• Title/Summary/Keyword: Civil Project

Search Result 1,610, Processing Time 0.028 seconds

A Study on Optimal Duration Estimation for Construction Activity

  • Cho, Bit Na;Kim, Young Hwan;Kim, Min Seo;Jeong, Tae Woon;Kim, Chang Hak;Kang, Leen Seok
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.612-613
    • /
    • 2015
  • As a construction project is recently becoming large-scaled and complex, construction process plan and management for successful performance of a construction project has become more important. Especially a reasonable estimation plan of activity duration is required because the activity duration is directly related to the determination of the entire project duration and budget. However, the activity duration is used to estimate by the experience of a construction manager and past construction records. Furthermore, the prediction of activity duration is more difficult because there is some uncertainty caused by various influencing factors in a construction project. This study suggests an estimation model of construction activity duration using neural network theory for a more systematic and objective estimation of each activity duration. Because suggested model estimates the activity duration by a reasonable schedule plan, it is expected to reduce the error between planning duration and actual duration in a construction project. And it can be a more systematic estimation method of activity duration comparing to the estimation method by experience of project manager.

  • PDF

QUANTITATIVE ANALYSIS ON PROJECT PERFORMANCE ANALYSIS AND DELIVERY METHODS

  • Seta Ohanesian;Jin-Lee Kim;Tang-Hung Nguyen;Ok-Kyue Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.332-337
    • /
    • 2013
  • Various project delivery methods have been utilized by owners over the years to maximize project performance. The design-build delivery method is being increasingly used due to the advantages it can offer to an engineering construction industry. Numerous studies have advocated the use of design/build over the traditional design/bid/build delivery approach. This study represents comprehensive analysis of 40 projects from the construction industry and shows that design/build method may not provide all the benefits to project performance. This study found timesaving was a definitive advantage of design/build project delivery, but the positive effects of cost changes was not convincing. Based on the results of the study, the project management expertise and experience of the contractor may have a greater impact on project performance outcomes than focusing on project delivery strategy only.

  • PDF

Analyzing Characteristics of Construction Complaints with Construction Project Type

  • Lee, Ju-Hui;Lee, Changjun;Yun, Sungmin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.3
    • /
    • pp.52-61
    • /
    • 2023
  • Conflicts in a construction project not only make negative impacts on project performance such as schedule delay or cost overrun but also require social cost to resolve the conflicts. Although the conflict needs a preemptive management because a conflict usually begins with a complaint, existing studies have focused on conflict resolution after it occurs. This study identifies and categorizes complaints which mainly appear in the construction projects. Those complaints were evaluated and quantified in terms of occurrence frequency and potential to conflict through a questionnaire survey with industry experts. Using the survey results, this study examines the characteristic of complaints in linear project and clustered project, and analyzes what kind of complaints occur by project type. As the results, this study derives the complaints with high potential to the conflicts that should be managed first during managing a construction project in each project type.

RISK MANAGEMENT IN CIVIL CONSTRUCTION PROJECTS - FROM COST ESTIMATING PERSPECTIVE

  • Ashley Jaensch;Jian Zuo;Nicholas Chileshe
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.162-167
    • /
    • 2011
  • Construction projects are full of risks. This is particularly the case in civil construction projects that are often featured with large scale, complexity and involving a large number of participating parties. The eventuation of risks typically results in extended project durations leading to an increase in the total project budget. The consequence can be amplified considering the significant impacts of civil construction projects on the society, from economical, environmental and social perspectives. This research investigates the significance of risks within civil construction projects and approaches to deal with risks. Semi-structured interviews were undertaken with local industry practitioners in South Australia on this matter. It is found that the industry is fairly aware of risks associated with civil construction projects and subsequently has procedures in place to attempt to minimize the impacts of these risks on the project outcomes. The interview results also indicate that there is limited utilization of software for the risk management purpose from the cost estimation perspective.

  • PDF

3D Earthwork BIM Design Process for a Road Project

  • Raza, Hassnain;Park, Sang-Il;Lee, Seung Soo;Tanoli, Waqas Arshad;Seo, Jongwon
    • Journal of KIBIM
    • /
    • v.7 no.2
    • /
    • pp.8-15
    • /
    • 2017
  • Building Information modeling is playing an important role in transforming the construction industry. It helped the industry with better visualization, minimum design errors, and excellent planning of the construction activities. Time and cost saving can be effectively achieved by using BIM for any construction project. It improves information exchange between all the project stakeholders. However, the development of earthwork 3D BIM is still underway and has not been fully implemented yet. This paper presents the study of a complete process for Earthwork BIM design using Autodesk Civil 3D. A real site road construction project is used as a case study to explain the process of earthwork modeling, starting from laser scanning to 3D model. Quantity take off calculation is very important part of any road construction project so during this study earthwork volume from two 3D earthwork model is calculated. The results obtained through this study will be the basis for future work which has been concluded in this paper.

INTEGRATED PERFORMANCE MANAGEMENT FOR WHOLE PHASES OF URBAN RENEWAL MEGAPROJECTS

  • Heedae Park;Kang-Wook Lee;Seung Heon Han
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1463-1467
    • /
    • 2009
  • Construction projects are vulnerable to diverse internal and external factors, requiring systematic and consistent performance management along the entire life cycle of a project. In particular, urban renewal projects have a range of performance measures, including policy reconciliation and permits, project development, project financing, design, construction, and occupancy and maintenance. This requires a program-level megaproject approach, which integrates each stage of a project as well as variety of stakeholders' interests in pursuing a project from different perspectives. However, previous research on performance management has focused especially on the limited scopes of factors, including cost, quality, and schedule at the project level or on financial factors at the firm level. Given the lack of current approaches, this study suggests an integrated and systematic performance management scheme to control urban renewal megaprojects at the broadened perspectives of the program level. To this end, this study adopts the balanced scorecard approach and elicits key performance indices associated with various project configurations. Finally, an algorithm is presented for quantitatively assessing the level of performances along whole life cycle of urban renewal megaprojects.

  • PDF

Conflict Analysis in Construction Project with Unstructured Data: A Case Study of Jeju Naval Base Project in South Korea

  • Baek, Seungwon;Han, Seung Heon;Lee, Changjun;Jang, Woosik;Ock, Jong Ho
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.291-296
    • /
    • 2017
  • Infrastructure development as national project suffers from social conflict which is one of main risk to be managed. Social conflicts have a negative impact on not only the social integration but also the national economy as they require enormous social costs to be solved. Against this backdrop, this study analyzes social conflict using articles published by online news media based on web-crawling and natural language processing (NLP) techniques. As an illustrative case, the Jeju Naval Base (JNB) project which is one of representative conflict case in South Korea is analyzed. Total of 21,788 articles and representative keywords are identified annually. Additionally, comparative analysis is conducted between the extracted keywords and actual events occurred during the project. The authors explain actual events in the JNB project based on the extracted words by the year. This study contributes to analyze social conflict and to extract meaningful information from unstructured data.

  • PDF

ORGANIZATIONAL AND COMMUNICATION ISSUES FOR MANAGING DESIGN-BUILD HIGHWAY PROJECTS

  • G. Edward Jr. Gibson;James T. O'Connor;Giovanni C. Migliaccio;Pramen P. Shrestha
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.974-979
    • /
    • 2005
  • Effective communication flow is a fundamental for the success of any construction projects. The key role of communications among project parties is even more critical in the case of Design-Build (DB) projects. Previous research has shown that these projects have an environment where integration between different project team members and schedule constraints increase channels of communication, and require faster communication flows. This paper summarizes the findings from research analyzing organizational structures and communication flow of the Texas State Highway 130 (SH130) project. Awarded in 2002, the SH130 project, totaling $1.3 billion USD, constitutes the "pilot" application for the DB approach in the state of Texas. A set of observations pertaining to team organization and communication issues in the design-build environment is included.

  • PDF

APPLICATION OF FUZZY LINEAR PROGRAMMING FOR TIME COST TRADEOFF ANALYSIS

  • Vellanki S.S. Kumar;Mir Iqbal Faheem;Eshwar. K;GCS Reddy
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.69-78
    • /
    • 2007
  • In real world, the project managers handle conflicting goals that govern the use of resources within the stipulated time and budget with required quality and safety. These conflicting goals are required to be optimized simultaneously by the project managers in the framework of fuzzy aspiration levels. The fuzzy linear programming model proposed herein helps project managers to minimize total project costs, completion time, and crashing costs considering indirect costs, contractual penalty costs etc by practically charging them in terms of direct cost of the project. A case study of bituminous pavement under construction is considered to demonstrate the feasibility of applying the proposed model for optimization of project parameters. Consequently, the proposed model yields an efficient compromise solution and the decision maker's overall degree of satisfaction with multiple fuzzy goal values. Additionally, the proposed model provides a systematic decision-making framework, enabling decision maker to interactively modify the fuzzy data and model parameters until a satisfactory solution is obtained. The significant characteristics that differentiate the proposed model with other models include, flexible decision-making process, multiple objective functions, and wide-ranging decision information.

  • PDF