COST ANALYSIS OF STRUCTURAL PLAN FOR REDUCING FRAMEWORK CONSTRUCTION DURATION OF REINFORCED CONCRETE RESIDENTIAL BUILDINGS

  • Seon-Woo Joo;Moonseo Park;Hyun-Soo Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.493-498
    • /
    • 2009
  • Recently, the number of complex construction projects, such as high-density development and long-span mega structure construction, has been increasing globally. Therefore, the construction duration has become an even more important factor for success. Nevertheless, in domestic residential construction projects, it usually takes more time than twice as much as North American cases. The long construction duration causes a number of problems, for example growth of financial costs, fall in productivity, and weakness of competitiveness. If the framework construction duration can be shortened to 3 ~ 4 days, then it is also expected to complete the finish work of building in shorter duration, be led to reduce the entire construction duration, and eventually to save a great deal of indirect costs. For shortening the construction duration, previous researches pointed out that the development of simplified plan design should precedes. But, in reality, lack of experience of new design and innovative techniques tends to be the obstacle to wide adoption of the simplified plan design in construction fields. In this paper, a simplified structural plan design is proposed, and the construction cost is quantitatively compared between when traditional construction technique is applied to the traditional plan and when the duration-shortening key technique is applied to the developed plan.

  • PDF

A Study on the Improvement of the Safety Management Plan under the Construction Technology Promotion Act by Field Survey (현장실태조사를 통한 건설기술진흥법 상 안전관리계획서의 개선방향에 대한 연구)

  • Yoon, Young Geun;Lee, Myeong-Gu;Oh, Tae Keun
    • Journal of the Korean Society of Safety
    • /
    • v.33 no.4
    • /
    • pp.30-37
    • /
    • 2018
  • Although the safety management plan review system according to the Construction Technology Promotion Act for securing the safety of the construction work is a fundamental system essential for the prevention of the construction industry disaster, the necessity of its improvement has been raised because it often fails to meet the original purpose. In this study, through the analysis of the effect of the safety management plan and the problems of the operation, we suggest ways to improve it in view of the construction accident reduction and conducted surveys on the construction site through the questionnaires of the client, construction company, and construction business technology manager. In order to improve the effectiveness of this system as a result of the study, it is necessary to distribute the guidelines for the preparation of the safety management plan, manuals, etc., to simplify the contents of the safety management plan, also the step-by-step approval of the safety plan can be a solution. For this, it is necessary to revise the policy through consultation with the Ministry of Land, Transport and Maritime Affairs and related experts.

The Third Construction Technology Development Master Plan (제3차 건설기술진흥기본계획)

  • Ji Sang-Wuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.202-206
    • /
    • 2002
  • $\lceil$The Construction Technology Development Master Plan$\rfloor$ aimed to promote construction technology R&D and to use its result efficiently is a legal plan based on Construction Technology and Management Law and established every five years. Now $\lceil$The 3th Construction Technology Development Master Plan(The 3th Master Plan)$\rfloor$ is establishing by MOCT(Ministry of Construction & Transportation) because the 2th Master Plan is completed at 2002. The 3th Master Plan suggests 'Establishment of construction environment leading the world-wide construction market' as a long-term vision, and also presents basic targets ; 'Improvement of competitiveness through conducting construction project efficiently', 'Transform into technology-oriented industry'. It consists of 7 fields and 25 main subjects. The 7 fields are construction manpower, production system, environment, safety, construction information, construction engineering, construction R&D.

  • PDF

A Study on the Consideration for Factors Affecting Production Plan Establishment of Precast Concrete Members (PC부재의 생산계획 수립에 영향을 미치는 요인 고찰에 관한 연구)

  • Jun, Young-Hun;Shin, Eun-Young;Yun, Won-Gun;Kim, Kyong-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.253-254
    • /
    • 2023
  • The production plan of Precast Concrete members is closely related to the assembly plan of Precast Concrete members, and is an important management factor for the process planning of Precast Concrete construction. This may cause a delay in the construction period due to manufacturing errors occurring in the production process of members and transportation errors according to the production sequence. Therefore, it is necessary to have an efficient production plan for Precast Concrete members that can produce the necessary quantity from the point of assembly of the members and supply them in a timely manner. This study is a basic study for establishing a production plan for Precast Concrete members, and the purpose of the study is to examine the factors that affect the establishment of a production plan for Precast Concrete members. In this study, the influencing factors according to the production method and conditions when establishing a production plan for Precast Concrete members were considered. In the future, correlation analysis among influencing factors will be carried out, and it is expected that it will be used as basic data for schedule management of Precast Concrete construction and derivation of construction period calculation standards.

  • PDF

Investigation on the Manpower Staffing Plan Utiling Density Analysis Method (밀도분석에 의한 공동주택 현장관리 인력 배치계획 분석)

  • Kwon, Gi-Deoc;Kim, Sun-Kuk;Sohn, Hyo-Won;Choi, Jae-Hwi;Lee, Dong-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.119-123
    • /
    • 2010
  • Recent economic slump has highlighted the needs for the construction industry to develop strategies to improve productivity and overhaul organization structure. Notably, it is urgent to improve productivity of apartment building construction projects that account for about half of the aggregate revenue of building construction projects in Korea. As construction site management manpower staffing plan has close relation with the productivity of building construction, it is essential to staff construction sites adequately in consideration of site conditions and characteristics. However, construction companies of Korea are still far from developing site management manpower staffing plan in reference to quantitative standards. Therefore, this research aims to analyze site management manpower staffing plan of apartment building construction project by means of density analysis. To be more specific, site organization charts and staffing plans of apartment building construction projects put together by large construction companies in Korea are studied and essential resources and their mobilization time of apartment building construction projects are examined. Conclusions herein will provide basic inputs to subsequent studies of apartment building construction site management manpower staffing standards.

  • PDF

A Study on the Process of Tower Crane Construction Planning in Steel Structure (철골공사에서의 타워크레인 양중계획 프로세스에 관한 연구)

  • Jung, Deok-Gi;Park, Jung-Lo;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.145-146
    • /
    • 2011
  • Lifting plan in conjunction with the overall construction plan will be established. It is being created by executive director of the Corporation and other such as an experienced site manager. But, written lifting plan based on the limited information and experience is causing some problems such as decreasing productivity, workability loss, delay. The reasons for the problems are lack of prediction of construction execution, inappropriate materials on the past performance, individual experience, limits of knowledge, lack of technical materials, shortage of advisor. Therefore, to solve the problems, we have to overcome the situation in which we depends on lifting planner's experience and intuition, limited information by accumulating objective and reliable materials. Because unorganized lifting plan will lower efficiency of lifting equipment and make reducing construction period difficult. In this study, influence factors on lifting plans will be derived through reviewing literatures and lifting plan cases. Derived influence factors will be classified as components and classes, classified influence factors are assessed suitability. Also, Decision making items are derived from the factors. Finally, tower crane lifting plan process will be suggested from the result.

  • PDF

A Fundamental Study on Management Plan of Occurrence Data in Accordance with Engineering & Construction of Pipeline in Frozen Soil Region (동토지역 파이프라인 설계/시공에 따른 발생 데이터의 관리방안에 관한 기초연구)

  • Kim, Chang-Han;Won, Seo-Kyung;Lee, Jun-Bok;Han, Choong-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.20-21
    • /
    • 2014
  • Recently, activation of related construction projects due to the large traditional gas resource development of frozen soil region of Russia are expected. It is necessary to provide a plan that can be utilized and collectively managed the occurrence data in the engineering & construction stage for continued contracts of the pipe construction. Therefore, this research is aimed to provide a management plan of occurrence data for efficient management in engineering & construction stage of pipeline business in frozen soil region. The data of the engineering & construction(related pipe construction projects) can be accumulated each version and multiply managed. Furthermore, I will be expected to be the foundation of the systematic management of the classifying based on metadata and the optimizing operations using big data method.

  • PDF

A Study on the Plan Establishing Process Data System for the Process Plan of Construction Works (건설공사의 공정계획을 위한 공정정보 시스템 구축에 관한 연구)

  • 안효수;권춘안
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2001.11a
    • /
    • pp.142-147
    • /
    • 2001
  • Recently, as the field of construction industrial is enlarged and the blanket control system is formed, the process plan considered from initial process formation to construction cost must be systematic and rational. So we have to propose and compose the new process formation system that divides the intention decisive property of construction data, its relationship and the data property according to process definitely and can express and control easily the public ownership of construction data and network process under the peculation control. So this study decides the field formation and construction data of the work according to the ordering and contract way to establish the process data system for the process plan, shows that the lot theory is necessary to form the economical construction field and proposes that the integrated formation system of construction data that is made by code system must be established.

  • PDF

A MODEL OF RISK MANAGEMENT PLAN AND SYSTEM FOR THE CONSTRUCTION PHASE

  • Seon-Gyoo Kim;Chan-Jeong Park ;Moon-Serk Yang;Jin-Bong Kim ;Hyung-John Shin
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.341-346
    • /
    • 2005
  • After the IMF shock, some major construction companies in Korea have been motivated to avoid and mitigate various risk factors which could be critical and catastrophic events to corporate revenue and organization internally or externally. It means that they are trying to introduce and set up a risk management plan and system suitable to their organization and culture. L construction co. ltd. is one of major construction companies that have been searching methodologies or technologies to manage various risk factors surrounding corporate marketing and project operation. This paper presents an unique approach to develop a model of risk management plan and system suitable to L construction itself focused on the construction phase.

  • PDF

Analysis on Construction Clients' Role for Safety and Health Management in Plan, Design, and Construction Stage (건설공사 발주자의 계획, 설계, 공사단계 안전보건관리 역할 분석)

  • Lim, Se Jong;Jeong, Seong-choon;Na, Ye Ji;Won, Jeong-Hun
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.3
    • /
    • pp.24-31
    • /
    • 2020
  • The duty of construction clients in WSH (Workplace Safety and Health) system was included in the amendment of Occupational Safety and Health Act (enforced on 16 January 2020), which was estimated the shift of paradigm in the prevention of construction accidents. The purpose of this paper is to introduce the analysis results of construction clients' role in the construction project, which were performed by authors over the recent years in order to impose the duty on construction clients, and to suggest their role according the plan, design, and construction stage. Utilizing the systematic literature review process based on Meta analysis, the related papers were selected. For the selected papers, related domestic and foreign regulations, and other prominent report, the construction clients' role was analyzed by reflecting the experts' advice. Results show that the construction clients should control the designer and contractor for implementing the WHS system during the whole process of the construction project. They should supply sufficient source and time to ensure the workers' safety. In the plan stage, the key role of construction clients is to identify intensively controlled hazard and risk reduction plan and to transfer the results. In the design stage, their key role is to select the designer with the capacity in WSH and to assist the designer for the safety design. The main key role of construction clients in the costruction stage is to select the contractor with specialty in WSH including a contract reflecting the WSH requirement and to check implementation of WSH plan, WSH cost, WSH education, and accident report. In addition, it is thought that the construction clients' participations in the site WSH activity and adjustment of safety and health problem among contractors can be effect in the prevention of construction accidents.