the changes after the design change events in the field have occurred. The above results, the type of landscaping works in planting design change of public enterprises, regardless of the private sector, is the same in the seven types, the main reason of and procedures for design changes, indicating that there are other respects. In design change, it may be desirable to apply becomes liquidity rationality and efficiency of the dimension, depending on the nature of the landscape construction.